Loft insulation in Kinson

Thin old loft insulation brought up to full depth over the semis and bungalows of Kinson, with the eaves kept clear.

The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.

Last updated

Most lofts in Kinson sit over early post-war semis and bungalows, and most still hold a thin layer that went down decades ago. Bringing it up to about 270mm means a second layer laid across the first, vent trays at the eaves, and nothing in the purlins or struts touched. Walls and floors are on insulation in Kinson.

A cold winter shows up a thin loft in Kinson. A bungalow where every room has a ceiling straight under the roof and the heating bill shows it. A loft that was boarded for storage so long ago that nobody knows what is under the boards. Or black mould spotting the bedroom ceiling along the outside wall.

Thomas climbs into your Kinson loft, lifts a board, measures what is there with a rule and shines a torch down each eave. Then you get a free written itemised quote. If the loft is fine already and the cold is coming from a wall or a floor, he tells you so.

The work

Cut roofs, bungalows and a lot of old wool

Mineral wool insulation laid between and over the ceiling joists in a loft (illustrative photo for loft insulation in Kinson)
Two layers, crossedThe second layer runs across the joists so the timber stops being a cold bridge. Illustrative photo.

The top-up comes first. An early post-war Kinson loft usually holds a grey, flattened layer, missing wherever cables were run or someone crawled over to the tank. Anything wet from an old leak or contaminated with droppings is bagged and taken down; what is sound is evened out and kept.

Glass wool or Rockwool roll then fills between the ceiling joists, and a second roll crosses them at right angles, so the timbers stop acting as a cold bridge every 400mm. That takes the ceiling to the 0.16 U-value Approved Document L expects when a roof is upgraded, with loose fill or batts round the struts where a roll will not go, and sheep wool if you would rather have a natural fibre. It is one of the cheaper ways to lift an EPC, and most semis take a day.

Bungalows. In a Kinson bungalow the loft covers the whole house, so it is the biggest saving on the heating bill. It is also the hardest to get right at the edges, where the rafters come down low over the wall plate. That is where insulation gets pushed in until it blocks the air gap under the felt. We fit a vent tray in each bay first, then take the full depth out to the wall so the edge of every room is covered and the roof still has cross ventilation. An insulated loft runs colder, so without that airflow the dew point sits on the underside of the felt. A long bungalow loft can take a second day.

Storage. In a cut roof the ceiling joists were sized for a ceiling, not a floor. So storage goes on a small raised platform on loft legs near the hatch, above the full depth, rather than boarding across the whole loft. The hatch is insulated and a loft ladder fitted if you want one.

Owners, tenants and flats. Much of Kinson was built by the old Bournemouth council, and plenty of those houses have since been bought and sold on. If you own yours, you instruct the work. If you rent from BCP Council, the loft is theirs to insulate, so report it to them rather than booking a builder. In a flat, the roof space belongs to the freeholder, and a job for the whole block comes through the managing agent. On a semi, the party wall in the loft is checked too, so heat and smoke cannot pass over the top of it to next door.

Cables, tank and lights. Cables are lifted to sit on top rather than buried, recessed downlighters get proper covers, and the tank and pipework left in the cold are lagged.

Rooms in the roof. Some bungalows in Kinson have had a room put in with a dormer. The sloping ceiling is insulated at the rafters with PIR rigid board such as Celotex, keeping an air gap under the felt or underlay, with a vapour control layer inside, aiming at 0.18. A multi-foil helps where headroom is short.

When we would say wait. Black mould on a bungalow ceiling that comes from a bathroom with no extract fan will not stop because the loft is deeper. The fan goes in first.

How it runs

From your call to a written price

One person to ring from the first visit to the last. The quote is itemised, not a figure on the back of a card: the survey, clearing and bagging whatever is up there now, the material and its depth, keeping the eaves clear, the hatch and any pipework, and disposal on separate lines, so you can compare it properly against anyone else's.

Nothing is left open or unusable overnight. The site is swept at the end of each day rather than the end of the job, and what comes out leaves with us. If something turns up once we start that nobody could have seen, you get a photograph and a price before we carry on.

Loft insulation needs no planning application, as the Planning Portal guidance on insulation confirms, and Kinson has no conservation area in any case. Installing energy saving materials in a home is zero-rated for VAT until 31 March 2027 under HMRC VAT Notice 708/6, and we are not VAT registered, so our quote carries no VAT. A listed building such as Kinson Vicarage needs listed building consent for work inside too.

Cost

What decides the price of a loft

Rigid insulation board fitted between the rafters in a loft (one of our own jobs, shown for loft insulation in Kinson)
Board where depth is shortRigid board earns its place where the headroom will not take quilt. Photo from one of our own jobs.

No rate per square metre, because the floor area is the easy part and the awkward edges are where the time goes.

Getting to it. A bungalow with a long, low loft and eaves all the way round, a semi with the hatch over the stairs, and an end terrace with a boarded loft full of boxes all price differently. A hatch on a landing you can stand a ladder under is one job. A hatch over a stairwell, a crawl space you can only move through on your knees, or a loft full of boarding that has to come up and go back, is time before any material is laid.

What is up there now, and what it is sitting on. Old material that has to come out, be bagged and taken away is a cost before anything new goes down, and so is a loft full of boxes that has to be emptied and put back. Joists at 400 centres with a flat run across them is a different afternoon from a trussed roof full of bracing.

Ventilation, and the edges nobody reaches. Insulation stops at the wall plate and the eaves have to stay clear, or you trade a warm bedroom for a wet roof. Getting depth right into the corners and around the hatch, boxing over downlighters and lagging anything that now sits in the cold, is most of the labour. Approved Document L sets what the work is expected to reach.

Comparing quotes? Ask what depth is actually being laid and in how many layers, whether the old material is coming out or being covered over, whether the eaves are being kept clear, what happens to anything you store up there, and whether the hatch and the pipework are included.

If the loft is wet

Water running off the felt, or mould on the underside

A loft insulated at rafter level with the gable filled and a rooflight fitted (one of our own jobs, shown for loft insulation in Kinson)
At rafter levelA room in the roof is a different job from a cold loft floor. Photo from one of our own jobs.

Ring rather than use the form. Droplets on the underside of the felt, black mould spreading across the roof timbers, or insulation that is visibly damp are all telling you the same thing: warm wet air is getting into a space that cannot breathe.

That does not wait, because it is the timbers that pay for it. We look before anything is added, because putting more insulation into a loft that cannot ventilate makes it worse. In a Kinson bungalow the first place to look is the eaves on each side, because a low roof with its vents buried under old insulation is the usual reason the felt starts to drip. Scheduled work runs Monday to Friday, 8am to 6pm. For anything urgent, ring rather than use the form, and if we cannot pick up we ring you back as soon as we can.

Call now: 07435 839745

Worth knowing

A roof built before trusses

Plasterboard taped and jointed on a lined loft wall (illustrative photo for loft insulation in Kinson)
Lined, then tapedWhere the loft becomes a room, the boarding and the joints come next. Illustrative photo.

Most of Kinson went up in the ten years or so after the war, before factory-made trussed rafters became the normal way to build a roof in the sixties.

So the typical loft here is a cut roof, built on site: rafters resting on purlins, the purlins propped by struts down to a wall or a binder, and ceiling joists tying the feet together. It is a more open space than a trussed loft, easier to move around in and easier to insulate well, which is good news.

A loft of this age also needs watching for its structure. The struts and purlins are holding the roof up, so nothing is cut or moved to make room for insulation or storage, however much it is in the way. And the ceiling joists were sized for a ceiling, not a floor, so a storage platform stays sensible and spreads its load. One more thing turns up in lofts of this age now and then: a loose, gold or brown granular fill between the joists. That can be vermiculite, which may contain asbestos. If we find it, we stop, leave it undisturbed and have it tested before anything else happens.

Who you are dealing with

A local firm you can check

We insulate lofts across Kinson in BH10 and BH11, from the old village by St Andrew's Church out to Bear Cross, West Howe and Ensbury Park, 3.7 miles from our base in Boscombe, with BCP Council for building control.

You are dealing with Bournemouth Roofing & Building, the trading name of Bournemouth Roofing & Building Ltd, registered in England and Wales, company number 15471719, which you can look up in a minute. Thomas Hannen's business, and he is the one who comes out to price the job, not a salesman. A verified customer's 10 out of 10 on Checkatrade. The visit and the written quote are both free. Before you book a visit in Kinson, you can read our customers' Google reviews, word for word, on our reviews page.

Planning at a glance

Do you need planning permission in Kinson?

Most repairs in Kinson need no application at all. What decides whether a change to the outside of your house does is who the council is, whether a conservation area or a listing applies, and whether the place sits in a protected landscape.

The planning position in Kinson, from council and national records.
Question In Kinson
Who decides BCP Council is the planning authority for Kinson. BCP Council's heritage pages set out what it controls.
Conservation area None covers Kinson, so a like-for-like repair is ordinary maintenance.
Listed buildings Yes, there are listed buildings in and around Kinson. If yours is one, work can need listed building consent.
Protected landscape No National Park or National Landscape covers Kinson.

Questions

Questions about loft insulation in Kinson

Is it worth topping up a loft that already has some insulation?

Almost always in a house of this age. The old layer sits level with the joists at best, and the second layer laid across them does most of the work.

Can I still use my loft for storage?

Yes. We lay the full depth and fit a raised platform on loft legs above it, kept light, because the ceiling joists were never meant to carry a floor.

Is there VAT on loft insulation?

No, we are not VAT registered, so none is added. For firms that are, insulation fitted in a home is zero rated until 31 March 2027.

Will it be messy inside the house?

Very little: sheets cover the floor from the front door to the hatch, the old wool is bagged up in the roof before it is carried down, and the landing is hoovered before we go.

Do you work in winter?

Yes. Everything happens inside the roof, so rain makes no difference, and a Kinson winter is when a bungalow feels the change most.

Nearby, and next door

Loft insulation near Kinson

Free quote

Find out how deep your loft really is

We go up, lift a board, measure the depth and check the eaves, then give you a written itemised price. The visit and the quote cost nothing.