Loft insulation in Cranborne
Clearing, topping up and laying to full depth in Cranborne roof spaces, with the ventilation sorted before any material goes down.
The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.
The direct answer

If your heat is bought by the tankful rather than off a gas main, the loft is the first thing to spend money on and the last thing to skimp. Full depth, two layers, and the eaves left open so the roof can still breathe.
Three things bring people here to the phone. A cold upstairs that the boiler never quite gets ahead of. A loft somebody has finally looked into and found thin, flattened or bare at the edges. Or condensation showing up on the underside of the felt, with black mould starting on the rafters.
Whichever of those it is, we come out and look before there is any talk of depth. What is up there, how deep it truly is, where the joists run, whether the eaves are open, and what has been stored on top of it. The site visit is free and so is the itemised written quote. If the ceiling is already fine, we would rather tell you that than sell you rolls.
The work
What a Cranborne loft usually needs

Taking stock of what is there. Very few lofts we open are empty and very few are right. The usual picture is an old layer that has settled to two thirds of what it started at, compressed hard wherever anyone has walked, patchy where a cable or an aerial went in, and stopping well short of the wall. Anything contaminated with droppings, or damp from a slipped tile, comes out in bags and leaves with us. Sound material stays put and gets built on.
The depth, and why the second layer runs the other way. Finished depth is about 270mm. The first layer of mineral wool roll sits between the joists, friction fitted so there is no gap at the edge, and the second is cross laid over the joists so the timber itself is covered. Leave the joists proud and every one of them becomes a cold bridge, which is why a loft that looks tidy from the hatch can still be losing heat in stripes. Glass wool roll suits most bays, rockwool batts suit a cut roof with odd spacings, and loose fill goes where a roll will not lie flat. Approved Document L sets the U value the finished ceiling should reach.
Air, before insulation. Insulating a ceiling makes the roof above it colder, which moves the dew point up into the structure. Warm vapour drifting out of the house then meets cold felt, and you get droplets, damp insulation and mould on the timbers. So the eaves stay clear. Insulation stops on the wall plate, vent trays hold it back so there is an unbroken air gap, and cross ventilation moves air from one eaves to the other. On a roof where the eaves are closed up, ridge vents or vent tiles take over. Approved Document F is the standard behind it.
What else lives up there. Downlighters get rated covers so they are not smothered. Cables are pulled clear of the wool and clipped to the joists. In older houses there is usually a cold water tank and a run of pipework that has just been moved to the cold side of the building, so lagging and a tank jacket go on the same visit. The hatch gets insulated on its back and draught sealed, because a bare trap is a hole in a good ceiling.
Storage, and the parts with no loft at all. Where you need the space, a raised floor on loft legs keeps the boarding clear of the full depth instead of crushing it. Plenty of older houses here have rooms tucked into the roof, so there is no flat loft to roll out: that is rafter level work, rigid PIR board cut between the rafters with a clear gap under the underlay, a layer beneath, taped joints, and a warm roof build up that keeps interstitial condensation out of the timber.
How it runs
From your call to a written price

Same team from first visit to last, one person to ring, and no sub-contracting your work out to somebody you have never met. The quote is itemised, not a figure on the back of a card: the survey, clearing and bagging whatever is up there now, the material and its depth, keeping the eaves clear, the hatch and any pipework, and disposal on separate lines, so you can compare it properly against anyone else's.
Nothing is left open or unusable overnight. The site is swept at the end of each day rather than the end of the job, and what comes out leaves with us. If something turns up once we start that nobody could have seen, you get a photograph and a price before we carry on.
Nothing about insulating a roof space counts as development, so there is no application and permitted development rights are not touched, which Planning Portal guidance on insulation confirms. Building control still has a say, because regulation 23 brings a whole element up to current standard once more than half of it is renovated. Cranborne has its own conservation area and there are a couple of dozen listed entries near here, Cranborne Manor House among them, so listed building consent is the place to start if your house is listed, since consent covers internal work too. The VAT treatment of energy saving materials is worth checking before you order.
Cost
What decides the price of a loft

No rate per square metre, because the floor area is the easy part and the awkward edges are where the time goes.
Getting to it. A village house with a hatch on the landing is one job, a cottage with a trap over the stairs and a crawl of a roof space is another, and a converted barn with no loft floor at all is a third. A hatch on a landing you can stand a ladder under is one job. A hatch over a stairwell, a crawl space you can only move through on your knees, or a loft full of boarding that has to come up and go back, is time before any material is laid.
What is up there now, and what it is sitting on. Old material that has to come out, be bagged and taken away is a cost before anything new goes down, and so is a loft full of boxes that has to be emptied and put back. Joists at 400 centres with a flat run across them is a different afternoon from a trussed roof full of bracing.
Ventilation, and the edges nobody reaches. Insulation stops at the wall plate and the eaves have to stay clear, or you trade a warm bedroom for a wet roof. Getting depth right into the corners and around the hatch, boxing over downlighters and lagging anything that now sits in the cold, is most of the labour. Approved Document L sets what the work is expected to reach.
Comparing quotes? Ask what depth is actually being laid and in how many layers, whether the old material is coming out or being covered over, whether the eaves are being kept clear, what happens to anything you store up there, and whether the hatch and the pipework are included. Two quotes for the same job are usually two different jobs.
If the loft is wet
Water running off the felt, or mould on the underside
Ring rather than use the form. Droplets on the underside of the felt, black mould spreading across the roof timbers, or insulation that is visibly damp are all telling you the same thing: warm wet air is getting into a space that cannot breathe. That does not wait, because it is the timbers that pay for it. We look before anything is added, because putting more insulation into a loft that cannot ventilate makes it worse. Cranborne is a run out from us, but a roof space that has gone wet gets seen inside a day or two. The phone is answered 24 hours for emergencies; scheduled work runs Monday to Friday, 8am to 6pm.
Worth knowing
Off the gas main, the loft is worth more
A lot of Cranborne is not on the gas main. Heat comes out of an oil tank in the garden, or off bottled gas, or straight off the meter. That does not change one thing about how we lay insulation. It changes what the same insulation is worth to you, because the fabric decides how much heat you have to buy and the fuel decides what that heat costs. The same loft, done to the same depth, saves more in an oil heated house than in one on mains gas.
It also changes the order in which we would spend your money. On oil the demand shows up as a delivery rather than a monthly bill, so it is easy to miss how much of it goes through the ceiling. Ceiling depth and draught sealing come first, because they cut what the boiler has to make. Then the sloping ceilings and the room in roof, which in an older house are often losing more than the flat loft ever did. Then everything else. If somebody has quoted you for a new boiler and nobody has been up into the roof, get the roof looked at first.
Who you are dealing with
A local firm you can check
We cover Cranborne, Boveridge, Alderholt, Verwood and the BH21 villages on the chase, with Dorset Council for planning and building control. You are dealing with Bournemouth Roofing & Building, the trading name of Bournemouth Roofing & Building Ltd, registered in England and Wales, company number 15471719, which you can look up in a minute. Thomas Hannen's business, and he is the one who comes out to price the job, not a salesman. A verified customer's 10 out of 10 on Checkatrade. The visit and the written quote are both free.
Questions
Cranborne questions we get asked
How long does it take and how much mess is there?
Half a day to a day for most lofts. The mess is manageable because the work stays in the roof: we lay boards to walk on, bag the old material up there rather than carry it loose through the house, and sweep as we go. Everything that comes out leaves with us the same day.
The felt drips in the mornings. Will more insulation cure that?
On its own it will make it worse. Droplets on the underside of the felt mean warm damp air is getting into a roof that cannot clear it. We open the eaves, fit vent trays where the roll has been pushed in, look at whether the hatch and the light fittings are leaking air, and only then talk about depth.
Our cottage is listed. Can you still insulate the roof?
Usually yes, and it is one of the least intrusive things you can do to an old building. Where care is needed is anything that touches historic fabric, such as work at rafter level, lifting old boarding or altering a ceiling. Listed building consent covers the inside as well as the outside, so we check before quoting rather than after.
Is loose fill better than rolls in an old roof?
It has its place. In a cut roof with irregular bays, or in the tight triangles at a hip, loose fill gets into spaces a roll cannot fill without gaps. For the main run, rolls cross laid over the joists are easier to lay evenly and easier to check afterwards. Most old lofts here end up with both.
Nearby, and next door
Loft insulation near Cranborne
Loft insulation nearby
Our other trades in Cranborne
Everything we do in Verwood Loft insulation, all areas Every area we cover
Free quote
Heating with oil and losing it through the ceiling?
We will measure what is in the loft, check the eaves and the hatch, and send you an itemised written price. Nothing to pay for the visit.
