Patios in Cranborne, paving that suits the village

A back garden terrace is usually straightforward here, but a frontage, a boundary wall or paving against a listed cottage is a different conversation and worth having first.

The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.

Last updated

In Cranborne's conservation area the patio behind the house is rarely the problem. What gets looked at is anything visible from the street and anything attached to an old building: a front path, a boundary wall taken down to widen an opening, or paving run up against the plinth of a listed cottage.

Patio work in Cranborne covers worn front paths and doorsteps to relay in something that suits the house, back terraces that have sunk and sit wet against an old wall, and new sitting areas in gardens with mature trees.

We look at the Cranborne address before the slabs, because that changes what we quote. Then the usual survey: levels off the building, a slab lifted to see the bed, and a written price with the dig, the sub base, the falls, the edgings, the paving and the jointing on their own lines. The site visit and the itemised quote are free.

The work in the village

Paving that suits an old building, and a base that lasts

Porcelain patio slabs laid to a fall with a gravel border alongside (one of our own jobs, shown for patios in Cranborne)
Laid to a fallWater goes away from the house, not along the wall. Photo from one of our own jobs.

Choosing a material that belongs. Riven sandstone, a limestone flag or a reclaimed style paver reads better against old brick and flint than a large format grey porcelain does. On a Cranborne frontage seen from the street that matters. Behind the house you can please yourself.

Porcelain where it works. Calibrated to a single thickness, almost no absorption, slip rated finishes, and it stays clean under trees. In a walled Cranborne back garden it is often the sensible choice. It needs a slurry primer on the back of each slab or the mortar bed will not hold it.

Granite, limestone and travertine. Granite setts make a good threshold band and a hard wearing step tread. Limestone gives a flat even surface. Travertine is softer and marks. None is calibrated like porcelain, so each slab is bedded to its own thickness.

The dig. Old concrete, a cobbled yard, brick rubble and roots all come out. Around older Cranborne buildings we excavate by hand close to the walls rather than run machinery along a footing nobody has seen. Spoil leaves in a grab lorry or a skip.

The sub base. MOT type 1 compacted in layers, or a lighter hardcore build up where the area is small and the loading is only foot traffic. Where the ground is soft a geotextile keeps the subgrade out of the stone.

Full bed, never dabs. Every flag beds on a full wet mortar bed, not on five dabs and not on a sand screed. It is the difference between a surface that stays flat and one that starts rocking within two winters.

Levels against an old wall. The paving falls away from the building and finishes low against it. On a house with a damp proof course we work two courses below it. On an older wall without one we drop the surface and put a drainage channel or a gravel margin along the base instead.

Where the water goes. An ACO channel to a gully, a permeable jointed build up over a stone reservoir, or a soakaway at the low end of the garden. Runoff off a new surface has to be dealt with on your own ground.

Edges, steps and retaining. Haunched edging or a kerb to hold the outer course, a retaining edge with a coping where a bank or a border sits above the paving, and steps with an overhang on the tread so water drips clear.

Jointing and repairs. Resin grout brushed in while the joints are damp on calibrated paving, or lime rich pointing where the work sits against old fabric. We also relay sunk and lifted flags, cut out cracked ones, and deal with staining, efflorescence and a slippery green surface under trees.

How it runs

Building a patio when every slab goes through the side gate

A finished porcelain patio in the wet, showing how the surface drains and where the joints sit (one of our own jobs, shown for patios in Cranborne)
Judged in the wetRain shows the falls and the joints that a dry day hides. Photo from one of our own jobs.

Thomas stands in your Cranborne garden, takes levels off the damp proof course, looks at how the ground drains, and prices the patio himself. Thomas prices it and is the one you deal with while it is dug, laid and pointed.

Your quote breaks out excavation and muck away, sub base, falls and drainage, edgings and steps, the paving, and the jointing.

Behind many Cranborne cottages the only route to the garden is a side passage, or straight through the house. Then everything goes in and out by barrow, and the quote allows for it. Where the garden backs onto a track or a yard, materials can sometimes come that way. If we must come through indoors, the floors are sheeted. The garden is tidied each evening and spoil is taken away. Dig into old concrete, a buried wall or a forgotten drain, and Thomas shows you a photo and a figure before we deal with it.

A ground level patio in a back garden is usually permitted development. Taking down a boundary wall, changing a frontage, or hard landscaping round a listed building is not, and can need listed building consent from Dorset Council. If the house turns out to be in a conservation area, its trees are protected, which matters when roots are in the way. Building control only comes in if drainage or levels by the house change.

Cost

What a patio costs rests on the dig and the levels

The stone you pick is the part people talk about, and it is the smallest share of the cost. Carrying. A Cranborne cottage with no side access, a farmhouse whose yard a lorry can reverse into, and a newer house with a wide gate cost very differently for the same paved area.

When every flag and every bag of sharp sand travels by barrow down a passage, the hours climb. The work at height rules still apply to raised edges, steps and machines.

What comes out first. The sub base can only go in once the ground is clear. Old concrete paths, a brick raised bed, tree roots and builders' rubble buried years ago all come out and go away by the load. Most of the gap between patio quotes is here.

Levels. A patio has to slope away from the house and sit at least two courses under the damp proof course. On a sloping plot that can mean steps, a retaining edge or a channel drain. Laying against the wall too high is the costliest mistake there is.

The stone. Natural flags vary in thickness and need a full mortar bed. Porcelain is thinner and wants a primer slurry on the back.

Before you choose, find out from any rival whether the flags sit on a full wet bed or on dabs, which jointing compound fills the gaps, and if the edgings and steps are in.

If it has become a hazard

A slab rocking underfoot or a step that has dropped

A flag lifting at one corner or a step that has sunk will catch someone's foot, and a shady patio grows slippery green algae through the winter. Put a pot on it or tape it off until it is fixed.

A loose flag or a worn step at a Cranborne front door on the street deserves a quicker call, because neighbours and delivery drivers use it too. We relay the worst flags or scrub and treat a slippery surface on the first visit, and check whether the base beneath has failed before pricing more. Patio jobs run Monday to Friday, 8am to 6pm. For a real hazard, a phone call is better than the form, and a missed call gets returned as soon as one of us is free.

Call now: 07435 839745

The one local thing

Working inside the conservation area

The village sits in its own conservation area, inside the wider Cranborne Chase landscape, with twenty five listed entries around it. None of that stops you building a patio. It does affect the frontage, the boundary and the trees, and those are worth knowing about before you plan anything.

At the frontage, appearance is controlled where work can be seen, so relaying a front path in the same materials is maintenance, while changing its colour or pattern is a question for the council. On the boundary, taking down part of a wall to widen an opening is not automatically something you can just do. Trees are protected inside a conservation area, so a root in the way of a terrace means a notice rather than a chainsaw.

That shifts the timetable rather than the build. We look the address up, put photographs and a note of the materials in with the quote where consent is likely, and start the paperwork before the dig is booked.

Who you are dealing with

The firm that quotes your patio, and where we are

We work 13.9 miles from our base in Boscombe when we lay a patio in Cranborne, and we also cover Alderholt, Sixpenny Handley and the lanes across the Chase in BH21, under Dorset Council. The firm is Bournemouth Roofing & Building Ltd, registered in England and Wales as company 15471719. Before you book a visit in Cranborne, you can read our customers' Google reviews, word for word, on our reviews page.

Thomas Hannen runs it, and Thomas himself comes to look at your garden, check the levels and price the patio. A verified customer on Checkatrade rated our work 10 out of 10. The survey visit is free of charge, as is your written quote with every part shown. A front path or a driveway in Cranborne is visible from the street, so it gets looked at more closely than the back terrace.

Planning at a glance

Do you need planning permission in Cranborne?

Most repairs in Cranborne need no application at all. What decides whether a change to the outside of your house does is who the council is, whether a conservation area or a listing applies, and whether the place sits in a protected landscape.

The planning position in Cranborne, from council and national records.
Question In Cranborne
Who decides Dorset Council is the planning authority for Cranborne. Dorset Council's heritage pages set out what it controls.
Conservation area Yes: Cranborne Conservation Area. Check whether your street is inside the boundary before changing anything visible.
Listed buildings Yes, there are listed buildings in and around Cranborne. If yours is one, work can need listed building consent.
Protected landscape Inside the Cranborne Chase & West Wiltshire Downs National Landscape (formerly AONB), so anything visible from outside gets more attention.

Questions

Questions about patios in Cranborne

Does the conservation area stop me having the patio I want?

Consent is almost never needed for a Cranborne back garden. Appearance is controlled where work is visible, so a rear terrace out of public view is normally permitted development. A front path, a boundary wall or anything attached to a listed building is where consent comes in.

What paving suits an old brick and flint cottage?

Riven sandstone or a limestone flag in a smaller size, hand pointed with a slightly wider joint, sits better than a large format porcelain. A granite sett border ties it to the building. We lay samples against the wall first.

There is a tree root under where I want the terrace. Can you cut it?

Not without checking: trees in a conservation area are protected and the council has to be given notice before work. Where the root has to stay we can bridge over it, move the terrace, or build the sub base around it rather than through it.

My old cottage has no damp proof course. Where does the paving go?

Lower than you would think, and not tight to the wall. Without a damp course there is nothing to sit below, so the aim is to keep water off the base of the wall entirely: the surface falls away and a gravel margin or a channel runs along the foot of it.

Will you lay paving in winter?

We work all year, but mortar and jointing compound will not go down in a frost or into standing water. In a cold spell we bring the dig and the sub base forward and hold the laying, instead of putting a bed down that will never cure properly.

Free quote

Find out what needs consent before you choose the paving

Thomas comes out, looks the address up, takes levels off the building and prices the dig, the base, the falls, the edges and the jointing in writing. The visit and the quote are free.