Loft insulation in Wool

Clearing, topping up and laying to full depth in Wool roof spaces, with a proper look at what is already living up there.

The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.

Loft insulation

The short version

Mineral wool insulation laid between and over the ceiling joists in a loft
Two layers, crossedThe second layer runs across the joists so the timber stops being a cold bridge.

Nothing goes down in an older roof here until somebody has looked for what is living in it. Bats and nesting birds use these lofts, they are protected whether or not one is at home on the day, and finding either turns a morning of work into a conversation.

The calls divide fairly neatly. Bedrooms that lose their warmth within the hour of the heating going off. A loft cleared out for the first time in years, where the layer turns out to be flat, uneven and stopping a foot short of every wall. Or a wet roof, with the felt running and the rafters going dark.

None of the three is answerable from the doorstep.

So we come out, get through the hatch and read the roof. What is up there, the depth once a rule has gone into it, the run and the centres of the joists, whether the wall plate is still clear, and what has been stacked on top. It gets photographed. The site visit costs nothing and the written quote is itemised line by line. If the ceiling is already sound you will be told where your heat is actually going instead.

The work

Look first, open the edges, then lay it

Rigid insulation board fitted between the rafters in a loft
Board where depth is shortRigid board earns its place where the headroom will not take quilt.

The first job is to look rather than to lay. Droppings along the joists, staining under a gap at the ridge, feathers worked into the eaves: any of those and the wool stays in the van until you have had proper advice. Where the roof is clear, out comes whatever is finished. Material that has been wet under a slipped tile, or is contaminated, gets bagged where it sits and leaves with us. A layer that is only compressed and patchy is worth keeping, so it is teased back open, straightened and its gaps closed rather than binned.

Then the edges, before any depth arrives. The new layer runs right out to the wall plate and stops, and a vent tray goes up in each rafter bay to hold an air gap above it. That is what keeps ventilation crossing the roof soffit to soffit and the felt dry. Boxed soffits make it harder, and where the eaves genuinely cannot be opened, a ridge vent or a few vent tiles take the work on. Approved Document F sits behind all of it, and getting it wrong is how you buy condensation, damp material and black mould instead of a warm bedroom.

Then the depth, in two goes. The first run of mineral wool sits between the joists, friction fitted so nothing is missing down the sides. The second is turned square and laid across the joists, which is the run that covers the timber and stops a ceiling losing heat in lines. Around 270mm together is the u value a renovated ceiling is expected to make, and Approved Document L is where that comes from. It is also the run that most of the old jobs here never had. Glass wool roll for the clear stretches, rockwool batts for a cut roof with bays of every width, loose fill for the corners, sheep wool if you ask.

Everything that lives up there gets dealt with on the same visit. Recessed lights take a rated cover apiece. Cables are lifted and clipped to the timber rather than left buried, because buried wiring runs warm. A cold water tank and its pipework have just been put outside the warm envelope of the house, so a jacket and lagging go on and nothing is laid underneath the tank.

Last, the loft you still have to use. Boards screwed straight onto the joists press the wool flat and waste what you have paid for, so a raised floor goes up on loft legs over full depth and only the platform you actually walk on is boarded. The hatch is insulated on its back and draught sealed, and the loft ladder reset if the new floor fouls it. Where the roof is already a room, with a dormer and sloping ceilings, the whole thing moves up to rafter level: rigid PIR board cut between the rafters with a clear gap under the underlay, another layer beneath it, joints taped, and a warm roof built to keep interstitial condensation away from the timbers. Multi-foil quilt goes where nothing thicker will fit.

How it runs

From your call to a written price

A loft insulated at rafter level with the gable filled and a rooflight fitted
At rafter levelA room in the roof is a different job from a cold loft floor.

Same team from first visit to last, one person to ring, and no sub-contracting your work out to somebody you have never met. The quote is itemised, not a figure on the back of a card: the survey, clearing and bagging whatever is up there now, the material and its depth, keeping the eaves clear, the hatch and any pipework, and disposal on separate lines, so you can compare it properly against anyone else's.

Nothing is left open or unusable overnight. The site is swept at the end of each day rather than the end of the job, and what comes out leaves with us. If something turns up once we start that nobody could have seen, you get a photograph and a price before we carry on.

Insulating inside a roof is not development, so nothing is applied for and no permitted development right is used, which Planning Portal guidance on insulation sets out. Building control applies where regulation 23 does, when more than half of an element is renovated and the whole of it has to reach current standard. Wool has its own conservation area and there are listed entries around the village, so listed building consent is the place to start if yours is one, since consent covers internal work as well. The VAT rules for energy saving materials are worth reading before you order.

Cost

What decides the price of a loft

Plasterboard taped and jointed on a lined loft wall
Lined, then tapedWhere the loft becomes a room, the boarding and the joints come next.

No rate per square metre, because the floor area is the easy part and the awkward edges are where the time goes.

Getting to it. A village terrace with the trap over the stairs, a 1970s semi with a landing hatch, and a bungalow with a long shallow roof and a crawl at the eaves are three different jobs. A hatch on a landing you can stand a ladder under is one job. A hatch over a stairwell, a crawl space you can only move through on your knees, or a loft full of boarding that has to come up and go back, is time before any material is laid.

What is up there now, and what it is sitting on. Old material that has to come out, be bagged and taken away is a cost before anything new goes down, and so is a loft full of boxes that has to be emptied and put back. Joists at 400 centres with a flat run across them is a different afternoon from a trussed roof full of bracing.

Ventilation, and the edges nobody reaches. Insulation stops at the wall plate and the eaves have to stay clear, or you trade a warm bedroom for a wet roof. Getting depth right into the corners and around the hatch, boxing over downlighters and lagging anything that now sits in the cold, is most of the labour. Approved Document L sets what the work is expected to reach.

Comparing quotes? Ask what depth is actually being laid and in how many layers, whether the old material is coming out or being covered over, whether the eaves are being kept clear, what happens to anything you store up there, and whether the hatch and the pipework are included. Two quotes for the same job are usually two different jobs.

If the loft is wet

Water running off the felt, or mould on the underside

Ring rather than use the form. Droplets on the underside of the felt, black mould spreading across the roof timbers, or insulation that is visibly damp are all telling you the same thing: warm wet air is getting into a space that cannot breathe. That does not wait, because it is the timbers that pay for it. We look before anything is added, because putting more insulation into a loft that cannot ventilate makes it worse. Wool is a run out along the Purbeck road for us, but a roof space that has gone wet is not left waiting. The phone is answered 24 hours for emergencies; scheduled work runs Monday to Friday, 8am to 6pm.

Call now: 07435 839745

Worth knowing

Check the roof for tenants before you fill it

Wool sits on the edge of the heath and the water meadows, and that shows up in the roofs. Bats roost in lofts here, particularly in the older buildings with gaps at the verge and around the ridge, and swifts, swallows and house sparrows use the eaves. All British bats and their roosts are protected in law, whether or not a bat is there on the day, and it is an offence to damage a roost or disturb one. Active birds nests are protected too while they are in use.

What this means in practice is simple enough. We look for the signs before anything is laid: droppings on the joists or on the floor below the hatch, staining at a gap in the ridge, feathers and nest material in the eaves. If there is nothing, the job goes ahead as normal. If there is, we stop and you take proper advice before insulation goes down over the top of it, because rolling wool across a roost is both illegal and a very expensive thing to have to undo. It usually delays a job rather than stopping it, and out of the nesting season the answer is often to work round it. Anyone who quotes an old Wool roof without going up has not looked for any of this.

Who you are dealing with

A local firm you can check

We cover Wool, Bovington, East Burton, Coombe Keynes and the BH20 addresses across West Purbeck, with Dorset Council for planning and building control. You are dealing with Bournemouth Roofing & Building, the trading name of Bournemouth Roofing & Building Ltd, registered in England and Wales, company number 15471719, which you can look up in a minute. Thomas Hannen's business, and he is the one who comes out to price the job, not a salesman. A verified customer's 10 out of 10 on Checkatrade. The visit and the written quote are both free.

Questions

Wool questions we get asked

How long does it take?

Half a day to a day for most houses here. Clearing is what stretches it: bagging old material, emptying a loft that has been the family store, and lifting boarding that has to go back afterwards. Each of those is a separate line on the quote.

What happens if you find bats in the roof?

We stop and tell you. Roosts are protected whether or not there is a bat there when we look, so insulation does not go down over one. In most cases it is a delay and a bit of advice rather than the end of the job, and there is usually a way of working round the roost once somebody qualified has looked at it.

Is topping up worth it, or should the old stuff come out?

If it is dry and clean, top up. We straighten what is there, close the gaps and cross lay new roll over the joists. Clearing out is for material that is damp, contaminated with droppings or compressed into a mat that no longer holds any air at all.

Our loft sweats every winter. Will insulating stop it?

Not on its own. Water on the underside of the felt is warm damp air meeting a cold surface in a space that cannot clear it, so we deal with the eaves, the vent trays and any air leaking up through the hatch and the light fittings first. Adding depth to a roof that cannot breathe makes the damp worse.

Free quote

Want your loft looked at before winter?

We will go up, measure what is there, check the eaves and the ridge and put an itemised written price in front of you. Nothing to pay for the visit.