Loft insulation in Bere Regis
Loft top-ups, boarded storage and rafter level work on older village roofs around Bere Regis and BH20, measured on a free visit and priced in writing.
The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.
Most lofts in Bere Regis have some insulation in them and almost none have enough. What decides whether the job is worth doing is not the middle of the floor but the edges, the hatch and whether the roof can still ventilate once the depth goes up.
The calls come from a few places. A cold upstairs in a house that has plenty of heating. A grey, flattened layer somebody laid decades ago that clearly stops short of the walls. Or damp showing on the roof timbers, which is a ventilation problem before it is an insulation one.
So we look first and quote afterwards. The visit costs nothing, and it means getting into the loft, pushing a rule down through the material in several places rather than judging by eye, and following the roof out to the wall plate at each side. You get photographs of what is up there and a written itemised quote, with the clearing, the material, the edges, the hatch and the pipework on their own lines.
The work
Old roofs, thin layers and the edges nobody has reached

Reading what is already there. Depth first, condition second. Wool that has settled or been compressed to half its thickness insulates to half its value, and a layer that looks even from the hatch is usually patchy, or missing altogether, once you are out at the far corner. Anything wet or contaminated gets bagged and taken away, and loose fill that has drifted into the eaves comes out of them whatever else happens.
Depth, in two layers. Sound material is straightened and left between the joists. The new roll goes over the top of it at right angles, so the joists are covered rather than left standing proud as a line of cold bridges through the ceiling. Two layers laid across each other get you to roughly 270mm, and a finished loft should look like a flat field with no timber showing. Glass wool or rockwool roll suits an open floor, batts are easier where a run is broken up by bracing or a chimney breast, and sheep wool is there if you want it. The gain is in the U value of the ceiling, and most of the heat loss you can still do something about is going straight up through it.
Older roofs, and what you can stand on. Plenty of the houses here have a traditional cut roof with purlins, which is a good deal easier to move about in than a modern trussed loft, but the ceiling below is often lath and plaster and will not take a foot. Nothing is laid off the ceiling. We work from boards and keep to the joists. Where there is already a room in the roof, a dormer or a sloping ceiling, the work moves up to the rafters instead: rigid board such as Celotex cut tight between them with the air gap left open above, a layer of PIR beneath, taped through so the vapour control is continuous. That is a warm roof build up, and it is priced as its own job.
Moisture is the part to get right. Insulating a loft makes it colder, which pushes the dew point onto the underside of the roof. If house air can get up there, you see droplets on the felt and black mould along the timbers within a winter. So the hatch is sealed, gaps around pipes and cables are closed, the eaves are kept clear with trays, and cross ventilation is checked from one side to the other. An older roof with no underlay ventilates itself well; a sealed modern one relies on the eaves you are about to lay up to. BS 5250 on managing moisture in buildings is the code of practice behind all of that.
The rest of it. Recessed lights are boxed with fire rated covers, cable is lifted clear rather than buried, and the tank and its pipework are lagged and jacketed once they sit on the cold side. Where the loft is used for storage, boarding goes onto loft legs above full depth instead of flat on the joists, with a platform at the top of the loft ladder.
How it runs
From your call to a written price

Same team from first visit to last, one person to ring, and no sub-contracting your work out to somebody you have never met. The quote is itemised, not a figure on the back of a card: the survey, clearing and bagging whatever is up there now, the material and its depth, keeping the eaves clear, the hatch and any pipework, and disposal on separate lines, so you can compare it properly against anyone else's.
Nothing is left open or unusable overnight. The site is swept at the end of each day rather than the end of the job, and what comes out leaves with us. If something turns up once we start that nobody could have seen, you get a photograph and a price before we carry on.
Adding insulation to an existing roof space is not development, so there is no planning application, and Planning Portal guidance on insulation puts that plainly. Building control is the live question: renovate a thermal element rather than top it up and regulation 23 expects the whole element brought up to standard, which Approved Document L defines. There are 43 listed entries in and around the village, and on a listed building even work inside the roof can need listed building consent from Dorset Council, so ring us before anything is ordered. As an energy saving material the VAT treatment follows HMRC VAT Notice 708/6.
Cost
What decides the price of a loft

No rate per square metre, because the floor area is the easy part and the awkward edges are where the time goes.
Getting to it. A village cottage with a small trap in a bedroom ceiling, a bungalow with a proper landing hatch and a ladder, and a barn conversion where the roof space is reached through a cupboard are three quite different half days before any material is laid. A hatch on a landing you can stand a ladder under is one job. A hatch over a stairwell, a crawl space you can only move through on your knees, or a loft full of boarding that has to come up and go back, is time before any material is laid.
What is up there now, and what it is sitting on. Old material that has to come out, be bagged and taken away is a cost before anything new goes down, and so is a loft full of boxes that has to be emptied and put back. Joists at 400 centres with a flat run across them is a different afternoon from a trussed roof full of bracing.
Ventilation, and the edges nobody reaches. Insulation stops at the wall plate and the eaves have to stay clear, or you trade a warm bedroom for a wet roof. Getting depth right into the corners and around the hatch, boxing over downlighters and lagging anything that now sits in the cold, is most of the labour. Approved Document L sets what the work is expected to reach.
Comparing quotes? Ask what depth is actually being laid and in how many layers, whether the old material is coming out or being covered over, whether the eaves are being kept clear, what happens to anything you store up there, and whether the hatch and the pipework are included. Two quotes for the same job are usually two different jobs.
If the loft is wet
Water running off the felt, or mould on the underside

Ring rather than use the form. Droplets on the underside of the felt, black mould spreading across the roof timbers, or insulation that is visibly damp are all telling you the same thing: warm wet air is getting into a space that cannot breathe. That does not wait, because it is the timbers that pay for it. We look before anything is added, because putting more insulation into a loft that cannot ventilate makes it worse. Bere Regis is a run west for us rather than round the corner, so a wet loft there gets booked as a first call of the day instead of squeezed onto the end of one. The phone is answered 24 hours for emergencies; scheduled work runs Monday to Friday, 8am to 6pm.
Worth knowing
Insulating the loft and converting it are two different questions here
The village drains into the Poole Harbour catchment, which is protected, and that has one practical consequence worth knowing before you plan anything. Nutrient rules bite on schemes that add overnight accommodation, so turning your loft into a bedroom can pull you into them. Insulating the loft you already have does not: nobody is sleeping up there, no extra foul drainage is created, and there is nothing to apply for.
It matters because the two get talked about as if they were one job. If the loft stays a loft, the material goes over the ceiling, the eaves stay open and the roof space stays cold. If it becomes a room, the insulation moves up to the rafters, the space becomes warm, and the ventilation, the vapour control and the structure all change with it. That is a different design and a different set of consents. We will price either, and if you are undecided we will say which parts of the work would be wasted by converting in a couple of years.
Who you are dealing with
A local firm you can check
We cover Bere Regis, Winterborne Kingston, Wool, Bovington and the BH20 addresses around them, with Dorset Council for planning and building control. You are dealing with Bournemouth Roofing & Building, the trading name of Bournemouth Roofing & Building Ltd, registered in England and Wales, company number 15471719, which you can look up in a minute. Thomas Hannen's business, and he is the one who comes out to price the job, not a salesman. A verified customer's 10 out of 10 on Checkatrade. The visit and the written quote are both free.
Questions
Bere Regis questions we get asked
How do we know whether ours needs topping up?
Measure it rather than look at it. Push a rule down through the wool at the hatch, halfway out, and again at the edge. Most older village lofts read well under half of what is expected now, and the edge is usually the worst of the three. If yours is deep, dry and carried out over the wall plate, we will tell you to leave it alone.
Our ceilings are lath and plaster. Is that a problem?
It changes how we work, not whether we can. Lath and plaster will not carry weight, so nothing is stood on the ceiling or dragged across it. We move on boards spanning the joists and work outwards from those. It is slower than an open modern loft, and that shows on the quote as labour rather than as a surprise on the day.
Will more insulation make the loft damp?
It can, if the ventilation is ignored. A better insulated ceiling means a colder roof space, and a colder roof space is quicker to reach dew point. That is why the eaves are kept open with trays, the hatch is draught sealed and any gap letting warm air up from the house is closed. Where we find condensation already running off the felt, we sort the ventilation before adding anything.
Will we notice it on the heating bill?
You notice it in the rooms first. A ceiling at full depth cuts the thermal loss upward, and upstairs stops feeling cold at head height, which is usually what people ring about. It is also recorded on an EPC, since an assessor measures the depth in the loft. Sealing the hatch and the gaps around pipes deals with the draught, which is the other half of the same problem.
Is the house being listed going to stop us?
Usually not, for a straightforward top-up. Material laid over the ceiling of a roof space changes nothing anyone can see. Consent comes in once you alter the fabric, line the rafters out, cut in a rooflight or form a room, and Dorset Council decides that. We will say at the visit which side of the line your job sits on.
Nearby, and next door
Loft insulation near Bere Regis
Loft insulation nearby
Our other trades in Bere Regis
Everything we do in Wareham Loft insulation, all areas Every area we cover
Free quote
Not sure whether yours is worth topping up?
We will come out, measure the depth in the middle and at the edges, check the eaves and the ventilation, and put a written itemised price in front of you. Both the visit and the quote are free.