Flat roofing in Wool

Flat roof repairs, re-covers and warm roof rebuilds across Wool, in EPDM rubber, GRP fibreglass and torch on felt. We look under the covering before we price it.

The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.

The housing here nearly all went up inside the same twenty years, and so did its flat roofs. They are wearing out together, and most of them are failing round the edges rather than across the covering, which is a far smaller job than people expect when they ring.

What we work on is attached and detached garages, a kitchen or dining room built across the back, a porch canopy, and a scattering of flat topped dormers. The coverings are three layer built up felt finished in a mineral cap sheet, torch on felt laid over the top of that at some point, and GRP fibreglass on the more recent work.

The call comes when a ceiling under the back extension has gone brown and the mark keeps creeping, when the felt on a garage has cracked and lifted at one end, or when water has stood on a roof for a fortnight. We strip a bay before quoting, because the boards decide everything that follows.

How far it goes

Three sizes of job, and how we tell which one you have

A felt flat roof on an extension, with the parapet coping being bedded on top
It fails at the edgeUpstands, copings and the lead. Almost nothing fails in the middle.

A repair. One thing has failed and the rest of the roof is sound: a split at an upstand, a blister standing off the boards, a trim worked loose, a lap opened at a corner, an outlet packed with grit. Felt is cut back, primed and welded in under a fresh cap sheet. GRP fibreglass is ground out at the crack and laminated again. EPDM rubber is cleaned and bonded down. Hours rather than days, and worth having while the rest of the surface still bends. The only test that matters is whether the deck under the fault is dry.

The edges, without the middle. Most people do not know this one exists, and on roofs of this age it is often the right answer. The field of the covering is still sound but everything around it has gone: the edge trim and its drip, the apron at the front, the upstand where the flat meets the house, the coping on a parapet and the cavity tray behind it, the kerb round a rooflight. We renew that perimeter, weld or bond the covering back into it, and leave a surface that still has years in it doing the job it is doing.

The full job, down to the joists. Where the deck has gone there is no shortcut. Chipboard decking that has been wet loses its strength and sags between the joists, so it comes off and new boards go down. Plywood or OSB that has stayed dry takes a covering without argument. The falls are then rebuilt so the roof drains at an outlet, to the fall BS 6229 sets out, because standing water forces itself into every lap and seam and a frost then splits them apart. Roofs of this vintage are cold roofs, insulation between the joists with a dead void above it, which is where condensation gathers and interstitial damp rots the deck without a mark showing on top. Built back warm, the PIR goes on top of the deck and the vapour control layer underneath, and no cold void is left at all. The covering goes on last: EPDM rubber in one sheet, GRP fibreglass, a new three layer torch on system, or single ply hot air welded on a long straight roof.

The things that come up through it. A rooflight, a lantern, a Velux, an access hatch or a soil and vent pipe each want their own kerb and collar rather than a bead of sealant. Where the flat runs into brickwork a lead cover flashing is chased in, cut so it can move without tearing. Then the gutter, the hopper and the downpipe below are cleared and run through, because a full outlet and a finished covering look identical from indoors.

How it runs

From your call to a written price

A stripped roof with the membrane and battens going back over the deck
What is under itThe deck decides the price, and a soft board cannot be covered over.

Same team from first visit to last, one person to ring, and no sub-contracting your work out to somebody you have never met. The quote is itemised, not a figure on the back of a card: access, stripping the old covering, any new deck or firrings, the insulation, the membrane and each upstand, outlet and edge trim, and disposal on separate lines, so you can compare it properly against anyone else's.

Nothing is left open or unusable overnight. The site is swept at the end of each day rather than the end of the job, and what comes out leaves with us. If something turns up once we start that nobody could have seen, you get a photograph and a price before we carry on.

A like for like re-cover is maintenance, so no planning permission is needed, and Planning Portal guidance on roofs covers where the limit sits. Change the shape of the roof or cut a dormer into it and permitted development stops applying. Building control still comes into it. Renew over a quarter of a roof and it is a controlled thermal element, so the insulation is upgraded to Approved Document L and the job is registered with Dorset Council through a building notice or an application with full plans.

Cost

What decides the price of a flat roof

A finished grey flat roof with three rooflights set into it
Falls, then coveringThe water needs somewhere to go before a roll comes off the van.

No rate per square metre, because the square metres are the easy part and what is under the covering is what decides the job.

Getting to it. A detached garage on a village plot, a kitchen extension against the back of the house, and a flat topped dormer above a bedroom are three different jobs before anything is stripped. A garage or a single storey extension will often come off a tower, anything above a two storey wall wants a scaffold, and the platform has to stand while the deck is open rather than for an afternoon. The work at height rules are why it is a priced line rather than something folded into a rate.

The deck under the covering. A sound deck can be re-covered. Chipboard that has been wet for years, or ply that gives underfoot, has to come off and be replaced, and you cannot tell which you have from the ground or from a photograph. We lift a corner before quoting, because the deck is the single biggest swing in the price.

The falls, and where the water is meant to go. Most flat roofs that fail were never laid to a fall, or the fall runs at an outlet that has since been blocked or built over. Correcting it with firrings is more work than laying a membrane and it is the difference between a roof that lasts and one that ponds. Upstands, edge trims and each outlet are priced one at a time, because that is where the hours and the leaks both are.

Comparing quotes? Ask which system is being quoted and how many layers, whether the deck is being renewed or covered over, whether the falls are being corrected with firrings, how the upstands, outlets and edge trims are detailed, and whether the scaffold and the skip are in the price. Two quotes for the same job are usually two different jobs.

If it is coming through

Water through a flat roof

Ring rather than use the form. A flat roof that has split, blistered or lifted at an upstand puts water straight onto a ceiling, and once the deck is wet the damage carries on after the rain stops. The first visit is about getting it covered and dry, and we price the permanent job once we can see how much of the deck has gone. Anything running into a room gets covered and made dry on the first visit and priced once the deck is open, and an emergency call before a wet spell is worth making. The phone is answered 24 hours for emergencies; scheduled work runs Monday to Friday, 8am to 6pm.

Call now: 07435 839745

Worth knowing

Your neighbours' roofs are the same age as yours, and it shows

Better than half the housing here went up between the war and the early eighties, most of it in the seventies. The flat roofs went on within a few years of one another and they are reaching the end on the same timetable. It is why one street can have four garages leaking in the same winter, and why the fault is nearly always the same fault: trims, upstands and outlets rather than the covering itself.

That is worth knowing for two reasons. It usually means a smaller job than you feared, because renewing a perimeter is not the same thing as re-covering a roof. And it means a neighbour's quote is a fair guide to your own, which very rarely happens in this trade. Where several roofs on one street need doing we would rather look at them on the same day and price them together, since the access and the waste are the parts that share. The older core of the village is a conservation area, so on a roof that shows from a road it is worth checking with Dorset Council before you change a colour or a material.

Who you are dealing with

A local firm you can check

We cover Wool, East Burton, Bovington, Winfrith and the villages across west Purbeck, along with the rest of BH20, and the site visit and quote are both free. You are dealing with Bournemouth Roofing & Building, the trading name of Bournemouth Roofing & Building Ltd, registered in England and Wales, company number 15471719, which you can look up in a minute. Thomas Hannen's business, and he is the one who comes out to price the job, not a salesman. A verified customer's 10 out of 10 on Checkatrade. The visit and the written quote are both free.

Questions

Wool questions we get asked

My neighbour is having theirs done. Does doing both together help?

It usually does, because the access, the setting up and the waste are the parts that share and they only get paid for once. Each roof still gets its own survey and its own itemised quote, so nobody is subsidising anybody, and you can each decide on your own.

Is renewing only the perimeter a real option?

On a roof of this age it often is. Where the field of the covering is still flexible and the deck under it is dry, the trims, the upstand, the apron and the outlet can be renewed and the covering welded or bonded back into the new work. We only offer it where we would be happy with it ourselves.

There is a hollow forming in the middle of the roof. What causes that?

A wet deck, almost always. Chipboard swells the first time it takes water and then sags between the joists, and once there is a hollow the water sits in it and the whole thing speeds up. A new covering laid over that would follow the same dip inside a year, so the boards come off first.

What happens to the old covering and the wet boards?

They leave with us. Old felt, soft decking and any spoiled insulation go the same day rather than sitting on the drive, the ground is swept at the end of each day rather than the end of the job, and nothing is left open overnight whatever the weather is doing.

Free quote

Get a written price for your Wool flat roof

Free site visit, free itemised written quote, and an honest answer on whether the deck has to come off at all.