Flat roofing in Three Legged Cross
Garage roofs, garden rooms, utility roofs and extension roofs across Three Legged Cross and BH21. We check the deck and the falls, then price it in writing.
The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.
Last updated
Re-covering a flat roof you already have is repair, and you can get on with it. Building a new flat roofed room is a different conversation with the council. Knowing which of the two you want settles who you need to talk to first.
The flat roofs in Three Legged Cross are garages, porches, utility roofs, garden offices and the odd wide extension. A good share of the housing is newer than you would expect for a village, so plenty of these roofs are on their first covering rather than their third.
What we do is the same either way. Get on the roof, work out where water is genuinely getting in rather than where the ceiling has stained, and open a corner of the covering where there is a sensible place to open one. You get photographs of the deck and the detailing, and a written price with the elements set out line by line so you can compare it against anyone else's. If your problem is water coming through a ceiling right now, ring 07435 839745 and leave the extension talk for later.
The work
Garages, garden rooms and the roof over the back door

What fails first. On felt it is the creases and the junctions. A three layer built up system with a mineral cap sheet lasts well until the surface goes brittle, then it splits where it has been folded.
On a Three Legged Cross roof, a single torch on layer laid over an older covering blisters, because the damp underneath had nowhere to go. And a lifted or failed seam at an upstand lets water run under the whole roof rather than through one hole, which is why the stain is never where the fault is.
What we lay. EPDM rubber on a plain rectangle, bonded down in a single sheet with no lap or seam in the open field. GRP fibreglass where the roof has kerbs, corners and upstands, because it is laminated in place and the detail becomes part of the same skin. Single ply, hot air welded, on a long run.
Deck, joists and falls. Plywood, OSB or chipboard decking sits on joists, and the firrings on top are what create the fall to the outlet. Wet chipboard swells, gives underfoot and comes off. A roof laid flat holds standing water, and ponding in the same place every winter will shorten a new covering exactly as it shortened the old one. BS 6229 sets out the falls and the drainage, and where re-firring is not practical we build the fall in tapered insulation.
Garden rooms are where this goes wrong. Any heated space in Three Legged Cross brings the insulation into scope under Part L when the covering is renewed. A warm roof puts the PIR above the deck, with a vapour control layer beneath it and the membrane over the top, so nothing in the structure is ever cold enough to condense on. A cold roof puts the insulation between the joists and leaves the boards below the dew point, which is exactly how interstitial condensation gets into a build up and rots it from above. Building control are notified and inspect it before it closes.
Junctions and openings. A small roof with four junctions has more places to fail than a big plain one, so this is where the care goes. The abutment gets a chase cut in and a lead cover flashing dressed home, with a cavity tray above it. A parapet gets a coping and an apron. Openings sit on kerbs so the covering turns up an upstand: rooflights, a lantern, a Velux style flat roof window, a hatch, a soil and vent pipe. The free edges finish on a drip trim, and the rainwater outlet takes the water to a hopper, a downpipe or the gutter. A garden room or an extension is two or three working days, and we say how long first.
How it runs
Re-covering a garage or extension roof, step by step

Most flat roofs in Three Legged Cross sit over a garage, a kitchen extension or a porch added to a seventies or eighties house. Thomas Hannen comes out, gets up on the roof, lifts an edge trim to see the deck, and prices it himself. The quote lists each part separately: access, stripping the old felt, any new deck boards or firrings, insulation, the membrane, each upstand and outlet, the edge trims, and taking the waste away.
The strip and the new covering sit on one written quote. In Three Legged Cross a garage roof or a single storey extension usually comes off a tower on your drive. The deck is never left open overnight, so we only strip what we can cover again before we leave, and the drive is swept before we leave. If the deck is rotten further in than the edge showed, we photograph it and price the extra boards, and you decide before any are cut out.
Replacing the covering on a flat roof you already have is repair, so there is no planning permission to apply for. Three Legged Cross sits in the green belt, which matters for building a new extension and not for re-covering an old one. There is no conservation area and a single listed entry, so listed building consent is very unlikely to come up. Where the roof is over a heated room and we add insulation, Dorset Council building control is involved.
Cost
Deck, falls and upstands on a garage roof quote

We will not quote a rate per square metre. Measuring the area takes a minute. What is under the covering is what decides the job.
How high it is, and where. A garage beside the drive is the simplest set up. A flat roof over a back extension with a conservatory beside it, or a dormer cheek at first floor, needs a bigger platform, and the platform stays up while the deck is open. The work at height rules are the reason access is its own line.
The deck. Three Legged Cross roofs from the seventies and eighties were often decked in chipboard. Once it has been wet it swells and goes soft, and it cannot be re-covered. Sound ply or OSB can. We lift a corner before we quote, because the deck is the biggest unknown in the price.
The falls and the outlet. Plenty of older flat roofs in Three Legged Cross were laid almost dead level, so water sits in the middle. Firrings put the fall back in and send the water to the outlet. That is more work than laying a membrane on top, and it decides how long the new covering lasts.
The system. EPDM rubber, GRP fibreglass and torch-on felt are all sound when laid properly. Each detail at an upstand, a wall abutment or an edge trim takes time, so a small roof with lots of edges can take longer than a big plain one.
Before you choose, ask which system is being quoted, whether the deck is renewed or covered over, and whether firrings are going in to correct the fall.
If it is coming through
Water dripping from a flat roof after rain
Ring rather than use the form. A split, a blister or a lifted upstand puts water straight onto the ceiling below, and once a chipboard deck soaks it up the damage keeps spreading after the rain has stopped.
Clear the room, put something under the drip, and if the ceiling is bulging, ease a small hole in it over a bucket so it drains in one place. On the first visit we get the roof covered and dry and see how much of the deck has gone, then price the permanent fix. Booked jobs run Monday to Friday, 8am to 6pm. Should we miss your call, we ring back as soon as we can.
Worth knowing
A new flat roofed room is a planning job before it is a roofing job
Three Legged Cross sits inside the green belt. For a repair that means nothing at all: re-covering the garage you already own is maintenance and nobody needs telling. For a new flat roofed garden room, home office or extension it means the size, the height and where it sits on the plot get looked at before anyone thinks about the covering. Some of it falls inside permitted development and some of it will not, and that is worth settling first.
There is a practical side that catches people out. Garden rooms and offices are often bought as a kit and put up with a roof designed to be cheap rather than to last. The fall is token, the outlet is a hole in a corner, and the insulation sits between the joists in a cold build up that condenses the first winter you use it. If you are having one built, get the roof specified as a warm roof with a real fall and a proper outlet from the start. It is a small part of the cost and it decides whether the room is usable in five years.
Who you are dealing with
A Boscombe firm nine miles down the road
We cover Three Legged Cross and its closes off Ringwood Road and Verwood Road, along with West Moors and Woodlands, about nine miles out from our base in Boscombe. Planning and building control sit with Dorset Council.
The business is Bournemouth Roofing & Building Ltd, registered in England and Wales, company number 15471719. Thomas Hannen is the owner, and he gets up on every flat roof and works out the price in person. On Checkatrade, a verified customer rated the work 10 out of 10. Coming out to look is free, and the itemised quote in writing is free as well. Before you book a visit in Three Legged Cross, you can read our customers' Google reviews, word for word, on our reviews page.
Planning at a glance
Do you need planning permission in Three Legged Cross?
Most repairs in Three Legged Cross need no application at all. What decides whether a change to the outside of your house does is who the council is, whether a conservation area or a listing applies, and whether the place sits in a protected landscape.
| Question | In Three Legged Cross |
|---|---|
| Who decides | Dorset Council is the planning authority for Three Legged Cross. Dorset Council's heritage pages set out what it controls. |
| Conservation area | None covers Three Legged Cross, so a like-for-like repair is ordinary maintenance. |
| Listed buildings | Yes, there are listed buildings in and around Three Legged Cross. If yours is one, work can need listed building consent. |
| Protected landscape | No National Park or National Landscape covers Three Legged Cross. |
Questions
Questions about flat roofs in Three Legged Cross
My garden office roof is soaking wet inside. Is it leaking?
Often it is condensation instead of a leak. Insulation packed between the joists with a warm room below and cold air above puts the dew point inside the construction. A warm roof build up, with the insulation above the deck and a vapour control layer under it, is the fix.
Can you re-cover a garage roof in one day?
A single garage, yes, including the strip, the new covering, the trims and taking the old material away. If the deck has to come off as well, allow a second day. We will have told you which after opening a corner.
Do I need building regulations for a new flat roofed extension?
Yes. A new extension needs building control whatever the roof is, and the insulation, the falls and the drainage are all part of it. Planning is separate, and in the green belt it is the part worth checking first.
What should I ask another quote?
Whether the deck is being renewed or covered over, whether the falls are being corrected with firrings, how the upstands and outlets are detailed, and whether the access and the waste are in the price.
Nearby, and next door
Flat roofing near Three Legged Cross
Nearby places we also cover for flat roofing, with straight-line distances from Three Legged Cross, and the other trades we offer in Three Legged Cross itself.
Flat roofing nearby
Our other trades in Three Legged Cross
Flat roofing guides
GRP, EPDM or felt: which flat roof covering? Snow on a flat roof or a conservatory Warm roof or cold roof: which do you need?Everything we do in Verwood Flat roofing, all areas Every area we cover
Free quote
Get a price for your Three Legged Cross flat roof
Tell us the address and what you have noticed. We will come out, open a corner where we can, and put an itemised price in writing. No charge, and no obligation.