Mortar and repointing in Lytchett Matravers

Two ages of brickwork share these lanes and they want two different mixes. We survey every elevation before we price a joint.

The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.

Whether your joints are due has less to do with the age of the wall than with what somebody last put into them. Lytchett Matravers has soft old solid brick cottages and long runs of nineteen seventies and eighties cavity work within a few hundred yards, and a mix that suits one will quietly ruin the other.

The calls from the village tend to be one of four things. Joints on a front elevation open far enough to see from the lane. Brick faces flaking under a sill or beside a downpipe. Sand and grit in the gutter under a chimney. A damp patch inside that only shows after a wet spell from the south west.

None of those is a rebuild. All are mortar, and most are one elevation rather than a whole house. Thomas walks all four sides, scrapes joints with a key to find how far back the decay goes, taps along a course for the hollow note that means the pointing has parted from the brick, and photographs every face. You get it back in writing, itemised elevation by elevation, with the faces we would leave for another few winters marked as such. The site visit and the written quote are free.

The work

Cottage lime, estate cement, and telling them apart

Repointing a brick wall by hand, mortar being struck into a raked-out joint
Struck by handOne joint at a time, filled and struck so the face sheds water.

The older solid walls. Roughly one house in nine in the village is pre-1919: solid wall, no cavity, handling water by letting it evaporate back out through the joint. That works only while the mortar stays breathable and softer than the brick. We rake those joints by hand to about twice the joint width, never with an angle grinder or disc cutter, and point back in an NHL lime or lime putty mix gauged to the original for sand, colour and texture, damped down before filling and brushed back once the mix has taken up. BS EN 459 sets out what the different limes are for. The profile goes back to what the wall carries, which on a Victorian or Edwardian frontage is flush or slightly recessed rather than weather struck.

Seventies and eighties outer skins. Most of the village went up after the war, the busiest years being the nineteen seventies and early eighties. That is cavity work: a single skin of fired brick in cement and sand, bucket handle or weather struck. It fails differently from lime. The joint pits and opens at the arris rather than washing out, and once rain stands in the opening a frost lifts the face off the brick. Matching means matching the sand and the gauge as well as the colour, so a trial panel goes up somewhere discreet, judged on how it will look with weathering on it.

Faces that have already blown. Where frost has taken a face off we cut the brick out whole and turn or replace it against a sample held on the wall. Filling the hollow with mortar leaves a patch that never matches. Spalling gathers in the same places on nearly every house: under sills, beside a downpipe, at the corners of a bay, and just above ground where a drive has been laid against the wall.

Chimney stacks. A third of the village is detached and a quarter bungalows, so there are a lot of stacks standing alone with weather on four sides and nothing warming them. Mortar up there goes loose and friable years before anything at ground level, and the water it lets in shows as penetrating damp on a bedroom ceiling. Repointing a stack and renewing the flaunching round the pots is work at height, so the access is the bulk of the cost. A low stack sometimes comes off a tower; anything on a main ridge is a scaffold.

Front walls and porch brickwork. A low wall is exposed on both faces and often has a coping that has stopped doing its job. Water gets in at the top, freezes and pushes the wall apart. Repointing the coping bed is quick work next to leaving it.

What we will not do is point over movement. Regular horizontal cracking every fifth or sixth course is corroding wall ties rather than tired mortar, and filling those joints hides it for a season. We say so in writing rather than take the work.

How it runs

From your call to a written price

Raked-out joints on a red brick pier being filled with fresh mortar
Raked back firstDepth before filling. A disc widens the joint and takes the arris off.

Same team from first visit to last, one person to ring, and no sub-contracting. The quote is itemised rather than a figure on the back of a card: access, raking out, the mortar mix, the area of each elevation, brick replacement and disposal all on separate lines.

Nothing is left open overnight. The site is swept at the end of each day rather than the end of the job, and what comes out leaves with us. If something turns up that nobody could have seen, you get a photograph and a price first.

Repointing like for like is repair rather than development, so there is no planning application and nothing for building control to sign off. Lytchett Matravers has no conservation area of its own, so on most addresses the joint profile and mortar colour are your decision rather than the council's. The exception is the fifteen listed entries in and around the village, the parish church among them, where the mortar is protected fabric and repointing needs listed building consent first. We check the register before anybody fills a mixer.

Cost

What decides the price of a repointing job

Brick corner with a moulded plinth course, mortar matched to the original work
Matched, not guessedColour, sand and joint profile picked up from what is already there.

No rate per square metre: the square metres tell you almost nothing until somebody has looked at the joints.

Getting to it. A pre-war cottage on the village street, a nineteen seventies detached house with a stack on the ridge and a low front wall are three different set ups. A chimney or gable wants a scaffold, a low wall a tower or nothing at all. How long the platform stands matters as much as how big it is, and the work at height rules make it a priced line.

The joints decide it, not the wall. Raking out by hand is slow, and on soft brick the only safe way, because a disc cutter widens the joint and takes the arris off. How deep the joints come back, and whether faces have already spalled, sets the hours far more than the area does. The mix matters as much: cement holds water against a soft brick and the face blows off in the first frost.

Comparing quotes? Ask how deep the joints are raked, by hand or by disc, what the mix is and whether it was matched, how many spalled bricks are cut out, and whether the scaffold is in. Two quotes for the same job are usually two different jobs.

If water is getting in

Open joints, and water coming through the wall

Stone gable with the joints repointed in a lime mortar
Stone wants limeOn rubble stone the mortar is most of the surface, and it has to breathe.

Ring rather than use the form. Joints washed out let driven rain straight through to the inside face, and penetrating damp on a chimney finds the flashings too. We look, sheet or temporarily point the worst if the weather is against us, and price the elevation once it has dried enough to see what is sound. Round here that is usually a south west gable or the chimney, and on a bungalow it shows on a ceiling rather than a wall. The phone is answered 24 hours for emergencies; scheduled work runs Monday to Friday, 8am to 6pm.

Call now: 07435 839745

Worth knowing

The mix your neighbour used is probably wrong for your wall

The village grew in two pushes with a long gap between them, so a cottage put up before the First World War can sit fifty yards from a house built in nineteen seventy eight. From the pavement they read as two versions of the same thing. They are not. The cottage is solid wall and has to breathe out through its joints. The house has a cavity behind the brick and does not.

That matters more here than in a village of one age, because neighbours share who they used and what went on. A firm sand and cement mix on a seventies wall is reasonable. Put the same mix into a soft old joint and it seals the wall: water that used to leave through the mortar leaves through the brick face instead, and the first frost takes the face with it. You end up with joints that look sound and bricks crumbling. With no conservation area, nobody at the council checks the specification for you either.

So have the wall identified before you agree anything, and get the mix and joint profile written into the quote rather than left to somebody's habit on the day.

Who you are dealing with

A local firm you can check

We cover Lytchett Matravers, Lytchett Minster, Organford, Upton and across to Wareham and Poole, broadly BH16 and the postcodes around it, all of it under Dorset Council. You are dealing with Bournemouth Roofing & Building, the trading name of Bournemouth Roofing & Building Ltd, registered in England and Wales, company number 15471719, which you can look up in a minute. Thomas Hannen's business, and he prices every job himself. A verified customer's 10 out of 10 on Checkatrade. The site visit and the written quote are free.

Questions

Lytchett Matravers questions we get asked

Our neighbour had theirs pointed in sand and cement. Should ours be the same?

Only if you own the same kind of wall. If short headers run through the pattern every few courses and the wall reads thin at a window reveal, it is solid and wants lime. If it reads thick and the bricks are all laid lengthways, it is cavity and a cement mix is reasonable. We settle that on the visit.

The joints on our seventies brickwork are pitted rather than falling out. Does that need doing?

Not necessarily this year, but worth watching. Pitting means water can stand in the joint instead of running off, and that is the stage before frost starts taking brick faces. If it is only on the weather side, do that elevation and leave the others. Both go in the quote.

Can you point one elevation now and the rest later?

Yes, and on most village properties that is what we would suggest. The south and west faces run a decade ahead of the sheltered ones, so doing the lot at once means repointing mortar with years left in it. The one thing we would not split is a chimney, because the platform is the cost.

Will the new mortar look obviously different from the old?

It will look lighter for a year or two, then settle. That is why we make a trial panel and ask you to judge it on how it will weather. Matching the sand matters more than the colour, since the sand gives a joint its texture from a few feet away.

Do you take the old mortar and rubble away with you?

Yes. Raking out makes a lot of dust and spoil, and it leaves with us rather than sitting on your drive. Sheeting goes down before we start, and disposal is a separate line on the quote.

Free quote

Have the wall identified before you agree a price

Thomas walks all four elevations, scrapes a few joints, photographs what he finds and puts the mix, the profile and the price in writing. Free.