Fascias, soffits and guttering in Lytchett Matravers

Rotten boards off rather than capped over, the run re-hung to a proper fall, and every downpipe followed to the bottom to see where it actually goes.

The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.

Half the roofline calls we get from Lytchett Matravers are not really about the gutter at all. They are about where the downpipe puts the water once it gets there, and a shoe aimed at a flowerbed will damp a wall as surely as a leaking joint.

The usual list is short. A run sagging between brackets. A joint that weeps all winter and has left a green stripe down the wall. A soffit that has dropped away at one end. Or a downpipe knocked off its clips by a ladder or a hedge and never put back properly.

None of that is diagnosed from the ground, because the board you can see is only the front of the system. We come out, get to the eaves, test the timber with a screwdriver, look at the fall on the run and follow every downpipe to the bottom. You get photographs of what is behind the boards, and a written quote itemised so the fascia, the soffit, the gutter, every downpipe and the access all carry a figure of their own. Nothing to pay for the visit or the quote.

The work

Soft boards, tired plastic and blocked outlets

A finished tiled roof with a new white fascia and gutter run along the eaves
New boards, not cappingThe old fascia comes off, so whatever is soft behind it gets found.

Finding the rot. A fascia does not fail where you look at it. It fails behind the gutter and at the ends of a run, where it never dries out, and by the time paint is peeling and blown the board underneath has usually gone. We test with a screwdriver at every joint and both ends. Soffits go from the back, and one hanging clear of the wall at one end has been wet a long time. The bargeboard and the capping over a gable are hit sideways rather than soaked from behind, so they tend to outlast both.

Off, not over. Capping over is screwing plastic onto what is already there. On a dry, sound, firmly fixed board it is honest work and we will quote it. On soft timber it hides the problem and gives the new fixings nothing to hold. Stripping is also the only way to look at the ends of the rafters and the plate they sit on, to splice out a soft one, to reinstate the tilt fillet beneath the bottom course of tiles, and to fit an eaves tray so the felt sheds forwards rather than behind the fascia.

The run itself. Gutter, outlets, unions, brackets, hoppers, downpipes and shoes are priced item by item, in uPVC, aluminium on a long straight elevation, or cast iron repaired and painted where an older property still has it. Half round is the ordinary profile, ogee sits square to the fascia, and deepflow is what to ask for where a big slope drains into one short length and the gutter overflows in every downpour. A run hung dead level looks correct and works like a trough, so we strike a line, drop it steadily to the outlet, and put the brackets in tight enough that no length can bow, each taking a screw into solid timber.

Proving it. Once it is up, water goes in at the far end and we watch it come out at the shoe. That is also when a collapsed outlet shows itself, and when you find out that the downpipe you assumed went into a drain in fact stops short above a paving slab. Both get put right while we are there rather than written on a snagging list.

Air and nuisance. With the soffit down we put eaves ventilation in, either through the boards or over the fascia, and hold the air gap open above the loft insulation. A roof space with no air grows condensation on the felt and damp in the timbers, and it costs almost nothing to prevent while the eaves is open. Mesh and closures go on with the new boards, since the gap behind a soft soffit is a nesting site for birds and wasps, and moss and debris washing down off the tiles is what leaves an outlet blocked by November.

How it runs

From your call to a written price

A completed hipped roof with the eaves, fascia and gutter run finished
Every hip, every runA hipped roof is more eaves per house, and more to hang straight.

Same team from first visit to last, one person to ring, and no sub-contracting your work out to somebody you have never met. The quote is itemised, not a figure on the back of a card: access, the length of each run, stripping the old boards and gutter, the fascia, soffit and any bargeboard, the gutter, outlets and downpipes, and disposal on separate lines, so you can compare it properly against anyone else's.

Nothing is left open or unusable overnight. The site is swept at the end of each day rather than the end of the job, and what comes out leaves with us. If something turns up once we start that nobody could have seen, you get a photograph and a price before we carry on.

A like for like roofline renewal is repair and maintenance, so there is no planning application and nothing for building control, and Planning Portal guidance draws the same line for the roof. There is no conservation area over Lytchett Matravers, though there are listed entries in the village, and on a listed building a change of material needs listed building consent in its own right.

Cost

What decides the price of a roofline

A roof part way through re-tiling, with the eaves course and the gutter visible
The bottom courseThe tiles have to drip into the gutter rather than behind it.

No rate per square metre, because a metre of fascia over a bay is not the same metre as one on a straight gable.

Getting to it. A bungalow with the run over a border, a detached house with a conservatory beneath the back gutter, and a cottage on the village street with a low eaves are three different ways in. A bungalow run comes off a tower, a two or three storey gable wants a scaffold, and a run over a conservatory or a bay window means building the platform around it. The work at height rules are why the access is a priced line rather than something absorbed into a rate.

What is behind the boards. Rotten fascia is a symptom. The question is whether the rafter feet and the wall plate behind it are still sound, and nobody knows until the old board comes off. Capping over with plastic hides that instead of fixing it, which is why we take the old boards off rather than clad them.

The run, not the metre. A straight gable is quick. Bay windows, a conservatory in the way, a corner return, a run that has to be worked around a satellite dish or a service cable, and every outlet, hopper and downpipe are priced one at a time. So is putting the fall back: a gutter hung level looks fine and holds water all year.

Comparing quotes? Ask whether the old boards are coming off or being capped over, what happens if the rafter feet or the wall plate turn out to be rotten, whether the gutter, outlets and downpipes are all being renewed or only the fascia, and whether the scaffold is in the price. Two quotes for the same job are usually two different jobs.

If a section has come away

A gutter hanging off, or a fascia gone through

Ring rather than use the form. A length of gutter pulled off its brackets, a downpipe snapped at the bend or a fascia soft enough to put your hand through goes to the front of the queue, because the next heavy rain runs straight down the wall and into the brickwork. The first visit is about getting it supported and discharging somewhere sensible, and we price the run properly once we can see how far the rot goes. Lytchett Matravers is a short run out from us, so a section hanging off after a gale is usually same day or next. The phone is answered 24 hours for emergencies; scheduled work runs Monday to Friday, 8am to 6pm.

Call now: 07435 839745

Worth knowing

Your downpipe has to finish somewhere sensible

In a village like this the rainwater does not always leave in a pipe. Plenty of downpipes here discharge into a gully, a soakaway in the garden, or in the older properties simply onto the ground, and that is the part of the system nobody ever looks at. It matters because everything the roof sheds arrives at one small point at the bottom of a wall.

What we check is straightforward. Does the shoe actually deliver into the gully, or has it been knocked round so it throws water at the brickwork. Does the gully take it away or fill up and stand. Does the soakaway still work, or has it silted so that heavy rain backs up and floods a path. A downpipe discharging badly is one of the commonest causes of damp at the foot of a wall and of staining down a render, and it is regularly blamed on the gutter above it. Where a discharge point genuinely needs changing, the ground rules are in Approved Document H, and it is worth getting right because the whole village drains towards Poole Harbour and there is no sense pushing roof water somewhere it will simply stand. We will tell you on the visit whether you have a gutter problem, a drainage problem, or both.

Who you are dealing with

A local firm you can check

We cover Lytchett Matravers, Lytchett Minster, Upton, Sturminster Marshall, Corfe Mullen and Wareham, broadly BH16, under Dorset Council. You are dealing with Bournemouth Roofing & Building, the trading name of Bournemouth Roofing & Building Ltd, registered in England and Wales, company number 15471719, which you can look up in a minute. Thomas Hannen's business, and he is the one who comes out to price the job, not a salesman. A verified customer's 10 out of 10 on Checkatrade. The visit and the written quote are both free.

Questions

Lytchett Matravers questions we get asked

The wall under my gutter is damp. Is the gutter to blame?

It might be the gutter, and it might be the pipe below it. A weeping union, a downpipe off its clips or a shoe pointing at the wall all soak the brickwork in the same way. It is worth ruling the rainwater out before anyone talks about damp proofing.

Do you replace the downpipes as well?

If they need it, and they are shown on the quote as their own line so you can see what each one costs. Often the run needs renewing and the pipes only need refixing, and we will say so rather than sell you both.

Can you match the colour of the existing runs?

Usually. White, black and anthracite are all easy, and a woodgrain foil reads as painted timber from the road. Bear in mind an old white run has weathered, so a new white board beside it will look brighter for the first year or so.

How long will the work take?

A bungalow is often a day or two. A house with bays, corner returns and several downpipes takes longer, and any timber repair found behind the boards adds to it. We photograph and price anything unexpected before carrying on.

Free quote

Get a price for your Lytchett Matravers roofline

Tell us the address and what you have noticed. We will get to the eaves, follow the pipework down and put an itemised price in writing, free of charge.