Rendering in Hyde, inside the national park

Out here the planning authority is the national park, not the district council, so the finish on an external wall is a decision to settle before the scaffold is booked.

The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.

The planning authority out here is the national park rather than the district council, and the whole area sits inside the Western Escarpment conservation area. That matters for render because the usual freedom to re-render or repaint a house in whatever finish you fancy does not apply in the same way on designated land.

Practically, it means the finish is a decision to make early rather than on the morning the scaffold goes up. Colour, texture and material all get looked at, and a wall that has to come off again is the most expensive render job there is.

The work itself is the same work we do anywhere: sounding the elevation for hollow areas, hacking off what has blown, and rebuilding in the right system for whatever the wall is made of. Around here that is often an older solid wall rather than modern blockwork, which narrows the sensible options considerably. We tap the wall, tell you what has let go, and itemise the access, the preparation, the system, the beads and the making good. The visit and the written quote are free.

The work

Solid walls, blown patches and a wet bottom metre

A house elevation part way through rendering, old finish on one side and new render on the other
Half and halfThe old finish on one side, the new system on the other.

Tapping first. Sound render rings hard, blown render sounds hollow and drummy. We go over every elevation and mark the edges of the hollow areas, because they are always larger than the crack that prompted the call and they decide the price.

Hacking off and rebuilding. Where the render has parted from the background it has to come off, back to clean sound masonry. Loose joints are repointed, the background is prepared and stabilised where it is dusty, then the new system goes on in coats.

Lime render on solid walls. A pre-1919 wall has no cavity and was built to take moisture in and dry it back out through the face. Lime keeps that route open. It goes on as a hair reinforced scratch coat with a good key, a float coat, then a finish or a limewash, and it is kept damp and sheeted while it carbonates.

Getting an old cement render off. The commonest fault on the older cottages is a hard cement skin put on decades ago. It cracks, water gets behind, and the cement will not let it back out, so the wall stays wet and the salts and frost do the damage. It comes off by hand, patiently, rather than with a breaker.

The bottom metre of the wall. Surface water sits about here after heavy rain and the ground stays soft, so splash back keeps the base of an elevation wet long after the rest has dried. That is where the blown areas start. A bellcast bead above the damp proof course with a clear gap under it, and ground kept low, does more for a render than any topcoat.

Sand and cement, pebbledash and Tyrolean. Ordinary work on the twentieth century houses out here. Scratch coat, float coat, dash or Tyrolean where the elevation already carries it, matched to a sample panel where the aggregate is still available.

Silicone thin coat and monocouche. Both are good on a modern cavity wall: a stabilising primer, a mesh reinforced basecoat, then a through coloured topcoat with no painting afterwards. Both are wrong on a breathable solid wall, and in a conservation area the texture and colour have to be agreed before they are ordered.

Beads and stop ends. Bellcast at the base, stop beads at reveals and eaves, angle beads on corners, and a movement joint where an elevation is long or two structures meet. On older fabric we hand form the arris instead, because a hard bead in a soft wall gives the render an edge to crack against.

External wall insulation. Board fixed outside and rendered over, on a render carrier where the background will not take a direct fix. It raises the thermal performance without losing a room, but it thickens the wall and changes every reveal, so on a designated frontage it is rarely the answer.

How it runs

From your call to a written price

A rendered bungalow elevation finished and cleaned down, with beads and stop ends in place
Beads and stop endsWhere the render stops is where it is judged.

Same team from first visit to last, one person to ring, and no sub-contracting your work out to somebody you have never met. The quote is itemised, not a figure on the back of a card: access and scaffold, protection, preparation of the existing wall, the system and number of coats, beads and stop ends, and making good on separate lines, so you can compare it properly against anyone else's.

Nothing is left open or unusable overnight. The site is swept at the end of each day rather than the end of the job, and what comes out leaves with us. If something turns up once we start that nobody could have seen, you get a photograph and a price before we carry on.

Planning here goes to the New Forest National Park Authority rather than the district, and the whole area lies in the Western Escarpment conservation area, where external appearance is controlled. There are 21 listed entries nearby, and on a listed building the render is part of the fabric. The Park sets out what its heritage designations cover, and we look an address up before quoting a change of finish.

Cost

What decides the price of a rendering job

No rate per square metre, because the square metres are the easy part; what is already on the wall decides the price.

Getting to it. A cottage on a soft verge needs the platform footings thought about, a farmhouse with open ground takes a straightforward scaffold, and a two storey elevation with a lean-to against it wants the roof below protecting first. A bungalow gable comes off a tower, a three storey elevation wants a scaffold, and the platform has to stand for the whole system rather than a day. The work at height rules are why it is a priced line rather than something folded into a rate.

What is already on the wall. Rendering over sound brick is one job. Hacking off blown sand and cement, or a pebbledash that has parted from the background, is another, and it is the part nobody can see from the road. We tap the whole elevation before quoting, because the hollow areas set the hours.

The system, and what the wall behind it needs. Silicone thin coat over insulation, monocouche through-coloured, or traditional sand and cement all price differently and behave differently. On a solid wall that has to breathe, a plastic-rich modern system traps moisture and moves the problem inside, so the right system is a wall decision rather than a colour decision.

Comparing quotes? Ask which system is being quoted and how many coats, whether the old render is being hacked off or overlaid, whether beads, bellcast and stop ends are included, whether the scaffold is in the price, and what happens to the existing sills and pipework. Two quotes for the same job are usually two different jobs.

If it has started to come away

Render that has blown or cracked open

Ring rather than use the form. A section that sounds hollow when you tap it, or a crack you can get a coin into, is letting water behind the render and the frost does the rest. We make the loose area safe, sheet it if the weather is against us, and price the elevation once we can see how far the blown area actually goes. With the water table high after a wet spell, a lost patch low down on a wall soaks up ground water quickly, so those get sheeted straight away rather than left until spring. The phone is answered 24 hours for emergencies; scheduled work runs Monday to Friday, 8am to 6pm.

Call now: 07435 839745

Worth knowing

Who you are actually applying to out here

Most people assume the district council handles their planning. Inside the national park boundary it does not. The National Park Authority is the planning authority, it has its own policies, and it takes a closer interest in how buildings look than a district authority would on an ordinary estate. On top of that the Western Escarpment conservation area covers this side of the forest, which controls external appearance in its own right.

What that means for a render job is straightforward. Check the boundary before you choose anything, because the Park publishes an interactive property map that shows what applies to a given address. Expect the material, the texture and the colour all to be relevant rather than just the colour. Allow time in the programme for a decision if the finish is a change rather than a repair. And where the wall only needs its existing finish repaired, say so clearly, because a like for like repair is maintenance and does not need any of this.

Who you are dealing with

A local firm you can check

We cover the hamlets around here, Frogham, Godshill and the lanes towards Fordingbridge, broadly SP6, under the New Forest National Park Authority. You are dealing with Bournemouth Roofing & Building, the trading name of Bournemouth Roofing & Building Ltd, registered in England and Wales, company number 15471719, which you can look up in a minute. Thomas Hannen's business, and he is the one who comes out to price the job, not a salesman. A verified customer's 10 out of 10 on Checkatrade. The visit and the written quote are both free.

Questions

Hyde questions we get asked

Who do I apply to for planning out here?

The New Forest National Park Authority rather than the district council. It is the planning authority inside the park boundary and has its own policies. Its property map shows what applies to a specific address, and it is worth checking before you settle on a finish.

Does a like for like repair need permission?

No. Repairing an existing render in the same material, texture and colour changes nothing anyone can see, so it is maintenance. What needs thinking about is a change: a different system, a noticeably different texture, or a colour that reads differently from the street.

Why does the render always fail at the bottom of the wall first?

Because that is the part that stays wet. Rain bounces off the ground onto the base of the elevation, and where surface water sits after a downpour the wall wicks it up as well. The rest of the wall dries in an afternoon; the bottom metre can stay damp for days, and frost does the rest.

Can we improve the insulation while the render is off?

On a modern cavity wall, yes, and it is the sensible time to do it. On a breathable solid wall it needs a build up designed to stay open, not a standard board and a plastic topcoat, and on a frontage in a conservation area the extra wall thickness is usually the thing that rules it out.

How long does a render job take from first visit to finish?

The visit and the written quote come quickly. The work itself depends on the system: a modern thin coat is a week or so on a typical house once the scaffold is up, lime is slower because each coat has to cure, and a decision from the planning authority adds to the front end.

Free quote

Check the designation before you choose a finish

Thomas looks the address up against the park and conservation area boundaries, taps the elevation and prices the repair or the system line by line. The visit and the quote are free.