Patios in Tolpuddle

Paving set out around cottages with deep overhanging eaves, where the drip line matters as much as the falls.

The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.

Last updated

The awkward part of a patio in Tolpuddle is usually the last three feet of it, the strip nearest the house. Old cottages here carry deep overhanging eaves, and what comes off that roof in a downpour lands well out from the wall, on whatever you have just paved.

So on a Tolpuddle patio the trouble sits in the same corner of the garden. A line of slabs beside the wall that has sunk and now holds water. Jointing washed out where the drip has hammered it year after year. And green, slippery paving on a strip that never gets the sun and never dries.

Fixing that is a levels and drainage job before it is a paving job. We come out to Tolpuddle, lift a slab, dig a trial hole, look at where the eaves actually throw water, and take levels off the building. Then you get one written itemised quote with the dig, the muck away, the sub base, the paving, the edges and the jointing on separate lines. The visit and the quote are free.

The work

Terraces, margins and the strip beside the wall

Porcelain patio slabs laid to a fall with a gravel border alongside (one of our own jobs, shown for patios in Tolpuddle)
Laid to a fallWater goes away from the house, not along the wall. Photo from one of our own jobs.

What comes out first. Old concrete, cracked flags on a sand bed, brick paviours gone soft, a raised bed or a stump and its roots. We excavate to firm formation rather than to a set depth, clear out made ground where we find it, and load the spoil straight into a grab lorry or a skip so the muck away leaves with us.

The sub base. A geotextile separator over soft ground, then MOT Type 1 brought up in compacted layers of about 100mm. Hardcore dumped in one lift and given one pass with a whacker is why so many patios are rocking by their third winter.

The margin at the wall. Under a deep eaves we would rather not run slabs hard up to the brickwork at all. A gravel border on a land drain takes the drip, keeps the splash off a soft old wall, and gives the paving somewhere to shed to. Where the door threshold sits low, an ACO channel across it and a run to a gully or a soakaway does the same job in less width.

Porcelain. Calibrated twenty millimetre porcelain is dense enough that a wet strip under an eaves stays a wet strip rather than becoming a green one. It goes on a full bed of mortar over a slurry primed back, never on dabs, because voids under a dense slab crack.

Stone. Sandstone is warm, easy to work and forgiving, but porous, so it darkens and greens where water lands repeatedly. Limestone is more even and marks with iron. Granite is the hardest and copes best with a permanently damp position. Travertine is not one for Tolpuddle. Hand cut stone varies in thickness, so the bed levels it; calibrated stone is sawn to one depth.

Falls, levels and the damp course. Paving falls away from the building and finishes clear of the DPC, two courses below it where the garden allows, which is the point of Approved Document C. On a cottage with no damp course at all, the answer is a margin, a channel and a step down rather than paving up the wall. Water then goes to a gully, a soakaway or a permeable build so the runoff stays on your ground.

Edges and jointing. Edging bedded and haunched in concrete, a coping to any low retaining wall, a kerb line where paving meets lawn. Stone is hand pointed in a matched mortar or given a brush in compound worked into a full joint; porcelain takes a grout made for dense units. Short joints under a drip line wash out first.

Repairs. Re-bedding a rocking slab, rebuilding a sunken run, swapping cracked units, renewing failed jointing and cleaning down a slippery terrace.

How it runs

How a patio goes in behind an older house

A finished porcelain patio in the wet, showing how the surface drains and where the joints sit (one of our own jobs, shown for patios in Tolpuddle)
Judged in the wetRain shows the falls and the joints that a dry day hides. Photo from one of our own jobs.

Thomas looks at the Tolpuddle garden, the levels against the house wall, where rainwater runs and how materials will get in. The written quote itemises excavation and muck away, the sub-base, the falls and where the water goes, edgings and steps, the slabs themselves, and jointing. Thomas stays your contact from the first spade to the final brush.

On an older Tolpuddle house the damp proof course, if there is one, sets the finished level, so we check it before anything is dug. Nothing is left as an open trench overnight where somebody could fall, the spoil leaves with us, and paths are swept each day. If the dig finds an old drain or a buried slab, you see a photo and a price for it before the work carries on.

Paving at ground level in a back garden is normally not a planning matter and does not need building control, though drainage joined into an existing system can. What is visible from the road, opening a boundary wall for access, or felling a tree are separate questions. Dorset Council keeps the record of listed buildings, and the village is in the Tolpuddle Conservation Area, so it is worth asking them before changing anything visible.

Cost

What changes the cost of a patio

Choosing the slabs is the enjoyable part, and it is rarely where the money goes. How materials reach the garden. If a barrow can run straight from the drive to the dig, the job moves. If every slab, every load of sub-base and every bag of sharp sand has to be carried down a side passage or through the kitchen, it takes days longer. Steps, raised edges and any machinery still fall under the work at height rules.

Clearing the ground. Old concrete, a rockery, roots from a hedge, or a layer of rubble someone buried years ago all have to be broken out and taken away. We price that by the skip or grab load, because the depth is unknown until the digging starts.

The level against the house. The finished surface should sit two courses below the damp proof course and fall away from the wall. Plenty of older cottages in Tolpuddle have a damp course that is hard to find, or none at all, so getting the level right may mean digging down, building a step, or setting a channel drain along the wall.

How each slab is bedded. A full mortar bed supports the whole slab. Spot dabs leave hollows that crack under a table leg.

When another quote arrives, ask how deep the sub-base is, whether the slabs sit on a full bed, which way the falls run, and what jointing goes in.

If it has become a hazard

A slab that has sunk, rocked or become a trip

Ring rather than use the form. A slab lifted at one corner, a step that has dropped or a north facing patio gone green and slippery in winter can put someone on the ground.

If it is the slab by the back door, say so, because that is the one that catches people in the dark. On the first visit we lift and relay the worst of it or mark it off, and then look at whether the sub-base under the rest has failed. Booked patio jobs run Monday to Friday, 8am to 6pm. If we miss you, we ring you back as soon as we can.

Call now: 07435 839745

Worth knowing

Where the rain comes off the roof decides the edge

A cottage with a deep overhang throws water a long way out. Modern houses have a gutter close to the wall and a downpipe into a gully, so paving can run right up to the brickwork. Plenty of the older buildings in Tolpuddle do not work that way, and the slabs nearest the wall take a concentrated line of water every time it rains hard.

That scours the jointing out of one row of joints while the rest of the patio looks fine, and soaks the base under that row until it settles and the slabs start to rock. On a wall with no damp proof course it also drives splash back up the fabric, which is a damp problem rather than a paving one.

So we set the patio out from the drip line first and the door second. A stone margin on a land drain, or a channel where there is no room for one, takes the load. Where thatch is involved we keep the working platform and the machinery clear of the eaves, because a barrow load caught on an overhang costs more than the paving does. It is a small change to the design and it is the difference between a terrace that looks the same in ten years and one that needs lifting in three.

Who you are dealing with

Who you are booking for your patio

We cover Tolpuddle, Burleston, Affpuddle, Puddletown and the villages along the Piddle valley. Our base is in Boscombe, some twenty miles east, and your council is Dorset. The business is Bournemouth Roofing & Building Ltd, registered in England and Wales, company number 15471719. Before you book a visit in Tolpuddle, you can read our customers' Google reviews, word for word, on our reviews page.

It belongs to Thomas Hannen, and Thomas is the one who walks your garden and works out the price. Checkatrade shows a 10 out of 10 left by a verified customer. Neither the site visit nor the quote costs anything, and the quote comes in writing with every item on its own line. Eaves drip onto the front path just as they do at the back, and a driveway in Tolpuddle next to an old cottage needs the same margin.

Planning at a glance

Do you need planning permission in Tolpuddle?

Most repairs in Tolpuddle need no application at all. What decides whether a change to the outside of your house does is who the council is, whether a conservation area or a listing applies, and whether the place sits in a protected landscape.

The planning position in Tolpuddle, from council and national records.
Question In Tolpuddle
Who decides Dorset Council is the planning authority for Tolpuddle. Dorset Council's heritage pages set out what it controls.
Conservation area Yes: Tolpuddle Conservation Area. Check whether your street is inside the boundary before changing anything visible.
Listed buildings Yes, there are listed buildings in and around Tolpuddle. If yours is one, work can need listed building consent.
Protected landscape No National Park or National Landscape covers Tolpuddle.

Questions

Questions about patios in Tolpuddle

Why has only the row of slabs by the wall sunk?

Because that row takes the water off the roof. A concentrated drip washes the jointing out and softens the base under one line of paving while the rest stays dry and sound.

Should the patio come right up to the cottage wall?

Usually not on an old building. A gravel margin or a drainage channel between the paving and the wall takes the drip, keeps splash off soft brickwork and gives the falls somewhere to run to.

Our floor is lower than the garden. Can we still have a level terrace?

Yes, with a step down and a retaining edge holding the higher ground back. What we will not do is build the paving up the wall to make it flush, because that bridges the damp course.

Will a digger fit down the side of the cottage?

A micro digger goes through most standard side gates. Where the passage is too tight or the eaves too low we dig and barrow by hand, and that time is shown as its own line.

How soon can we use it after it is finished?

Walk on it the next day. Keep heavy furniture and pots off for two or three days while the bedding mortar and the jointing take up properly.

Free quote

Get the edge beside the house designed properly

Thomas comes out, looks at where the water lands and prices the dig, the base, the margin and the paving in writing. The visit and the quote are free.