Patios in Winterborne Kingston, built for winter ground

The water table here rises under the garden for half the year, so a base that felt solid in August is the reason a terrace drops along one edge by spring.

The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.

Next to a winterbourne the ground is not the same in February as it is in August. The water table comes up under the garden for part of the year, and a patio base built in a dry summer on ground that will be saturated by Christmas is the reason so many terraces here sink at one end.

Three things bring people to the phone. A terrace that was fine for a couple of years and has now dropped along one edge. Joints washed out and weeds coming through where water has been moving under the paving. And a doorway that puddles every winter and stays dry all summer.

We dig a trial pit before quoting anything, because what the ground does when it is wet is the whole story. Then you get levels off the house and a written price with the dig, the muck away, the sub base, the falls, the drainage, the edgings, the paving and the jointing on separate lines. The site visit and the itemised quote are free.

The work

Building a patio on ground that rises and falls

Porcelain patio slabs laid to a fall with a gravel border alongside
Laid to a fallWater goes away from the house, not along the wall.

The trial pit. One hole tells you what a brochure cannot: how deep the topsoil goes, whether there is made ground under it, and how fast water leaves. On a plot near a winterbourne we want to know where the water sits, not just where it drains.

The dig and the muck away. Turf, topsoil, old concrete, roots and soft made ground get excavated out until the formation stops moving underfoot. On ground like this that is usually deeper than a standard build up, and the spoil leaves in a grab lorry or a skip rather than being spread over the garden.

The sub base. MOT type 1 in compacted layers with a geotextile between the subgrade and the stone. That membrane matters more here than almost anywhere: without it, a wet subgrade pumps up into the stone every winter, the sub base loses its grading and the paving settles.

Drainage first, paving second. An ACO channel across the low side and at any threshold, falls set to run into it, and a gully into a positive outfall. A soakaway is only worth building where the pit proves the ground takes water, and next to a winterbourne it often does not in winter.

Falls and the damp course. A consistent fall away from the house, and a finished surface at least two courses below the damp proof course. Where the threshold is low, a recessed channel across the door does the job that raising the paving must not.

Full bed, never dabs. A full wet mortar bed under every slab, with a slurry primer on the back of porcelain. Dabbed slabs leave voids, voids fill with water on ground like this, and the first hard frost lifts the flag.

Porcelain and stone. Calibrated porcelain absorbs almost nothing, comes in slip rated finishes and shrugs off a wet winter. Riven sandstone and limestone suit the older houses in the village, travertine less so on damp ground, and granite is the toughest of the natural options for steps and edges.

Edges, steps and retaining. Haunched edging or a kerb so the outer course cannot creep, a retaining edge with a coping where the ground is held back, and step treads on a full bed with an overhang so water drips clear of the riser.

Jointing and repairs. A resin grout brushed into damp joints, or pointing in mortar on riven stone. We also lift and relay sunk bays and rocking flags, cut out cracked ones, repoint washed out joints and deal with staining, efflorescence and a slippery green surface.

How it runs

From your call to a written price

A finished porcelain patio in the wet, showing how the surface drains and where the joints sit
Judged in the wetRain shows the falls and the joints that a dry day hides.

Same team from first visit to last, one person to ring, and no sub-contracting your work out to somebody you have never met. The quote is itemised, not a figure on the back of a card: excavation and muck away, the sub base, the falls and where water goes, edgings and steps, the slabs themselves, and jointing on separate lines, so you can compare it properly against anyone else's.

Nothing is left open or unusable overnight. The site is swept at the end of each day rather than the end of the job, and what comes out leaves with us. If something turns up once we start that nobody could have seen, you get a photograph and a price before we carry on.

Dorset Council is the planning authority. There is no conservation area covering the village and only a handful of listed entries in the area, so the paving itself is normally ordinary permitted development and the material is your choice. What does need care is anything that changes ground levels or drainage on a plot in a flood zone, because that brings building control and, on a bigger scheme, the drainage authority into it. A retaining wall above the permitted height is a separate question again.

Cost

What decides the price of a patio

No rate per square metre, because the slabs are the part you choose and the smallest part of the price.

Getting to it. A cottage on the street with a barrow width path, a bungalow with a gate off the drive and a house with a paddock a lorry can turn in are three different jobs on the same area. Everything comes in and goes out through the garden, often through a side gate or the house. A patio you can barrow to directly is a different job from one where every slab is carried. The work at height rules still apply to the dig and the machinery.

What is coming out before anything goes down. An old concrete slab, a raised bed, tree roots or made ground all have to be dug out and taken away, and that is priced by the load rather than by the metre. The dig is where a patio quote is won or lost.

Falls, levels and the damp course. A patio has to fall away from the house and finish at least two courses below the damp proof course, and getting that right often means steps, a retaining edge or a drainage channel. Laying a new patio up against a wall at the wrong level is the single most expensive mistake on this kind of job.

Comparing quotes? Ask how deep the dig goes and what sub base is specified, whether the slabs are laid on a full wet bed or on dabs, what the falls are and where the water goes, whether edgings and steps are included, and what the jointing compound is. Two quotes for the same job are usually two different jobs.

If it has become a hazard

A patio that has lifted, sunk or turned slippery

Ring rather than use the form. A slab that has lifted at one corner or a step that has dropped is a trip, and a north facing patio in winter can be genuinely dangerous. We can usually lift and re-lay the worst of it quickly, then look properly at whether the base under the rest has gone. If a bay has dropped by a doorway, ring while the weather is still wet, because a photograph of where the water actually stands is worth more than a dry survey. The phone is answered 24 hours for emergencies; scheduled work runs Monday to Friday, 8am to 6pm.

Call now: 07435 839745

Worth knowing

The winterbourne, and what it does under a patio

The stream runs within about seventy metres of the village and the flood maps put parts of the settlement in flood zones two and three, with a high surface water risk band on top. You can check what applies to a particular address in a minute or two, and it is worth doing before any garden work.

The thing to understand about a winterbourne is that it is seasonal. The ground water rises through the autumn, the stream runs through the winter and spring, and by late summer it can be dry. Gardens along it behave the same way. Ground that takes a spade easily in August is heavy and saturated in January, and any base built without allowing for that is being tested in conditions nobody saw on the day.

So the build up here is deliberately conservative. A deeper dig, a geotextile under the sub base so a wet subgrade cannot work its way into the stone, compaction in thin layers, and drainage designed for the wet half of the year rather than the dry one. It costs more in the dig and the muck away than a summer job appears to need, and it is why the patios we lay here are still flat when the ones laid on a thin base are not.

Who you are dealing with

A local firm you can check

We cover the village, Winterborne Whitechurch, Milborne St Andrew and the lanes along the valley, broadly DT11, under Dorset Council. You are dealing with Bournemouth Roofing & Building, the trading name of Bournemouth Roofing & Building Ltd, registered in England and Wales, company number 15471719, which you can look up in a minute. Thomas Hannen's business, and he is the one who comes out to price the job, not a salesman. A verified customer's 10 out of 10 on Checkatrade. The visit and the written quote are both free.

Questions

Winterborne Kingston questions we get asked

Why has my patio sunk on one side only?

Usually because the ground under that side holds water and the side that stayed dry does not. Wet subgrade works up into a thin sub base, the stone loses its grading and the paving follows it down. Relaying the slabs alone will not stop it happening again.

Is it worth laying a patio on ground that floods?

Yes, provided it is built for it. A deeper dig, a membrane under the sub base, compaction in thin layers and drainage designed for the wet months make the difference. What does not work is a shallow base and a soakaway that fills up.

Should we wait for summer to have the work done?

Not necessarily. Digging in the wet is harder and the muck away is heavier, but seeing the ground at its worst is genuinely useful. What we will not do is bed slabs or joint them in a frost or into standing water.

Do weeds in the joints mean the patio has failed?

Not on their own, but they are a signal. Seeds germinate in joints that have opened or washed out, and joints wash out when water is moving through the surface rather than off it. Rejointing is the easy half of the answer, the drainage is the other.

Can you raise the patio above the wet ground instead?

Only within limits, because the finished level still has to stay well below the damp course and a raised terrace is a different planning question. On most plots here the better answer is to dig deeper and drain it rather than to build up.

Free quote

Get a base built for the wet half of the year

Thomas comes out, digs a trial pit, takes levels off the house and prices the dig, the base, the drainage, the falls and the jointing in writing. The visit and the quote are free.