Loft insulation in Iwerne Minster
Cut roofs, purlins and old ceilings, surveyed before anything is quoted, then brought up to depth without closing the eaves, across Iwerne Minster and DT11.
The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.
Older village houses nearly all have a cut roof, so there are purlins through the space and ceiling joists that never sit at a tidy spacing. The material gets cut to the bay rather than rolled out from the hatch, and the ceiling underneath decides how much of the loft you can go on using.
Why people ring
A cottage that will not hold its heat

It usually starts with one cold bedroom. The room in the gable sits behind the rest of the house all winter, and turning the heating up only makes the bill worse. Sometimes the trigger is a clear out instead: the loft was boarded years ago and nobody can remember what went under the boards.
Either way it wants looking at rather than pricing over the phone. We get through the hatch and onto crawl boards, measure the real depth in several places, feel along the wall plate to find out whether the eaves are still open, and photograph all of it so you can see it without going up. The written quote that follows sets out the strip out, the material, the finished depth, the hatch and the disposal on their own lines. Neither the site visit nor the quote costs anything, and if what is up there is sound we would rather say so than sell you wool.
Up in the roof
Purlins, hand cut joists and a ceiling you cannot kneel on

Nothing in a cut roof repeats. The rafters were pitched on site with purlins running through the middle of the space, so you can stand up in most of it, but the ceiling joists below were cut by hand and their spacing wanders from one end of the run to the other. Roll does not like that. It bridges the narrow bays and leaves a gap in the wide ones, so the first layer usually goes in as rockwool batts or as mineral wool roll cut to each bay, friction fitted tight to the timber on both sides. Where the joists sit close together and there is no room to open anything out, loose fill poured in and levelled does what a roll cannot.
What we find first is rarely bare timber. Something went down decades ago, and by now it is compressed flat wherever anyone has knelt, patchy across the middle, missing altogether along one side and full of holes where a cable or a pipe crosses. Sound wool is worth keeping: it gets teased apart, straightened between the joists and covered. Anything contaminated with droppings, anything wet under a slipped tile, and granular fill drifted into the corners is bagged where it lies and carried out.
The ceiling under all this is often lath and plaster, and lath and plaster will not take a knee. So the work runs off boards spanning the joists, moved along as we go, and material is carried out from the hatch rather than dragged across the tops of the timbers. Where the roof drops away over a back addition the space becomes a crawl, and that stretch is measured in time rather than in floor area. Getting up there is work at height even indoors, so the ladder and the hatch are settled at the survey and anything you store up there comes down before we start.
With the base even, the second layer goes on and it runs the other way. Cross laid over the top of the joists instead of between them, so the timber is buried and stops carrying heat straight down into the plaster. That is the layer people leave out, and it is the one that moves the U value. Two layers to about 270mm is what a renovated ceiling is expected to reach under Part L, set out in Approved Document L, and on a house with solid walls it is the cheapest thermal work left in the building. Glass wool, rockwool, roll or batt, sheep wool if you would rather have a natural fibre: the choice comes from the shape of the loft, not from the label on the packet.
Then the perimeter and the fittings, which is where the hours actually go. Insulation is carried out over the wall plate and stopped there, with a vent tray at every rafter holding an air gap open so cross ventilation still runs soffit to soffit. Choke that gap and the dew point moves into the structure, interstitial condensation forms on the underside of the felt where nobody can see it, and black mould creeps down the rafters by the end of the winter; BS 5250 is the code that deals with moisture in a roof, and it is worth knowing that the risk is well understood rather than bad luck. A ridge vent or a run of tile vents takes the job on where the eaves cannot be opened, and a breathable membrane changes the detail rather than the requirement. Recessed lights take fire rated covers. Every cable is lifted and clipped above the new layer instead of being buried in it. The cold water tank and its pipework get lagging now they sit in properly cold air, with nothing laid underneath the tank. The hatch has a board fixed to its back and a draught seal round the lining, loft legs carry a raised floor if you want to keep using the space, and the loft ladder is checked against the new height. Where the roof was turned into a room years ago the job moves to the rafters instead: PIR rigid board such as Celotex cut between them with the air gap kept above, a taped vapour control layer behind the plasterboard, and multi-foil quilt in the sloping ceiling and the dormer cheeks where there is no depth left to give.
How it runs
From your call to a written price

Same team from first visit to last, one person to ring, and no sub-contracting your work out to somebody you have never met. The quote is itemised, not a figure on the back of a card: the survey, clearing and bagging whatever is up there now, the material and its depth, keeping the eaves clear, the hatch and any pipework, and disposal on separate lines, so you can compare it properly against anyone else's.
Nothing is left open or unusable overnight. The site is swept at the end of each day rather than the end of the job, and what comes out leaves with us. If something turns up once we start that nobody could have seen, you get a photograph and a price before we carry on.
Insulation laid inside a loft is not development and needs no application, which Planning Portal guidance on insulation sets out, so permitted development is not the question. Building control appears only where the roof itself is renovated, and regulation 23 then brings the whole element up to current standard. Iwerne Minster has its own conservation area and a good number of listed entries, so where work would change the outside of the roof, listed building consent or an application to Dorset Council comes first.
Cost
What decides the price of a loft

No rate per square metre, because the floor area is the easy part and the awkward edges are where the time goes.
Getting to it. A cottage with the hatch over the stairs, an older house with purlins in the way, and a modern detached on the edge of the village are three different jobs. A hatch on a landing you can stand a ladder under is one job. A hatch over a stairwell, a crawl space you can only move through on your knees, or a loft full of boarding that has to come up and go back, is time before any material is laid.
What is up there now, and what it is sitting on. Old material that has to come out, be bagged and taken away is a cost before anything new goes down, and so is a loft full of boxes that has to be emptied and put back. Joists at 400 centres with a flat run across them is a different afternoon from a trussed roof full of bracing.
Ventilation, and the edges nobody reaches. Insulation stops at the wall plate and the eaves have to stay clear, or you trade a warm bedroom for a wet roof. Getting depth right into the corners and around the hatch, boxing over downlighters and lagging anything that now sits in the cold, is most of the labour. Approved Document L sets what the work is expected to reach.
Comparing quotes? Ask what depth is actually being laid and in how many layers, whether the old material is coming out or being covered over, whether the eaves are being kept clear, what happens to anything you store up there, and whether the hatch and the pipework are included. Two quotes for the same job are usually two different jobs.
If the loft is wet
Water running off the felt, or mould on the underside
Ring rather than use the form. Droplets on the underside of the felt, black mould spreading across the roof timbers, or insulation that is visibly damp are all telling you the same thing: warm wet air is getting into a space that cannot breathe. That does not wait, because it is the timbers that pay for it. We look before anything is added, because putting more insulation into a loft that cannot ventilate makes it worse. Iwerne Minster is a longer run for us, so say when you ring if the loft is actually wet and somebody comes out ahead of the survey list. The phone is answered 24 hours for emergencies; scheduled work runs Monday to Friday, 8am to 6pm.
Old houses
An unfelted roof has been ventilating itself for a century
A good share of the village went up before the First World War, and a roof of that age was built with nothing under the tiles. Air moves through it constantly, in past the verge, up over the wall plate, out at the ridge. That is why an old loft is usually bone dry even when it is filthy, and why nobody there has ever had to think about ventilation.
Depth changes the arrangement. Cover the ceiling properly and the loft runs colder, cold air gives up its moisture sooner, and anything that has narrowed the air path since starts to count. A re-covering with sealed underlay. Soffits boxed in. A verge pointed up solid. So on a house of this age we find out where the air comes from before settling on a depth, and if the roof can no longer clear what it is being given we say so and price the ventilation with it.
Who you are dealing with
A local firm you can check
We cover Iwerne Minster, Fontmell Magna, Child Okeford, Shillingstone, Blandford Forum and the DT11 addresses around them, with Dorset Council for planning and building control. You are dealing with Bournemouth Roofing & Building, the trading name of Bournemouth Roofing & Building Ltd, registered in England and Wales, company number 15471719, which you can look up in a minute. Thomas Hannen's business, and he is the one who comes out to price the job, not a salesman. A verified customer's 10 out of 10 on Checkatrade. The visit and the written quote are both free.
Questions
Questions we hear in Iwerne Minster
There is nothing under our tiles. Should we felt the roof first?
No, and you would be making the job harder. A roof with no underlay ventilates freely, which is exactly what a newly insulated loft wants. What it does mean is wind moving over the material, so the layer is cut to fit and closed off at the perimeter rather than left loose to lift. Felting an old roof to make the house warmer is how people end up with wet rafter feet.
Can we still use the loft for storage afterwards?
Yes, on a platform rather than on the ceiling. Boards screwed straight down squash the second layer flat and you lose most of the depth you paid for, so they go up on loft legs and sit clear of the wool. In a house of this age we look at what the joists will carry before anything is loaded, and a small deck by the hatch is usually more use than boarding the whole floor.
Our roof is already a room. Is that the same job?
No. Once there are sloping ceilings, dormer cheeks and cupboards behind the knee walls, the insulation follows the rafters rather than the floor, and that is a warm roof build up: rigid board cut tight between the rafters with an air gap kept above it, a second layer under them, and taped joints so vapour cannot get behind. It is a bigger job than a cold loft floor and it takes longer, which is why we look before we price.
How long are you in the house?
A day for most lofts. Longer where old material has to be bagged and carried out, or where the roof drops into a crawl at one end. We work off boards, sheet the landing and the stairs, and the waste leaves with us the same day rather than sitting in bags by the back door. Heat loss through the ceiling is the largest single leak in a house of this age, so the difference lands on the heating bill and on the EPC quicker than anything else you could spend the money on. Insulation in a home is also treated differently for VAT, and HMRC Notice 708/6 is the place to check where you stand.
Nearby, and next door
Loft insulation near Iwerne Minster
Loft insulation nearby
Our other trades in Iwerne Minster
Everything we do in Blandford Forum Loft insulation, all areas Every area we cover
Free quote
Get a price for your Iwerne Minster loft
Tell us the address and what the house does in winter. We will get in the loft, look at the structure as well as the material, and put an itemised price in writing. No charge, no obligation.
