Patios in Iwerne Minster

Terraces built against garden walls that were there long before the paving, and are worth keeping that way.

The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.

A large share of Iwerne Minster predates 1900, and the gardens came with the houses: old brick and flint walls, changes of level, and boundaries that are a good deal older than anything you would lay against them. That is what makes a patio here an edges job as much as a paving one.

It shows in what people ring about. A terrace that has pushed out at its open edge and dropped. Slabs settling where they meet a wall that has no proper footing. A level change managed with a couple of railway sleepers that have finally gone. And jointing washed out along the wall line where the water always runs.

We come out, lift a slab, look at what the wall is actually standing on and take levels off the house before we price a thing. Then it comes back as one written itemised quote with the dig, the muck away, the sub base, the paving, the retaining and steps, and the jointing each on its own line. The site visit and the quote are free.

The work

Retaining, steps and paving that respects a wall

Porcelain patio slabs laid to a fall with a gravel border alongside
Laid to a fallWater goes away from the house, not along the wall.

Edges are structure, not trim. A patio with nothing holding it in will spread at the open side and the joints will open with it. Edging is bedded and haunched in concrete, a coping caps a low retaining wall, and a kerb line separates paving from lawn. On a plot that steps, the retaining is designed first and the paving follows it.

Working next to an old wall. A nineteenth century garden wall often sits on very little, so we do not dig a deep formation tight against its base and hope. The excavation is kept back or stepped, we do not bed paving hard into the fabric, and a gravel border between the wall and the slabs keeps splash off soft brick and flint while giving the falls somewhere to shed.

The dig. Old concrete, sunken flags, brick paviours, a raised bed built off the wall, roots and made ground come out first. We excavate to firm formation and the spoil is loaded to a grab lorry or a skip and leaves with us.

The sub base. Geotextile separator over soft ground, then MOT Type 1 in compacted layers of about 100mm rather than one deep lift given a single pass. That is the difference between a terrace that stays flat and one rocking within a few winters.

Porcelain and stone. Calibrated twenty millimetre porcelain is dense, takes almost no water and in a riven finish sits comfortably beside old brick. It goes on a full bed of mortar over a slurry primed back, never dabs. Sandstone is warm and forgiving but porous and greens in shade; limestone is quieter and marks with iron; granite is the hardest and the least likely to move; travertine is a poor choice for a Dorset winter. Hand cut stone varies in thickness so the bed levels it, calibrated stone is sawn to one depth.

Falls, levels and the damp course. The paving falls away from the building and finishes two courses below the DPC where the garden allows, as Approved Document C sets out. Water goes to a gully proved to run, a soakaway where the ground takes it, or a permeable build so the runoff stays on your own ground.

Jointing. Stone is hand pointed in a mortar matched to it, or given a brush in compound worked into a full joint; porcelain takes a grout made for dense units. Along a wall line, where the water concentrates, a short joint is always the first thing to go.

Repairs. Rebuilding a failed retaining edge, re-bedding rocking slabs, replacing cracked units, renewing washed out jointing and correcting falls on a terrace that ponds.

How it runs

From your call to a written price

A finished porcelain patio in the wet, showing how the surface drains and where the joints sit
Judged in the wetRain shows the falls and the joints that a dry day hides.

Same team from first visit to last, one person to ring, and no sub-contracting your work out to somebody you have never met. The quote is itemised, not a figure on the back of a card: excavation and muck away, the sub base, the falls and where water goes, edgings and steps, the slabs themselves, and jointing on separate lines, so you can compare it properly against anyone else's.

Nothing is left open or unusable overnight. The site is swept at the end of each day rather than the end of the job, and what comes out leaves with us. If something turns up once we start that nobody could have seen, you get a photograph and a price before we carry on.

Iwerne Minster has its own conservation area and around forty listed entries in the parish, so a boundary wall taken down or rebuilt, anything visible from the road, and work to trees are separate questions from a terrace behind the house. Dorset Council keeps the record of what is designated and the Planning Portal covers walls and gates.

Cost

What decides the price of a patio

No rate per square metre, because the slabs are the part you choose and the smallest part of the price.

Getting to it. A cottage on the village street with a walled yard, a house on a sloping plot needing two levels, and a bungalow with an open drive are three different jobs before a slab is ordered. Everything comes in and goes out through the garden, often through a side gate or the house. A patio you can barrow to directly is a different job from one where every slab is carried. The work at height rules still apply to the dig and the machinery.

What is coming out before anything goes down. An old concrete slab, a raised bed, tree roots or made ground all have to be dug out and taken away, and that is priced by the load rather than by the metre. The dig is where a patio quote is won or lost.

Falls, levels and the damp course. A patio has to fall away from the house and finish at least two courses below the damp proof course, and getting that right often means steps, a retaining edge or a drainage channel. Laying a new patio up against a wall at the wrong level is the single most expensive mistake on this kind of job.

Comparing quotes? Ask how deep the dig goes and what sub base is specified, whether the slabs are laid on a full wet bed or on dabs, what the falls are and where the water goes, whether edgings and steps are included, and what the jointing compound is. Two quotes for the same job are usually two different jobs.

If it has become a hazard

A patio that has lifted, sunk or turned slippery

Ring rather than use the form. A slab that has lifted at one corner or a step that has dropped is a trip, and a north facing patio in winter can be genuinely dangerous. We can usually lift and re-lay the worst of it quickly, then look properly at whether the base under the rest has gone. If a retaining edge or a sleeper wall has started to lean, ring rather than wait, because what is behind it keeps pushing. The phone is answered 24 hours for emergencies; scheduled work runs Monday to Friday, 8am to 6pm.

Call now: 07435 839745

Worth knowing

The old boundary wall is the constraint and the asset

The garden walls in this village are frequently the oldest thing on the plot, built in brick and flint with a lime mortar and very often standing on a shallow footing or none at all. They are also what makes the gardens look the way they do, and they are far more expensive to rebuild than to work around.

For a patio that has two consequences. A deep excavation right against the base of an old wall takes away the ground supporting it, and walls have come down that way. And bedding paving hard against the brickwork traps water at the base of a wall that was built to dry out through its face, which brings on the frost damage and the crumbling mortar you can see on plenty of them already.

So we design the patio to stop short of the wall. The excavation is stepped or held back, a stone margin or a narrow border sits between the slabs and the brickwork, and where a level change is wanted the retaining is built as its own structure rather than leaning the load onto something Victorian. Where a wall is shared with a neighbour, the party wall rules are worth reading before work starts. It costs a little more in setting out and it saves the wall.

Who you are dealing with

A local firm you can check

We cover Iwerne Minster, Fontmell Magna, Child Okeford and the villages north of Blandford, broadly DT11, under Dorset Council. You are dealing with Bournemouth Roofing & Building, the trading name of Bournemouth Roofing & Building Ltd, registered in England and Wales, company number 15471719, which you can look up in a minute. Thomas Hannen's business, and he is the one who comes out to price the job, not a salesman. A verified customer's 10 out of 10 on Checkatrade. The visit and the written quote are both free.

Questions

Iwerne Minster questions we get asked

Should the slabs finish tight to a flint boundary wall?

Better not to. A margin of gravel or stone between the paving and the brickwork keeps splash off the wall, lets it dry through its face and gives the falls somewhere to shed.

Is digging next to an old wall risky?

It can be, because many of them sit on almost no footing. We step the excavation back from the base rather than digging a trench along it.

What holds the open side of a patio in?

A haunched edging, a kerb line or a coped retaining wall, depending on the level change. Without one the outer course walks outwards and the joints open behind it.

Do sleepers work as a retaining edge?

For a low change and a few years, yes. They rot at the bottom where they hold water, and once they lean the paving behind them drops. A built edge lasts far longer.

Can we split the garden into two levels?

Usually yes, and on a sloping plot it works better than one big terrace. It needs the retaining and the steps set out before any paving is ordered.

Free quote

Get the edges and levels designed before the paving

Thomas comes out, looks at the walls, the levels and the ground, and prices the whole job in writing. The visit and the quote are free.