Wall insulation in Stourpaine, without spoiling the wall

What can go into a Stourpaine wall depends on what the wall is made of and on whether the outside of it is yours to change.

The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.

Two things decide a wall insulation job in this village. What the wall is built of, which a borescope settles in ten minutes, and whether the outside face can be altered at all, which the conservation area boundary settles for you. Get those the right way round and the rest is straightforward.

The calls are usually a cold gable, a bedroom that grows mould in the same corner every February, or somebody who has been offered cavity fill on a house that turns out not to have a cavity.

So the first visit is a survey rather than a sales call. We measure the reveals, tap the wall, put a camera through one drilled hole and take readings where the wall meets the floor. What comes back is a written itemised quote: survey, system and thickness, the junction work, ventilation, making good. Both the visit and the quote are free.

What we fit

Filling a cavity, lining a room, or leaving it alone

Mineral wool insulation being fitted between studs against a wall
Into the wall, not onto itWhat goes in has to suit the wall behind it.

The survey that has to come first. A borescope through a single hole in a mortar joint tells us whether there is a cavity, how wide it is, whether it is clean, dry and clear, and whether anything has already gone into it. Everything after that follows from what the camera shows, and no quote should be written without it.

Cavity fill. Where the cavity is sound the wall is drilled on a pattern, the material blown in and the holes made good. Bonded bead is the safer choice on an older brick and block wall or a narrow gap, because it flows and it stays put. Blown mineral wool is fine in a clean, wide, sheltered cavity. Most houses are one day, all from outside, and it is the shortest payback of anything on this page. Part L sets what the finished wall is expected to reach.

Walls that should stay empty. If the camera finds a wet cavity, mortar bridging the gap, rubble in the bottom or no cavity trays over the windows, filling it is the wrong move. The fill carries water across to the inner leaf and you buy a damp problem in exchange for a small saving on heat loss.

Solid walls, which is most of the older village. A nine inch brick wall or a flint and rubble wall has nothing to fill and has to be insulated on one face or the other. It also has to be dry first, so gutters, ground levels and open joints get sorted before any insulation goes anywhere near it.

Internal wall insulation. Either insulated plasterboard on dabs where the wall is flat and modern, or boards on a treated batten and stud frame where it is not. PIR gives the most thermal performance per millimetre; wood fibre finished in lime gives less but lets an old wall keep drying. Joints taped, the vapour control layer continuous, the electrics brought forward.

External wall insulation. Insulation fixed to the outside, mesh and basecoat over it, then a silicone topcoat or a render carrier and a finish chosen to sit right on the building. It deals with the cold bridge at the joist ends and the eaves in a way an internal lining cannot, which is why it is worth asking about even where the answer turns out to be no.

The awkward edges. Reveals, thresholds, the floor junction and any party wall are where the labour goes and where a cheap quote goes quiet. A reveal too narrow for a normal board takes a thin aerogel laminate instead. Get those wrong and the condensation simply moves to the coldest strip you left behind.

Air, and old fill. A tighter house needs trickle vents, working extract fans and air bricks that are not blocked, to the rates in Approved Document F. Where a previous fill has slumped, or the cavity is wet, we extract it, dry the wall and give an honest view on refilling.

How it runs

From your call to a written price

Insulated plasterboard lining taped and jointed ready for skimming
Taped and sealedThe joints and junctions are where the heat actually goes.

Same team from first visit to last, one person to ring, and no sub-contracting your work out to somebody you have never met. The quote is itemised, not a figure on the back of a card: the survey and any borescope check, the system and its thickness, making good around windows and doors, ventilation works, and disposal on separate lines, so you can compare it properly against anyone else's.

Nothing is left open or unusable overnight. The site is swept at the end of each day rather than the end of the job, and what comes out leaves with us. If something turns up once we start that nobody could have seen, you get a photograph and a price before we carry on.

Insulation on the inside of a wall is not development, as the Planning Portal's insulation guidance sets out, and that holds inside the conservation area as well. Cladding or rendering over the outside is a different question here, and Dorset Council keeps the record of what is designated. Regulation 23 brings the whole wall up to the current standard once you renovate more than half of it, so building control has a say even where planning does not.

Cost

What decides the price of a wall insulation job

No rate per square metre, because the wall area is the easy part; what happens at every window, door and floor junction is not.

Getting to it. A flint and brick cottage in the old village, a bungalow on the newer end and a farmhouse with thick walls and deep reveals are three different jobs before anybody opens a brochure. Cavity fill is drilled from outside and a bungalow comes off a tower where a three storey gable wants a scaffold. Internal lining is worked room by room from inside, so it is your rooms rather than a platform that gets disrupted. The work at height rules still set the platform.

Which wall you actually have. A cavity that is clear and dry can be filled in a day. A solid wall cannot be filled at all, and has to be lined inside or insulated outside, which is a different job at a different price. A borescope through one drilled hole settles it, and no honest quote is written before that.

The junctions, not the field of the wall. Reveals at windows and doors, the floor junction, the eaves and any party wall are where heat escapes and where condensation shows up if the detailing is wrong. That work is slow, it is most of the labour, and it is the first thing a cheap quote leaves out.

Comparing quotes? Ask whether the wall has actually been checked with a borescope or just assumed, what system and what thickness is specified, how the reveals and floor junction are being detailed, whether ventilation is being addressed, and who makes good the plaster and decoration afterwards. Two quotes for the same job are usually two different jobs.

If damp has appeared

Damp or mould after a wall was insulated

Ring rather than use the form. Damp patches or black mould appearing on an outside wall after cavity fill or internal lining usually means water is tracking across the cavity, or warm air is reaching a cold surface at a junction. We look before we take anything out, because the fix depends on which of those it is. Say when the damp first showed and whether anything was done to the wall in the year before it, because that usually points straight at the cause. The phone is answered 24 hours for emergencies; scheduled work runs Monday to Friday, 8am to 6pm.

Call now: 07435 839745

Local

In the conservation area, the outside face is not yours alone

Stourpaine has its own conservation area, and it changes one wall decision in particular. Inside the boundary, appearance is controlled: replacing render like for like is maintenance, but adding 70 or 100mm of insulation and a new finish over the front of a house is a change of material and of proportion, and it needs an application. Dorset Council holds the designation records and will tell you whether your address is in it.

It is not a blanket no. External wall insulation on a rear elevation that nobody sees from the lane is a very different application from one on a flint frontage, and we have found the conservation officer far more interested in what the finish looks like and how deep the reveals end up than in the insulation itself. The killers are usually the eaves overhang, the window reveals going from crisp to clumsy, and a plastic looking topcoat on a village street of lime and flint.

Where the outside is off the table, the work goes inside, and then breathability matters more than it would on a modern house. That points at wood fibre and lime rather than a foil faced board, and at doing the coldest rooms properly instead of every room thinly.

Who you are dealing with

A local firm you can check

We cover Stourpaine, Durweston, Pimperne and the villages along the Stour towards Blandford Forum, broadly DT11, under Dorset Council. You are dealing with Bournemouth Roofing & Building, the trading name of Bournemouth Roofing & Building Ltd, registered in England and Wales, company number 15471719, which you can look up in a minute. Thomas Hannen's business, and he is the one who comes out to price the job, not a salesman. A verified customer's 10 out of 10 on Checkatrade. The visit and the written quote are both free.

Questions

Stourpaine questions we get asked

Do I need permission to insulate a wall in the conservation area?

Not for internal work. Anything that changes the outside face, including external wall insulation and a new render over it, needs an application, and the council will tell you if you are inside the boundary.

Is external insulation better than lining the inside?

Thermally, usually yes, because it wraps the joist ends and the eaves that an internal lining leaves cold. Practically it depends on whether you are allowed to change how the house looks.

Can you insulate just one cold room?

Yes, and it is often the sensible way to spend the money. The one thing to watch is the junction where the insulated wall meets the uninsulated one, because that corner becomes the cold spot.

What thickness of insulation should I be asking for?

Enough to move the dew point out of the wall rather than a number for its own sake. On an internal lining that is usually between 50 and 100mm, and the reveal often sets the limit rather than the U value on the brochure or the letter your EPC came with.

Will a lime and wood fibre lining really keep a room warmer?

It gives a lower thermal performance per millimetre than rigid foam, so it goes on thicker. On an old wall that trade is worth making, because a wall that can dry stays warmer than a wet one.

Free quote

Ask what your wall will actually take

Thomas comes out, surveys the wall, checks where you stand on the outside face and prices it in writing. The visit and the quote are free.