Roofing in Fordingbridge

Slate and tile repairs, re-slating, strip and re-cover, flat and communal roofs, leadwork and gutters across Fordingbridge and the SP6 villages.

The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.

Fordingbridge is two roofing towns in one. The old streets are natural slate and plain clay tile with listed buildings mixed in among them. The estates round the edge are concrete interlocking tile on post-war battens. Which of the two you live in decides nearly everything about the job.

The calls from here are usually one of three. A slate on the pavement. A ceiling stained under a valley or beside a chimney breast. Or a block of flats with a communal roof that has been patched for years, and somebody has finally asked what it would take to do properly.

We are fifteen miles up the valley, so Fordingbridge work is booked as a planned job rather than squeezed into the end of a day, and we say so when you ring. How we look at it does not change. We survey the covering from above and the timbers from inside, photograph everything, and put it in writing. Site visit and written quote both free.

The work

Old town slate, estate concrete, and a lot of flats

Hipped roof part way through a re-tile with breathable membrane and new treated battens
Membrane and battensThe part nobody sees, and the part that decides how long it lasts.

Slate, and why it slips. A natural slate roof in the old streets nearly always fails from the nail up rather than the slate down. The slate outlives everyone, the nail rusts through, and slates start sliding off one at a time for no reason you can see from the ground. Underneath there is usually torching and no sarking board, so the loft tells you more than the roof does. Small numbers we re-hook. Once it is happening everywhere the covering comes off, the sound slates are set aside and re-laid, and matched secondhand slate makes up the shortfall. Stone slate belongs over in Purbeck and you will not find it here. Nearly a fifth of the housing predates 1919 and carries peg and nib clay tile as well, where the faults are broken nibs, a lost bedding at the verge, and a valley somebody has cemented over in a hurry. We re-lay rather than replace wherever the tile is sound.

Four in ten dwellings went up between 1945 and 1982, peaking in the 1970s and early 1980s, and that stock is concrete tile, most of it interlocking. On interlocking concrete the tile outlives the fixing that holds it down, so the fault is a nail, a clip or a junction rather than the covering. Mortar bedding at ridge, hips and verges cracks, the tiles begin to rock and the next gale takes one, so we strip it and convert to dry ridge and dry verge screwed onto a vented roll, the mechanical fixing BS 5534 expects. When the nails have gone, the batten ends have softened and the underlay tears as soon as it is touched, the covering comes off, soft rafter feet are replaced, and it goes back on breathable membrane and treated battens with a matched tile.

Flats, and who can instruct the job. A sixth of the dwellings here are flats, and the roof over them is usually felt, GRP fibreglass or EPDM rubber over a deck nobody has looked at in twenty years. We look at the deck first, then the falls, the upstands and the outlet. Where a freeholder or managing agent is paying, the quote is itemised in the form the leaseholders will be shown, and major works on a block engage the consultation section 20 of the Landlord and Tenant Act 1985 requires. In the old streets the valley between two houses is the commonest source of a wet bedroom ceiling, and that goes back in code rated lead. With the covering off, insulation and eaves ventilation are far cheaper to sort, and Approved Document L sets the standard a renovated roof is expected to reach.

How it runs

From your call to a written price

The quote is itemised line by line: scaffold, strip out, battens and membrane, covering, each junction and disposal, so you can hold it against anyone else's. Fordingbridge carries forty-nine listed entries, most of them in the old streets, and on a listed building you need consent before anything comes off, whatever is going back on, so we check the address against the council's records before we price. On an unlisted house a like for like re-cover, a repair, new rainwater goods and rooflights sit inside ordinary householder permitted development, with no application and no building control sign-off, as long as nothing stands more than 150mm above the roof plane, and Planning Portal guidance sets out the limits. New Forest District Council either way.

Cost

What decides the price of a roof

GRP flat roof with three rooflights, formed upstands and a fall running to the outlet
A flat roof in GRPRooflights set in, upstands formed, falls running to the outlet.

Access varies more here than anywhere else on our patch. A house on an estate has a drive and room for a scaffold. A terrace in the old streets often has no side access at all, so the platform goes up from the front and may need a licence before it can stand on the pavement. How long it stands matters as much as its size, and the work at height rules are why it is a line of its own. Ask any quote whether the scaffold is in it, whether battens and membrane are renewed, and who takes the old tiles away.

If it is leaking now

Water coming in today

Finished flat profile tiled roof seen along the slope from the scaffold, with new fascia and gutter
The finished coveringClean courses, new fascia and the gutter running true.

Ring rather than use the form. Anything letting water in goes to the front of the queue, and the first visit makes it safe and watertight. Look from the ground for a slate on the path or a gutter running over the front, because one slipped slate usually means the nails have gone. Do not go up a ladder. The phone is answered 24 hours for emergencies; scheduled work runs Monday to Friday, 8am to 6pm.

Call now: 07435 839745

Worth knowing

If the roof is really step one of a loft conversion

Newly re-covered hipped roof with clear tile laps and gutters
A finished re-coverClear laps, clean verges, gutters running as they should.

Fordingbridge sits in the River Avon catchment, and the catchment is under nutrient neutrality rules. For the roof itself that is irrelevant. Re-covering, repairs, leadwork and new rainwater goods add nothing to the river and need no mitigation whatever.

It matters the moment the roof job is really the first move in a loft conversion. The rules bite on anything adding overnight accommodation, and in this catchment an extra bedroom in an existing house can be caught, which means mitigation bought and evidenced before the application is decided. That is money and months.

So if a loft room is anywhere in your thinking, say so at the site visit. It changes the order of the work rather than the roof. Rafter depth, where the insulation line sits, where a dormer or rooflight would go and how the room is ventilated are all far cheaper to build in while the covering is off than to retrofit after the scaffold has gone.

Who you are dealing with

A local firm you can check

About fifteen miles from us, covering Fordingbridge, Sandleheath, Breamore and the SP6 addresses up the Avon valley, with New Forest District Council for planning and building control. Bournemouth Roofing & Building Ltd, registered in England and Wales, company number 15471719, which you can look up in a minute. Thomas Hannen's business, and he is the one who comes out to price the job, not a salesman. A verified customer's 10 out of 10 on Checkatrade. The visit and the written quote are both free.

Questions

Fordingbridge questions we get asked

Are we inside the New Forest National Park boundary here?

No, and that changes who you deal with. Planning in Fordingbridge sits with the New Forest local planning authority rather than the National Park authority, so the Park's design controls are not what applies to your house. The town has no conservation area of its own either. Between them that means a like for like re-cover on an unlisted house counts as maintenance and needs no application. The 49 listed entries in the town are the exception, and those need consent first.

My house went up in the 1970s. What fails first?

The felt under the tiles, usually, and the mortar at the ridge and verge. Fordingbridge is 41.2 per cent 1945 to 1982 stock, with the 1970s and early 1980s the single biggest slice at 16.5 per cent, so a great deal of the town is still on its original underlay. It tears at the eaves first and water then runs behind the fascia instead of into the gutter. We look under the bottom course before pricing anything.

We want a loft conversion. Does the River Avon affect it?

It can, and only because a conversion adds a bedroom. Schemes that create overnight accommodation in the River Avon catchment have to settle nutrient neutrality before they get consent, and that is a planning matter rather than a roofing one. Putting a new covering on the roof you already have adds no bedroom at all, so nothing is triggered. Worth being clear which of the two jobs you are asking us to price.

What can I check from the ground before ringing you?

Stand on the far side of the road and look along the ridge line for a dip or a gap in the bedding. Then look at the verge at each gable end, because that is where mortar goes first. Rust marks running down a tile, a slipped tile sitting on the one below, or moss dammed up at the eaves are all worth photographing. Send those over and Thomas can tell you what he needs to see on site.

Will you take the roof off in winter?

Only as much of it as we can make watertight before we leave that day. On a strip and re-cover we open one elevation, felt and batten it, then sheet down whatever is left. Winter work is normal, wet work is not. Bedding mortar will not go off properly in a hard frost, so ridge and verge bedding gets moved to a dry spell while the stripping and felting carry on regardless.

Free quote

Get your Fordingbridge roof priced in writing

A free site visit, a look in the loft as well as on the roof, and an itemised written quote with every line shown separately.