Patios in Lyndhurst, shade, algae and slip

Under mature Forest trees a terrace barely dries out from October to March, and that decides the surface long before anyone picks a colour.

The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.

Most gardens in Lyndhurst have mature oak, holly or beech on one side of them, and a patio under that canopy sees very little direct sun from October to March. It stays damp, it collects leaf litter, and by midwinter the surface can be genuinely dangerous. That is a specification problem, not a cleaning problem.

The three calls. A north facing terrace that is green and greasy every winter. Joints that have filled with rotted leaf and now grow moss out of them. And slabs that have started to rock, because water has been sitting in a hollow bed rather than running off.

We come out, look at how much sun the area actually gets and where the water sits, and lift a slab to see what it was laid on. You get a written itemised quote with the dig, the muck away, the sub base, the drainage, the edgings, the slabs and the jointing on separate lines. The visit and the quote are free.

What we get called to

A terrace that never sees the sun

Porcelain patio slabs laid to a fall with a gravel border alongside
Laid to a fallWater goes away from the house, not along the wall.

Stripping it out. Old paving, the bedding under it and any old concrete are broken out and excavated to a firm formation. In these gardens there is nearly always a layer of leaf mould and soft made ground under the slabs, and that has to go too. Roots, spoil and rubble leave by the load.

The sub base. MOT Type 1 whacked in thin lifts to full compaction and carried past the edge of the paving, with a geotextile separator underneath on soft ground. In a shaded garden the base never really dries out, so getting the compaction right the first time is the difference between a flat terrace and a rocking one.

Full bed and primer, not dabs. Slabs are bedded on a full wet mortar bed with a slurry primer on the back. A dabbed slab in a shaded garden holds standing water under it permanently, and permanently wet mortar has no strength left in it after a few frosts.

Grip is the first thing we choose for. Textured porcelain is the obvious answer on a north facing terrace: calibrated, non porous, and the grip is in the surface rather than in the stone being dry. Flamed granite is excellent too. Riven sandstone has natural texture but is porous and greens over. Limestone and travertine both hold moisture and we would steer you away from them here.

Falls, levels and the damp course. Paving falls away from the house and stops at least two courses below the DPC, and on the older properties here, where nearly four in ten homes predate 1919, there may be no proper damp course to work from at all. In that case the level comes off the floor inside. Approved Document C explains why.

Shifting water and leaves. A shaded terrace needs a slightly stronger fall than an open one, because the sun is not going to help. Water goes to a channel with a gully and an outfall, or to a soakaway where the ground will take the runoff, and any grating is chosen so leaf litter can be swept off it rather than packing into it.

Edges, steps and retaining. A haunched edging or kerb where the paving meets grass or a border, a retaining edge and coping where the ground is held back, and steps set out with equal risers. Under a canopy the step nosings are the part people slip on, so they get the grippiest finish on the job.

Jointing. A brush in resin compound worked in wet and tooled off. Open joints in a shaded garden fill with rotting leaf, and that is a seed bed for moss and algae. Mortar pointing still suits an old stone terrace. Then the usual repairs: lifted slabs, a sunk corner, rocking paving, cracked stone, efflorescence on new sandstone and staining under the drip line.

How it runs

From your call to a written price

A finished porcelain patio in the wet, showing how the surface drains and where the joints sit
Judged in the wetRain shows the falls and the joints that a dry day hides.

Same team from first visit to last, one person to ring, and no sub-contracting your work out to somebody you have never met. The quote is itemised, not a figure on the back of a card: excavation and muck away, the sub base, the falls and where water goes, edgings and steps, the slabs themselves, and jointing on separate lines, so you can compare it properly against anyone else's.

Nothing is left open or unusable overnight. The site is swept at the end of each day rather than the end of the job, and what comes out leaves with us. If something turns up once we start that nobody could have seen, you get a photograph and a price before we carry on.

The village is a conservation area inside the National Park, with 31 listed entries in it, so appearance is controlled in a way it is not further out. Paving a back garden at ground level is still normally permitted development and needs no planning permission, and building control only applies where a retaining structure is involved. The park authority keeps the heritage and conservation guidance.

Cost

What decides the price of a patio

No rate per square metre, because the slabs are the part you choose and the smallest part of the price.

Getting to it. A Victorian villa with a long side path, a cottage on the High Street with no rear access, and a detached house with a gated drive are three different jobs. Everything comes in and goes out through the garden, often through a side gate or the house. A patio you can barrow to directly is a different job from one where every slab is carried. The work at height rules still apply to the dig and the machinery.

What is coming out before anything goes down. An old concrete slab, a raised bed, tree roots or made ground all have to be dug out and taken away, and that is priced by the load rather than by the metre. The dig is where a patio quote is won or lost.

Falls, levels and the damp course. A patio has to fall away from the house and finish at least two courses below the damp proof course, and getting that right often means steps, a retaining edge or a drainage channel. Laying a new patio up against a wall at the wrong level is the single most expensive mistake on this kind of job.

Comparing quotes? Ask how deep the dig goes and what sub base is specified, whether the slabs are laid on a full wet bed or on dabs, what the falls are and where the water goes, whether edgings and steps are included, and what the jointing compound is. Two quotes for the same job are usually two different jobs.

If it has become a hazard

A patio that has lifted, sunk or turned slippery

Ring rather than use the form. A slab that has lifted at one corner or a step that has dropped is a trip, and a north facing patio in winter can be genuinely dangerous. We can usually lift and re-lay the worst of it quickly, then look properly at whether the base under the rest has gone. A terrace that has gone greasy under a canopy is worth ringing about before the first frost rather than after somebody has slipped on it. The phone is answered 24 hours for emergencies; scheduled work runs Monday to Friday, 8am to 6pm.

Call now: 07435 839745

Worth knowing

Slip resistance on a north facing patio

A terrace that faces north, or sits under mature Forest trees, gets almost no drying sun between October and March. Water that lands on it stays there far longer, leaf litter blows on and rots down into the joints, and algae has everything it needs. The film that forms is what people slip on. The stone underneath is usually perfectly sound.

Cleaning it is only ever half an answer, because the conditions that grew it are still there in six months. Pressure washing a porous stone also opens the surface up and gives the next crop somewhere better to take hold, and blasting the jointing out of a terrace is how a lot of rocking slabs start their careers.

The real fix is decided before anything is laid. We choose a surface with grip built into it rather than one that is only safe when dry, set a fall strong enough to clear water without help from the sun, joint with a resin compound so there is no open gap for leaf mould to sit in, and give the step nosings the grippiest finish on the terrace. After that, an annual wash off keeps it in hand instead of being a rescue job.

Who you are dealing with

A local firm you can check

We cover Lyndhurst, Emery Down, Bank and the lanes out towards Minstead, broadly SO43, with the New Forest National Park Authority as planning authority. You are dealing with Bournemouth Roofing & Building, the trading name of Bournemouth Roofing & Building Ltd, registered in England and Wales, company number 15471719, which you can look up in a minute. Thomas Hannen's business, and he is the one who comes out to price the job, not a salesman. A verified customer's 10 out of 10 on Checkatrade. The visit and the written quote are both free.

Questions

Lyndhurst questions we get asked

What is the safest surface for a patio that never gets sun?

A textured porcelain or a flamed granite, because the grip is in the surface rather than in the stone being dry. Both shed water instead of absorbing it, so there is less for algae to live on. Smooth or polished finishes are the ones that catch people out.

Should I jet wash the green off every spring?

Sparingly. High pressure opens up a porous stone and gives the next growth a better foothold, and it blasts the jointing out, which is how slabs start rocking. A low pressure wash and a proper treatment does more good than force.

Do the leaves off the trees actually damage the patio?

Rotting leaf in an open joint does. It holds water against the bedding, feeds moss and algae, and blocks a channel grating so the fall stops working. Filled joints and a grating you can sweep are what keep on top of it.

Can steps be made less slippery without replacing them?

Sometimes. The nosings can be cut back and a grippier tread bedded in, or a channel formed so water is not running over them. If the treads themselves are a polished stone, replacing the step is usually the honest answer.

Is it a problem to work in a conservation area inside the National Park?

Not for an ordinary ground level patio in a back garden, which is normally permitted development. Where the work is raised, visible from the road, or attached to a listed building, we flag it at the quote rather than once the dig has started.

Free quote

Get a terrace that is safe in the wet

Thomas comes out, looks at the shade and the falls, lifts a slab and prices the work in writing. The visit and the quote are free.