Loft insulation in Lyndhurst

Full depth over the joists, and the airflow put right at the eaves rather than on the roof.

The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.

Insulation is the quick part of this. On a village of pre-war roofs the question worth asking first is what your roof was built to do with moisture, because that decides how much wool it can safely carry.

People ring here about heat, about age, or about water. Heat is the top floor that never warms up however long the heating runs. Age is the layer somebody rolled out decades ago, now settled thin and stopping short of the walls. Water is staining along the rafters, a musty smell, or beads on the underside of the felt on a cold morning, and that one gets looked at before anything is added to it.

So the survey comes first and it is done from inside the roof rather than from the landing. How deep the existing layer really is, whether it carries over the wall plate, whether the eaves are open, how the roof was built to breathe, and what the ceiling below will carry. Then photographs, and a written quote in which the clearing out, the disposal, the eaves trays, the boarding, the hatch and the depth each carry their own figure. The site visit is free and so is the quote.

What it involves

Loft floors, sloping ceilings, and the difference between them

Mineral wool insulation laid between and over the ceiling joists in a loft
Two layers, crossedThe second layer runs across the joists so the timber stops being a cold bridge.

Start with whether there is a floor at all. Plenty of the larger houses here were divided into flats or had the roof turned into rooms, and in those there is no cold loft to lay anything on. The insulation goes against the roof instead. Rigid board, PIR or Celotex, is cut to a tight fit between the rafters with a clear air gap left above it so the timbers can still dry, a second layer goes under the rafters so the rafters themselves stop being cold bridges, and a taped vapour control layer keeps household moisture out of the build up. Where a sloping ceiling or a dormer cheek has almost no depth to give away, a multi-foil quilt gets something worthwhile into very little space. Seal it up without a way out for the moisture and the damage is interstitial, which is the sort you find years later in the timbers. If you are in a flat, the void above you is often common parts, so the quote is written so it can go to a freeholder or an agent.

Where there is a proper loft, the work is depth. One thickness between the joists, a second cross laid over the joists running the other way so the timber is buried, and the two layers finish at roughly 270mm. Mineral wool, whether it is sold as glass wool or as rockwool, does the open ground. Batts fill the awkward bays, loose fill reaches where a roll will not, and sheep wool is there for anyone who wants it. All of it is aimed at one number, the U value over your ceiling, because that ceiling is where the biggest share of the heat loss goes and it is what you see on the heating bill and on an EPC.

Close to four in ten homes in the village were built before the First World War, and those roofs are cut on site out of rafters and purlins, with head height to work in and very often no underlay whatever behind the tiles or slates. Wind moves through them, which is why material is laid to stay put rather than rolled out and left. The ceilings below are frequently lath and plaster, which will not hold a person, so crawl boards go down first and nobody steps off them. Access is a hatch, so it is work at height from the first rung, and the ladder is set and footed properly.

Then the edges. Insulation finishes on the wall plate and stops there. Vent trays keep the air gap above it open. Cross ventilation then works its way up the slope and out under the ridge, and a ridge vent speeds that up where a roof has been given one. A breathable membrane is kinder to an old roof than bitumen felt underlay ever was. Insulating a ceiling always makes the space above colder and carries the dew point up with it, which is exactly why the air path matters more after the job than before it. Damp material, dark timbers, black mould and water running off the underside of the felt all say the same thing, and none of them is cured by another layer of wool.

Last come the things that live in the loft. The tank and its pipework get lagging. Cables and wiring come up on top of the insulation. Recessed lights and downlighters in the ceiling below take fire rated covers. Old wool that has settled thin, been compressed under a deck, gone patchy, been contaminated with droppings or gone missing at the edges is bagged where it lies and leaves with us. Where the loft is used, the floor is rebuilt above the work rather than on top of it, on legs, with the loft ladder set to the new platform height. The hatch has rigid board fixed to its back and a draught seal fitted round the frame.

How it runs

From your call to a written price

Rigid insulation board fitted between the rafters in a loft
Board where depth is shortRigid board earns its place where the headroom will not take quilt.

Same team from first visit to last, one person to ring, and no sub-contracting your work out to somebody you have never met. The quote is itemised, not a figure on the back of a card: the survey, clearing and bagging whatever is up there now, the material and its depth, keeping the eaves clear, the hatch and any pipework, and disposal on separate lines, so you can compare it properly against anyone else's.

Nothing is left open or unusable overnight. The site is swept at the end of each day rather than the end of the job, and what comes out leaves with us. If something turns up once we start that nobody could have seen, you get a photograph and a price before we carry on.

There is nothing to apply for. Work inside the roof is not development, which Planning Portal guidance on insulation sets out. Lyndhurst has its own conservation area and sits inside the National Park, so permitted development rights are narrower here and the outside of the roof is looked at closely, which National Park heritage and conservation guidance explains. the National Park Authority's interactive property map will tell you what applies at your address. Building control still applies: regulation 23 means renovating more than half of a thermal element brings the whole of it up to the Part L standard. Insulation in a home is treated differently for VAT under HMRC VAT Notice 708/6.

Cost

What decides the price of a loft

A loft insulated at rafter level with the gable filled and a rooflight fitted
At rafter levelA room in the roof is a different job from a cold loft floor.

No rate per square metre, because the floor area is the easy part and the awkward edges are where the time goes.

Getting to it. A Victorian cottage with a hatch over the stairs, a top floor flat in a divided house, and a detached house with a boarded loft full of boxes are three different mornings before any material is opened. A hatch on a landing you can stand a ladder under is one job. A hatch over a stairwell, a crawl space you can only move through on your knees, or a loft full of boarding that has to come up and go back, is time before any material is laid.

What is up there now, and what it is sitting on. Old material that has to come out, be bagged and taken away is a cost before anything new goes down, and so is a loft full of boxes that has to be emptied and put back. Joists at 400 centres with a flat run across them is a different afternoon from a trussed roof full of bracing.

Ventilation, and the edges nobody reaches. Insulation stops at the wall plate and the eaves have to stay clear, or you trade a warm bedroom for a wet roof. Getting depth right into the corners and around the hatch, boxing over downlighters and lagging anything that now sits in the cold, is most of the labour. Approved Document L sets what the work is expected to reach.

Comparing quotes? Ask what depth is actually being laid and in how many layers, whether the old material is coming out or being covered over, whether the eaves are being kept clear, what happens to anything you store up there, and whether the hatch and the pipework are included. Two quotes for the same job are usually two different jobs.

If the loft is wet

Water running off the felt, or mould on the underside

Plasterboard taped and jointed on a lined loft wall
Lined, then tapedWhere the loft becomes a room, the boarding and the joints come next.

Ring rather than use the form. Droplets on the underside of the felt, black mould spreading across the roof timbers, or insulation that is visibly damp are all telling you the same thing: warm wet air is getting into a space that cannot breathe. That does not wait, because it is the timbers that pay for it. We look before anything is added, because putting more insulation into a loft that cannot ventilate makes it worse. Lyndhurst is about seventeen miles from us, so a visit is arranged as a proper look rather than a flying one, and a wet loft is seen before anything is ordered. The phone is answered 24 hours for emergencies; scheduled work runs Monday to Friday, 8am to 6pm.

Call now: 07435 839745

Worth knowing

Ventilating a roof nobody is allowed to alter

Lyndhurst sits in its own conservation area and inside the National Park, and there are a good number of listed entries near here as well. The practical effect on this trade is narrow but real: what goes in the loft is nobody's business but yours, and what shows on the roof is.

That matters because the usual answer to a badly ventilated roof is a vent you can see. Tile vents in a slope, or a ridge vent along the top. On an ordinary house that is a morning's work. On a roof the street can see, in a village where design is looked at closely, it is an application and a wait, and on a listed building it needs consent.

So we work the other way round. Eaves first: get the wall plate clear, vent trays in and the air path open, then look at whether the soffit can be vented, since that is under the overhang and sees nothing from the road. Fans blowing into the loft get ducted out properly. Nine times out of ten that fixes the airflow without anybody applying for anything. Where it genuinely will not, we say so and tell you what the application would involve rather than quietly cutting a hole in a roof that is protected.

Who you are dealing with

A local firm you can check

We cover Lyndhurst, Emery Down, Bank, Minstead and the SO43 addresses around them, with the New Forest National Park Authority for planning and New Forest District Council for building control. You are dealing with Bournemouth Roofing & Building, the trading name of Bournemouth Roofing & Building Ltd, registered in England and Wales, company number 15471719, which you can look up in a minute. Thomas Hannen's business, and he is the one who comes out to price the job, not a salesman. A verified customer's 10 out of 10 on Checkatrade. The visit and the written quote are both free.

Questions

Lyndhurst questions we get asked

Does the National Park Authority have to approve it?

No. Nothing inside a roof counts as development, so nothing needs applying for and none of your permitted development rights are touched. The Authority is the planning body for these addresses rather than the district council, and its interest is anything that alters the outside of a building, such as a vent or a rooflight on a visible slope.

My roof has no felt at all. Can it still be insulated?

Yes, and the loft will breathe better than a modern one. Material is laid and held so the wind cannot lift it, and we look at the eaves and the ridge while we are up there.

There is no loft, only sloping ceilings. What then?

The work moves to the rafters. Rigid board cut between them with an air gap kept clear above, a layer under them so the timbers are covered too, and a taped vapour control layer on the room side.

How deep does the wool finish, and how long does it take?

Around 270mm, in two layers, with the top one crossing the joists so no timber is left proud. A day is normal, and old material to shift or a floor to lift will take it past that.

I am in a flat. Is the roof space mine?

Usually not. In a divided house it generally belongs to the freeholder. We look, say plainly which it is, and set the quote out so it can be handed on.

Free quote

Book a look in the loft

We come out, measure what is up there and put the depth, the ventilation and the hatch in writing. The visit and the quote are free.