Loft insulation in Cadnam and Bartley

Loft floors brought up to depth, sloping ceilings insulated at rafter level, and the eaves left breathing, across Cadnam, Bartley and the SO40 lanes.

The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.

A cold loft is supposed to be cold. The trick is getting enough over the ceiling to keep the heat below it while leaving the roof above free to breathe, and those two things pull against each other right at the eaves.

Why people ring

A thin loft floor, or a roof room that swings

Mineral wool insulation laid between and over the ceiling joists in a loft
Two layers, crossedThe second layer runs across the joists so the timber stops being a cold bridge.

Two kinds of call come off these lanes. One is an ordinary loft with a thin, settled layer, bare timber showing round the edges and bedrooms that say so from October onwards.

The other is a roof converted years ago that behaves like a tent. Freezing in January, unbearable by July. That is nearly always board fitted loose in the bays, or fitted with no air gap left behind it.

Both want a torch and a tape rather than a figure down the phone. We measure what is genuinely there, look along the eaves from the inside, photograph what we find and set it out in a written itemised quote. The survey and the quote are free, and if your ceiling is already right you will hear that.

The work

Over the ceiling, or up against the rafters

Rigid insulation board fitted between the rafters in a loft
Board where depth is shortRigid board earns its place where the headroom will not take quilt.

Over the ceiling, where there is still a loft. Under a cold roof everything goes above the ceiling and the space over it stays cold deliberately. What we usually lift is one settled layer pressed down between the joists with nothing at all on top of them. The fix is a second run of roll turned square to the first and laid across the joists, so the timber ends up covered rather than left proud. Get to about 270mm and the ceiling sits at the u value Approved Document L expects after a renovation. Glass wool roll for the long clear runs, rockwool batts where the spacing is untidy, loose fill in corners the bracing has closed off, sheep wool if you would prefer it.

Up against the rafters, where the roof is a room. Once a loft has become a room the floor under your feet is no longer the surface losing your heat. Sloping ceilings, dormer cheeks and the flat top all want rigid board. PIR such as Celotex is cut tight to each rafter bay with an air gap kept above it, a second layer goes under the rafters to kill the bridge through the timber, and a taped vapour control layer closes the lot so warm air never travels far enough into the build up to find its dew point. Where depth has run out altogether, multi-foil quilt is what fits.

The eaves decide whether either of them works. New material is taken out over the wall plate and stopped there, and a vent tray in every rafter bay holds the gap open above it, so ventilation still runs the width of the roof and the felt stays dry. Old bitumen underlay with the soffits boxed in under it is a choked roof already, and the first sign of that is condensation on the underside of the felt with black mould spreading behind it. Where the eaves cannot be opened back up, a ridge vent goes on first. Approved Document F carries the standard, and what you are avoiding is interstitial condensation, which does its damage where nobody is looking.

The things that get left off other quotes. Recessed lights get a fire rated hood apiece, never wool tucked round the fitting. Wiring comes up out of the layer and is clipped above it, since cable buried in insulation runs warm. The cold water tank and every run of pipework by it are suddenly outside the warm part of the house, so lagging goes on the same day. If the loft carries the suitcases, the boarding comes up and goes back on loft legs high enough to leave the depth uncrushed, and the loft ladder is checked so it still swings under the raised floor. The hatch takes a board on its back and a seal, because an open hatch undoes a good deal of what has just been laid. How we get up there is agreed at the survey, since it is work at height indoors as much as out.

How it runs

From your call to a written price

A loft insulated at rafter level with the gable filled and a rooflight fitted
At rafter levelA room in the roof is a different job from a cold loft floor.

Same team from first visit to last, one person to ring, and no sub-contracting your work out to somebody you have never met. The quote is itemised, not a figure on the back of a card: the survey, clearing and bagging whatever is up there now, the material and its depth, keeping the eaves clear, the hatch and any pipework, and disposal on separate lines, so you can compare it properly against anyone else's.

Nothing is left open or unusable overnight. The site is swept at the end of each day rather than the end of the job, and what comes out leaves with us. If something turns up once we start that nobody could have seen, you get a photograph and a price before we carry on.

Insulation inside a loft is not development and needs no application, which Planning Portal guidance on insulation confirms, so permitted development does not arise. Building control appears where the roof itself is renovated, and regulation 23 then brings the whole element up to current standard. The New Forest National Park Authority is the planning authority here, and National Park heritage and conservation guidance covers the heritage side if yours is one of the older properties.

Cost

What decides the price of a loft

Plasterboard taped and jointed on a lined loft wall
Lined, then tapedWhere the loft becomes a room, the boarding and the joints come next.

No rate per square metre, because the floor area is the easy part and the awkward edges are where the time goes.

Getting to it. A period cottage with the hatch on a half landing, a sixties detached house with a trussed roof, and a chalet with rooms already in the roof are three different jobs. A hatch on a landing you can stand a ladder under is one job. A hatch over a stairwell, a crawl space you can only move through on your knees, or a loft full of boarding that has to come up and go back, is time before any material is laid.

What is up there now, and what it is sitting on. Old material that has to come out, be bagged and taken away is a cost before anything new goes down, and so is a loft full of boxes that has to be emptied and put back. Joists at 400 centres with a flat run across them is a different afternoon from a trussed roof full of bracing.

Ventilation, and the edges nobody reaches. Insulation stops at the wall plate and the eaves have to stay clear, or you trade a warm bedroom for a wet roof. Getting depth right into the corners and around the hatch, boxing over downlighters and lagging anything that now sits in the cold, is most of the labour. Approved Document L sets what the work is expected to reach.

Comparing quotes? Ask what depth is actually being laid and in how many layers, whether the old material is coming out or being covered over, whether the eaves are being kept clear, what happens to anything you store up there, and whether the hatch and the pipework are included. Two quotes for the same job are usually two different jobs.

If the loft is wet

Water running off the felt, or mould on the underside

Ring rather than use the form. Droplets on the underside of the felt, black mould spreading across the roof timbers, or insulation that is visibly damp are all telling you the same thing: warm wet air is getting into a space that cannot breathe. That does not wait, because it is the timbers that pay for it. We look before anything is added, because putting more insulation into a loft that cannot ventilate makes it worse. Cadnam and Bartley are a longer run for us, so say when you ring if the loft is actually wet and we will get somebody out ahead of the ordinary survey list. The phone is answered 24 hours for emergencies; scheduled work runs Monday to Friday, 8am to 6pm.

Call now: 07435 839745

Worth knowing

Inside the National Park, it is what shows that gets looked at

Cadnam and Bartley sit inside the New Forest National Park, and the Authority is the planning authority for every address here. For a loft that changes nothing, as long as the work stays inside it. Material over a ceiling, boards on loft legs, a sealed hatch, rigid board against the rafters: none of it is visible from the lane and none of it needs anybody's permission.

What does get looked at is anything that appears on the outside. A rooflight to make a roof room usable, a dormer, a run of vent tiles across a slope, even a changed eaves detail can be scrutinised here in a way it would not be a few miles down the road. So where a roof genuinely needs more ventilation and it is prominent from the lane, we look at soffit and over fascia vents at eaves level before we look at putting anything through the slope. The National Park Authority's interactive property map will tell you which designations sit on your address, and it is worth a look before you plan anything that changes what the roof looks like.

Who you are dealing with

A local firm you can check

We cover Cadnam, Bartley, Copythorne, Netley Marsh, Ashurst and the SO40 lanes around them, with the New Forest National Park Authority for planning. You are dealing with Bournemouth Roofing & Building, the trading name of Bournemouth Roofing & Building Ltd, registered in England and Wales, company number 15471719, which you can look up in a minute. Thomas Hannen's business, and he is the one who comes out to price the job, not a salesman. A verified customer's 10 out of 10 on Checkatrade. The visit and the written quote are both free.

Questions

Cadnam and Bartley questions we get asked

We have rooms in the roof. Is this even a loft job?

It is the same trade and a different method. Nothing you lay on a floor helps a room in the roof, because the heat is going through the sloping ceilings and the dormer cheeks. Those get rigid board between and under the rafters with an air gap kept above, and the work is done from inside, room by room.

Will insulating the sloping ceilings cause condensation?

Not if the build up is right. The two things that matter are a continuous taped vapour control layer on the warm side, so moist air from the room cannot get into the construction, and a clear ventilated gap between the board and the underlay. Get either wrong and the dew point lands inside the timber, which is exactly the problem you were trying to avoid.

Do we need permission from the National Park?

Not for insulation. Nothing you do inside the roof needs an application, whatever designation sits over the address. It is only when something appears on the outside, a rooflight, a dormer, tile vents, that the Authority has a view, and that is worth checking before you order anything rather than after.

How long does it take, and does it show on the bill?

A cold loft floor is usually half a day to a day. Rafter level work in a roof room is longer because every cut is a fitted one. Heat loss through the roof is the biggest single loss in a house either way, so it shows on the heating bill and on an EPC, and VAT on energy saving materials follows HMRC VAT Notice 708/6.

Free quote

Get a price for your loft in Cadnam or Bartley

Tell us the address and whether it is a loft or a room in the roof. We will come out, look properly, and put an itemised price in writing. No charge, no obligation.