Patios in Corfe Mullen
On a lot of the estate plots here the lawn finishes higher than the back door, so the patio has to be dug down and drained instead of simply paved over.
The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.
Last updated
Most patio trouble in Corfe Mullen comes from a garden that sits higher than the house. Dig the level down, hold the back edge and put the water somewhere, and the paving on top is straightforward.
Corfe Mullen patios that need attention tend to look like this. A square of 1970s concrete flags that has sunk towards the back wall and now holds a puddle. A damp strip of brickwork behind the paving that never dries out. Or somebody with a wide patio door who wants the whole back of the house opened up properly and does not know where to start.
All three come back to level and water rather than to the slabs. We come out to Corfe Mullen, read the ground with a level, work out how much has to be excavated and where the runoff ends up, then put the dig, the base, the edging and the paving on separate lines in a written itemised quote. The site visit and the survey of levels are free.
The work
Patios on ground that falls the wrong way

Reading the ground before anything is ordered. We stand at a Corfe Mullen back door with a level and look uphill, and chalk the DPC on the brickwork before anything else. If the lawn finishes higher than the threshold, this is a drainage job with paving on top. It settles the dig depth, the fall, the edging and whether a channel is needed.
Digging down instead of building up. The tempting fix is to add height to get the paving flat. It is the wrong way round: it pushes the finished level towards the damp proof course and traps water against the wall. We excavate instead, take the spoil away and set the paving two courses below the damp course with a fall running off it.
What comes out. Old concrete flags on a bed of sand, sometimes a slab left by a shed that went years ago, and on the Corfe Mullen estate plots made ground from the build. It is dug to formation and barrowed out through the side gate, priced by the load.
The base. Geotextile membrane, then MOT Type 1 hardcore compacted in layers, a sharp sand screed to level it, and a full bed of mortar under each slab with a slurry primer on the back, not five dabs. A proper mortar bed does not go hollow. Dabs are quicker and they are why a slab starts rocking, sounds hollow underfoot and ends up cracked across the middle.
Choosing the slab. Porcelain is calibrated to a consistent thickness and stays clean in a shaded corner. Indian sandstone is hand cut and warmer to look at. Limestone and granite are harder wearing and darker, and travertine holds water. We bring samples out and lay them down wet, because a dry sample in a showroom tells you little.
Edges, steps and the lawn. Where a Corfe Mullen garden sits above the patio the back edge has to be retained rather than simply butted against soil, or the border ends up on your paving every time it rains. That means a low retaining wall or a haunched kerb with a coping, steps up onto the grass at a rise you can walk in the dark, and a gravel border along the wall to take splashback.
Water, and where it is allowed to go. The fall runs away from the house into an ACO channel across the back of the patio, an existing gully, or a soakaway clear of the foundations. Where the runoff has nowhere to go we build permeable, which is a different sub base rather than a different slab.
Jointing, and the patio you already have. Joints are filled with a brush in resin compound, a grout slurry or pointed by hand in mortar, never loose sand. If your paving has only sunk or lifted in one bay we say so and quote the lift and relay rather than the rebuild. Algae, efflorescence and staining after a wet winter are usually a clean and a re-joint.
How it runs
Laying a patio behind a bungalow or a seventies semi

Thomas comes out and prices the patio himself. Behind a Corfe Mullen bungalow there is usually a wide side path; behind a semi the only way in may be a narrow gate; a detached house may take a mini digger and a skip.
Each line on the quote is separate: digging out and removing spoil, the sub-base, the falls and drainage, edgings and steps, the paving itself and the jointing. Thomas prices the whole patio and is your contact until it is laid.
Lawns and borders along the route through a Corfe Mullen garden are protected with boards, and the dig is never left as an open trench overnight. Spoil and old slabs leave with us, and the garden is tidied every evening. An old drain, a buried concrete base or a tangle of roots is photographed and priced for you before more digging.
Paving a back garden at ground level is ordinarily permitted development, and the government guidance on when permission is required shows where that stops. A back garden is rarely touched by the conservation area that takes in Brogg Street and Sleight Lane, and listing applies to individual buildings, so check the National Heritage List for England if your house might be one. A retaining wall beside a road is covered by the rules on garden walls. Finishing below the damp proof course is a building regulations point, and Approved Document C is where it comes from.
Cost
Levels, falls and the side gate: what a patio costs
We do not work to a rate per square metre. The paving you pick is usually a modest share of the bill; the ground work is the rest.
Getting in. A bungalow with a wide side path, a semi where everything goes through a narrow gate, and a detached house you can get a mini digger onto are three prices for the same area. Carrying every slab adds days, and where the garden steps, the work at height rules cover each open edge.
Clearing the ground. Old concrete, a raised bed or tree roots have to be broken out and carted off, and that is charged by the skip or grab load.
The clay. Corfe Mullen clay moves as it wets and dries, so a good depth of sub-base matters, and the patio has to throw water away from the house, not onto clay against the footings. A channel drain may be part of it.
Levels. The patio should finish two courses below the damp proof course and fall away from the wall. On a plot that slopes, that means steps or a retaining edge.
Questions for anyone else quoting: how deep will they dig, what sub-base goes down, will the slabs sit on a full wet bed or on dabs, are edgings included, where will the rain go, and which jointing compound is used?
If it has become a hazard
A lifted slab by the back door, or a patio holding water
Ring rather than use the form. A corner that has lifted or a step that has sunk will catch someone, and a shaded Corfe Mullen patio gets slippery in winter. Water standing against the back wall needs a look too, because on clay it soaks down beside the footings.
The first visit re-beds the worst slabs and checks whether the base beneath has failed more widely. Patio work is booked Monday to Friday, 8am to 6pm. A busy line just means leave a message, and we will phone when we are free.
Worth knowing
The lawn is often higher than the back door
Nearly two thirds of Corfe Mullen went up between 1945 and 1982, most of it in the 1970s and early eighties, and a lot of it on ground cut and filled to get a level plot. The house sits on the cut. The back garden very often sits above it.
That is why so many patios in Corfe Mullen have the same fault. Water coming off the lawn arrives at the back of the paving, runs along the house wall because there is nowhere else to go, and after a few winters there is a green strip against the brickwork and a slab or two that has dropped. Laying new paving over the old flags makes it worse, because it raises the level and shortens the gap to the damp proof course.
The fix is unglamorous and it works. Dig out rather than build up, hold the back edge with a low retaining wall, put a channel along the top of the patio to catch what comes off the garden, and run the fall away from the house into it. Ask every quoting builder in Corfe Mullen where the water off the lawn ends up.
Who you are dealing with
Your patio priced by the owner, not a salesman
We build patios in Corfe Mullen, around Lockyers and Blandford Road, along Wareham Road and out to Henbury, broadly BH21, under Dorset Council. Boscombe, where we are based, is about eight and a half miles off.
Thomas Hannen owns the firm; he comes to see the garden, checks the levels and prices the patio himself. Bournemouth Roofing & Building Ltd is registered in England and Wales, company number 15471719. A verified Checkatrade customer scored the firm 10 out of 10. The visit is free, and the written quote with its items listed costs you nothing. A front garden that sits above the road has the same retaining problem, and a driveway in Corfe Mullen is priced with it in mind. Before you book a visit in Corfe Mullen, you can read our customers' Google reviews, word for word, on our reviews page.
Planning at a glance
Do you need planning permission in Corfe Mullen?
Most repairs in Corfe Mullen need no application at all. What decides whether a change to the outside of your house does is who the council is, whether a conservation area or a listing applies, and whether the place sits in a protected landscape.
| Question | In Corfe Mullen |
|---|---|
| Who decides | Dorset Council is the planning authority for Corfe Mullen. Dorset Council's heritage pages set out what it controls. |
| Conservation area | Yes: Brogg Street / Sleight Lane Conservation Area. Check whether your street is inside the boundary before changing anything visible. |
| Listed buildings | Yes, there are listed buildings in and around Corfe Mullen. If yours is one, work can need listed building consent. |
| Protected landscape | No National Park or National Landscape covers Corfe Mullen. |
Questions
Questions about patios in Corfe Mullen
My patio holds water against the back wall. What is wrong with it?
Almost always the fall. Either it was laid flat, or it runs back towards the house instead of away from it. Relaying to a proper fall and adding a channel across the top of the paving deals with it.
Can you lay new slabs over my existing concrete flags?
We would rather not. It adds forty or fifty millimetres to the height, and on a low threshold that eats the gap to the damp proof course. Taking the old paving up leaves you at the right level.
How much of the garden has to be dug out?
Enough to get a compacted sub base and a mortar bed under the paving and still finish below the damp course. Where the lawn sits high that can mean a step down into the patio and retaining the back edge.
Can the water coming off the lawn be dealt with too?
That is usually the real job here. A channel across the top of the paving catches it before it reaches the house, and from there it goes to an existing gully or a soakaway clear of the foundations, or the patio is built permeable.
Will my garden be unusable while you are there?
Only the part we are working in, and we sweep at the end of each day. As for time, a straightforward rear patio is about a week, and a retaining wall, steps and a channel add a few days for curing.
Nearby, and next door
Patios near Corfe Mullen
Nearby places we also cover for patios, with straight-line distances from Corfe Mullen, and the other trades we offer in Corfe Mullen itself.
Patios nearby
Our other trades in Corfe Mullen
Patios guides
Driveway planning permission and where water goes Frost damage to brickwork: why it shows later Resin bound, block paving or tarmac comparedEverything we do in Corfe Mullen Patios, all areas Every area we cover
Free quote
Find out where your water is going
Thomas comes out, takes the levels off your back door, works out the dig and the drainage and prices it in writing. The visit and the quote are free.