Patios in Corfe Mullen
On a lot of the estate plots here the lawn finishes higher than the back door, so the patio has to be dug down and drained rather than simply paved over.
The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.
Most patio trouble in Corfe Mullen comes from a garden that sits higher than the house. Dig the level down, hold the back edge and put the water somewhere, and the paving on top is straightforward.
The calls tend to be one of three. A square of 1970s concrete flags that has sunk towards the back wall and now holds a puddle. A damp strip of brickwork behind the paving that never dries out. Or somebody with a wide patio door who wants the whole back of the house opened up properly and does not know where to start.
All three come back to level and water rather than to the slabs. We come out, read the ground with a level, work out how much has to be excavated and where the runoff ends up, then put the dig, the base, the edging and the paving on separate lines in a written itemised quote. The site visit and the survey of levels are free.
The work
Patios on ground that falls the wrong way

Reading the ground before anything is ordered. We stand at the back door with a level and look uphill, and chalk the DPC on the brickwork before anything else. If the lawn finishes higher than the threshold, this is a drainage job with paving on top. It settles the dig depth, the fall, the edging and whether a channel is needed.
Digging down instead of building up. The tempting fix is to add height to get the paving flat. It is the wrong way round: it pushes the finished level towards the damp proof course and traps water against the wall. We excavate instead, take the spoil away and set the paving two courses below the damp course with a fall running off it.
What comes out. Old concrete flags on a bed of sand, sometimes a slab left by a shed that went years ago, and on the estate plots made ground from the build. It is dug to formation and barrowed out through the side gate, priced by the load.
The base. Geotextile membrane, then MOT Type 1 hardcore compacted in layers, a sharp sand screed to level it, and a full bed of mortar under each slab with a slurry primer on the back, not five dabs. A proper mortar bed does not go hollow. Dabs are quicker and they are why a slab starts rocking, sounds hollow underfoot and ends up cracked across the middle.
Choosing the slab. Porcelain is calibrated to a consistent thickness and stays clean in a shaded corner. Indian sandstone is hand cut and warmer to look at. Limestone and granite are harder wearing and darker, and travertine holds water. We bring samples out and lay them down wet, because a dry sample in a showroom tells you little.
Edges, steps and the lawn. Where the garden sits above the patio the back edge has to be retained rather than simply butted against soil, or the border ends up on your paving every time it rains. That means a low retaining wall or a haunched kerb with a coping, steps up onto the grass at a rise you can walk in the dark, and a gravel border along the wall to take splashback.
Water, and where it is allowed to go. The fall runs away from the house into an ACO channel across the back of the patio, an existing gully, or a soakaway clear of the foundations. Where the runoff has nowhere to go we build permeable, which is a different sub base rather than a different slab.
Jointing, and the patio you already have. Joints are filled with a brush in resin compound, a grout slurry or pointed by hand in mortar, never loose sand. If your paving has only sunk or lifted in one bay we say so and quote the lift and relay rather than the rebuild. Algae, efflorescence and staining after a wet winter are usually a clean and a re-joint.
How it runs
From your call to a written price

Same team from first visit to last, one person to ring, and no sub-contracting your work out to somebody you have never met. The quote is itemised, not a figure on the back of a card: excavation and muck away, the sub base, the falls and where water goes, edgings and steps, the slabs themselves, and jointing on separate lines, so you can compare it properly against anyone else's.
Nothing is left open or unusable overnight. The site is swept at the end of each day rather than the end of the job, and what comes out leaves with us. If something turns up once we start that nobody could have seen, you get a photograph and a price before we carry on.
Paving a back garden at ground level is ordinarily permitted development, so planning permission is rarely needed here; the government guidance on when permission is required sets out where that stops. There is no conservation area over the village and one listed entry, so appearance is not controlled. A retaining wall over a metre alongside a road is covered by the rules on garden walls. Finishing two courses below the damp proof course is building control, and Approved Document C is where it comes from.
Cost
What decides the price of a patio
No rate per square metre, because the slabs are the part you choose and the smallest part of the price.
Getting to it. A bungalow with a wide side path, a 1970s semi where the only access is a narrow gate, and a detached house you can get a mini digger and a skip onto are three different prices for the same square metres. Everything comes in and goes out through the garden, often through a side gate or the house. A patio you can barrow to directly is a different job from one where every slab is carried. The work at height rules still apply to the dig and the machinery.
What is coming out before anything goes down. An old concrete slab, a raised bed, tree roots or made ground all have to be dug out and taken away, and that is priced by the load rather than by the metre. The dig is where a patio quote is won or lost.
Falls, levels and the damp course. A patio has to fall away from the house and finish at least two courses below the damp proof course, and getting that right often means steps, a retaining edge or a drainage channel. Laying a new patio up against a wall at the wrong level is the single most expensive mistake on this kind of job.
Comparing quotes? Ask how deep the dig goes and what sub base is specified, whether the slabs are laid on a full wet bed or on dabs, what the falls are and where the water goes, whether edgings and steps are included, and what the jointing compound is. Two quotes for the same job are usually two different jobs.
If it has become a hazard
A patio that has lifted, sunk or turned slippery
Ring rather than use the form. A slab that has lifted at one corner or a step that has dropped is a trip, and a north facing patio in winter can be genuinely dangerous. We can usually lift and re-lay the worst of it quickly, then look properly at whether the base under the rest has gone. We are seven miles away, so a rocking slab by a back door or water standing against the wall usually gets looked at within a day or two. The phone is answered 24 hours for emergencies; scheduled work runs Monday to Friday, 8am to 6pm.
Worth knowing
The lawn is often higher than the back door
Nearly two thirds of Corfe Mullen went up between 1945 and 1982, most of it in the 1970s and early eighties, and a lot of it on ground cut and filled to get a level plot. The house sits on the cut. The back garden very often sits above it.
That is why so many patios here have the same fault. Water coming off the lawn arrives at the back of the paving, runs along the house wall because there is nowhere else to go, and after a few winters there is a green strip against the brickwork and a slab or two that has dropped. Laying new paving over the old flags makes it worse, because it raises the level and shortens the gap to the damp proof course.
The fix is unglamorous and it works. Dig out rather than build up, hold the back edge with a low retaining wall, put a channel along the top of the patio to catch what comes off the garden, and run the fall away from the house into it. Ask every quoting builder where the water off the lawn ends up.
Who you are dealing with
A local firm you can check
We cover Corfe Mullen, Lockyers, Blandford Road, Wareham Road and out to Henbury, broadly BH21, under Dorset Council. You are dealing with Bournemouth Roofing & Building, the trading name of Bournemouth Roofing & Building Ltd, registered in England and Wales, company number 15471719, which you can look up in a minute. Thomas Hannen's business, and he is the one who comes out to price the job, not a salesman. A verified customer's 10 out of 10 on Checkatrade. The visit and the written quote are both free.
Questions
Corfe Mullen questions we get asked
My patio holds water against the back wall. What is wrong with it?
Almost always the fall. Either it was laid flat, or it runs back towards the house instead of away from it. Relaying to a proper fall and adding a channel across the top of the paving deals with it.
Can you lay new slabs over my existing concrete flags?
We would rather not. It adds forty or fifty millimetres to the height, and on a low threshold that eats the gap to the damp proof course. Taking the old paving up leaves you at the right level.
How much of the garden has to be dug out?
Enough to get a compacted sub base and a mortar bed under the paving and still finish below the damp course. Where the lawn sits high that can mean a step down into the patio and retaining the back edge.
Can the water coming off the lawn be dealt with too?
That is usually the real job here. A channel across the top of the paving catches it before it reaches the house, and from there it goes to an existing gully or a soakaway clear of the foundations, or the patio is built permeable.
Will my garden be unusable while you are there?
Only the part we are working in, and we sweep at the end of each day. People ask how long: a straightforward rear patio is about a week, and a retaining wall, steps and a channel add a few days for curing.
Nearby, and next door
Patios near Corfe Mullen
Patios nearby
Our other trades in Corfe Mullen
Everything we do in Corfe Mullen Patios, all areas Every area we cover
Free quote
Find out where your water is going
Thomas comes out, takes the levels off your back door, works out the dig and the drainage and prices it in writing. The visit and the quote are free.
