Patios in Beacon Hill

There is no conservation area here and nothing listed, so what your patio looks like is entirely up to you; the level and the drainage are the parts that are not.

The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.

At Beacon Hill nothing is listed and no conservation area applies, so the paving you choose is your decision alone. The rules that remain are building control ones about level, fall and where the rainwater goes.

The calls here are refreshingly simple. Somebody wants the back garden opened up with a proper sitting area, usually alongside new doors. Or an old set of flags has sunk, gone green and needs taking out and doing again from the ground up.

Neither comes with a heritage question attached, which saves a conversation. We come out, take a survey of the levels, look at where the water will go, and price the dig, the base, the edging, the drainage and the paving on separate lines in a written itemised quote. The site visit and the quote are free.

The work

A patio decided by what you want, not what you are allowed

Porcelain patio slabs laid to a fall with a gravel border alongside
Laid to a fallWater goes away from the house, not along the wall.

Starting with what you actually want. With nothing designated over this settlement, the first conversation is about the patio rather than about permissions. How many people sit out, where the sun is at seven, whether a barbecue wants its own corner, and whether the lawn stays. That shapes the size, and the size shapes everything after it.

The dig and the muck away. Turf and topsoil, old concrete, a set of flags bedded on sand, roots and any made ground, all excavated to formation and taken off site. Spoil is priced by the load that leaves rather than by the metre it covered. Access on most plots here is good enough for machinery and a skip, which keeps that part sensible.

Levels against the house. We scrape back, chalk the DPC on the brickwork and set the finished paving two courses below it, falling away from the wall. Where a threshold has to stay flush for a wide door, a recessed channel does the job a step would otherwise do.

Base and bed. Geotextile membrane, MOT Type 1 hardcore compacted in layers, a sharp sand screed to level it, then a full bed of mortar under every slab with a slurry primer on the back. A proper mortar bed stays solid. Dabs go hollow, and a hollow slab is the one that ends up rocking, cracked and holding water two winters later.

The paving, and it really is your choice. Large format porcelain in a light grey, calibrated so every joint is even. Riven Indian sandstone, warm and hand cut. Limestone, granite for something dark and hard wearing, travertine if you can live with a surface that holds water. Nothing here is ruled out by a designation, so pick what you want to look at and we will lay samples out wet before you commit.

Edges, steps and retaining. The perimeter is held with a haunched kerb or an edging bedded in concrete, retaining walls sit on a proper footing with a coping over them, and a gravel border runs along the house wall to take splashback. Steps get set at a rise you can walk in the dark rather than whatever the level happened to leave.

Where the water goes. The fall runs off the house into an ACO channel, an existing gully or a soakaway set clear of the foundations, with a permeable build up where the runoff has nowhere to travel. This part is not optional and it is not a matter of taste, which is why it sits on the quote as its own line.

Jointing, and the patio you have now. Joints take a brush in resin compound, a grout slurry or hand pointing in mortar. Where a patio has only lifted or sunk in one bay, or turned slippery with algae and shown efflorescence and staining, we quote the clean, the re-joint or the lift and relay rather than a rebuild you do not need.

How it runs

From your call to a written price

A finished porcelain patio in the wet, showing how the surface drains and where the joints sit
Judged in the wetRain shows the falls and the joints that a dry day hides.

Same team from first visit to last, one person to ring, and no sub-contracting your work out to somebody you have never met. The quote is itemised, not a figure on the back of a card: excavation and muck away, the sub base, the falls and where water goes, edgings and steps, the slabs themselves, and jointing on separate lines, so you can compare it properly against anyone else's.

Nothing is left open or unusable overnight. The site is swept at the end of each day rather than the end of the job, and what comes out leaves with us. If something turns up once we start that nobody could have seen, you get a photograph and a price before we carry on.

Paving a garden at ground level is ordinarily permitted development, and the government guidance on when permission is required sets out the few places that stops. There is no conservation area over Beacon Hill and nothing listed in it, so nothing sits on top of that. Garden and retaining walls still have height limits under the rules on garden walls. The one thing that does apply everywhere is building control on the level against the house, which comes from Approved Document C.

Cost

What decides the price of a patio

No rate per square metre, because the slabs are the part you choose and the smallest part of the price.

Getting to it. A modern plot with room for machinery and a skip, a cottage with a single narrow gate, and a house where the only route runs through the kitchen are three different jobs. Everything comes in and goes out through the garden, often through a side gate or the house. A patio you can barrow to directly is a different job from one where every slab is carried. The work at height rules still apply to the dig and the machinery.

What is coming out before anything goes down. An old concrete slab, a raised bed, tree roots or made ground all have to be dug out and taken away, and that is priced by the load rather than by the metre. The dig is where a patio quote is won or lost.

Falls, levels and the damp course. A patio has to fall away from the house and finish at least two courses below the damp proof course, and getting that right often means steps, a retaining edge or a drainage channel. Laying a new patio up against a wall at the wrong level is the single most expensive mistake on this kind of job.

Comparing quotes? Ask how deep the dig goes and what sub base is specified, whether the slabs are laid on a full wet bed or on dabs, what the falls are and where the water goes, whether edgings and steps are included, and what the jointing compound is. Two quotes for the same job are usually two different jobs.

If it has become a hazard

A patio that has lifted, sunk or turned slippery

Ring rather than use the form. A slab that has lifted at one corner or a step that has dropped is a trip, and a north facing patio in winter can be genuinely dangerous. We can usually lift and re-lay the worst of it quickly, then look properly at whether the base under the rest has gone. We are a little over eight miles away, so a rocking slab by a back door or a patio that has turned greasy underfoot is normally looked at within a day or two. The phone is answered 24 hours for emergencies; scheduled work runs Monday to Friday, 8am to 6pm.

Call now: 07435 839745

Worth knowing

Nothing here is designated, and that is useful

Most pages about building work around here have to talk about designations. This one does not. There is no conservation area over Beacon Hill and nothing listed in it, which is genuinely unusual on this patch and worth saying plainly.

What it means in practice is that the appearance of your patio is nobody's business but yours. No question of whether a light grey porcelain reads wrong against old brick. No wall height limited because a boundary is visible from a lane. No consent needed for work in the grounds of a listed building. Paving a back garden at ground level is ordinarily permitted development anyway, and here there is nothing sitting on top of that to complicate it.

The rules that still apply are the ones nobody can opt out of, and they are all about level and water. The paving finishes below the damp proof course. The fall runs away from the house. The rainwater ends up on your plot rather than in the road. Those come from building control rather than from planning, and they are the ones that actually protect the house. So spend the conversation on what you want to look at, and let us worry about the rest.

Who you are dealing with

A local firm you can check

We cover Beacon Hill, Sturminster Marshall, Henbury and the roads towards Lytchett Minster, broadly BH16, under Dorset Council. You are dealing with Bournemouth Roofing & Building, the trading name of Bournemouth Roofing & Building Ltd, registered in England and Wales, company number 15471719, which you can look up in a minute. Thomas Hannen's business, and he is the one who comes out to price the job, not a salesman. A verified customer's 10 out of 10 on Checkatrade. The visit and the written quote are both free.

Questions

Beacon Hill questions we get asked

Do I need permission for a patio at Beacon Hill?

For paving laid at ground level in a garden, no. Nothing here is listed and there is no conservation area, so the usual permitted development position applies with nothing on top of it. A raised platform or a tall boundary wall is the exception.

Is there any restriction on what the paving looks like?

None. No designation covers the settlement, so colour, size and material are entirely your decision. We will still give you an honest opinion about a very light slab in a shaded corner, but that is advice rather than a rule.

What rules do still apply, then?

The building control ones. The finished paving has to sit clear of the damp proof course, the surface has to fall away from the house, and the rainwater has to be dealt with on your own land rather than run into the road.

Can I have a really large format slab?

Yes, and they look excellent on a wide modern elevation. They need a flatter, better prepared bed than a small unit and two people to place each one, so the laying takes longer. That shows on the quote as labour rather than as a surprise.

What sort of lead time is there before you can start?

We set a date at the quote rather than leaving it open, usually a few weeks out. Once we begin, how long depends on the job: about a week for a straightforward rear patio, towards ten days with steps, a retaining wall or a soakaway.

Free quote

Spend the conversation on what you want

Thomas comes out, takes the levels, sorts the falls and the drainage and prices it in writing. The visit and the quote are free.