Patios in Broadstone, cut into a slope

Gardens along this ridge run uphill or down, so the terrace is really groundworks: a cut, a retaining edge and somewhere for the water behind it to go.

The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.

Last updated

Broadstone is built across a ridge, and a lot of its gardens run uphill or downhill from the back door rather than lying flat. On a sloping plot a patio stops being paving and becomes a small piece of groundworks: a cut, a retaining edge, a set of steps and somewhere for the water behind the wall to go.

Patio work in Broadstone starts from a retaining wall that has started to lean, a terrace that has slipped downhill and opened its joints, or a bank the family simply cannot use because it is too steep to put a chair on.

We take levels across the fall of your Broadstone garden, work out how much has to be cut and how much held back, and decide whether one terrace or two will actually work. Then it goes into a written itemised quote, with the dig, the retaining, the drainage, the paving and the jointing on their own lines. The visit and the quote are free.

The work

Terracing a garden that will not sit still

Porcelain patio slabs laid to a fall with a gravel border alongside (one of our own jobs, shown for patios in Broadstone)
Laid to a fallWater goes away from the house, not along the wall. Photo from one of our own jobs.

Cut and fill are the options. The first decision on any Broadstone slope is where the level sits. Cutting into the bank gives you solid ground to build on and produces spoil. Filling gives you a level quickly and produces a patio that settles for years afterwards. We cut wherever we can, and where filling cannot be avoided it goes in compacted in layers, not tipped.

Retaining edges and walls. Anything holding soil back is built on a footing, not bedded on sand. Low retaining courses are haunched in concrete; a taller wall wants a proper base, a drainage layer of clean stone behind it and weep holes or a land drain out to daylight. Water pressure behind a wall, not the soil, is what pushes most of them over.

Steps. On a slope the steps are the part you use every day and the part that gets skimped. Consistent rise and going, a footing under every flight, a bullnose or coping front so the edge reads clearly, and a slight fall on each tread so water does not sit and freeze on it.

The dig and the muck away. Cutting into a bank makes a lot of spoil, and on a Broadstone hillside plot it usually has to be barrowed uphill to the road. That is priced by the load and by the access, and it leaves with us.

Sub base and bedding. Geotextile membrane over cut subsoil, MOT Type 1 in compacted layers, then a full wet mortar bed with a slurry primer on the back of porcelain and dense stone. On a terrace built into a slope the base has to be right, because there is nothing holding the paving in place except the edge restraint.

Porcelain, sandstone, limestone and granite. Porcelain absorbs almost nothing and a textured face keeps its grip on a route that involves steps. Sandstone is warmer and easier to cut. Limestone marks with iron. Granite is the hardest wearing. Calibrated slabs sawn to one thickness lay far quicker than hand cut stone.

Where the water goes. On a slope the runoff arrives from above as well as falling on the paving. A channel drain along the top of a terrace intercepts what comes down the bank, and it needs a gully or a soakaway that will take it, judged against Approved Document H. Paving still falls away from the house and finishes two courses below the damp course.

Jointing and repairs. Joints brushed in with a two part compound and tooled off. Existing terraces get the same attention: re-bedding slabs that have crept, rebuilding a step that has dropped, re-pointing open joints, and clearing algae and efflorescence.

How it runs

Laying a patio outside a bungalow's back door

A finished porcelain patio in the wet, showing how the surface drains and where the joints sit (one of our own jobs, shown for patios in Broadstone)
Judged in the wetRain shows the falls and the joints that a dry day hides. Photo from one of our own jobs.

On a Broadstone bungalow the patio sits right outside the living room, and the back door threshold is often close to the ground. That makes the level the first thing Thomas checks when he comes out. He looks at the damp proof course, where the garden falls, and whether a barrow can get round the side.

The quote for a Broadstone patio puts excavation and muck away, the sub base, the falls and where water goes, edgings and steps, the slabs, and jointing on separate lines. Thomas stays your contact through the dig and the laying. Everything comes in and goes out through the side of the house, so we sheet the path. Nothing is left as an open hole overnight that you cannot get past, the spoil leaves with us and the garden is tidied each day. If the dig finds an old drain or a buried slab, you get a photograph and a price first.

Ordinary paving in a back garden is permitted development. Broadstone does have two conservation areas near the centre, though a back garden patio rarely raises any question there. Slopes are where it changes. A raised platform or decked terrace more than 300mm above the ground needs planning permission, and a wall on a boundary has height limits, which Planning Portal guidance on garden walls sets out. If the wall is one you share with next door, the Party Wall etc. Act may come into it.

Cost

The dig and the levels cost more than the slabs

A Broadstone patio has no rate per square metre. The slabs are the part you choose, and usually the smallest part of the price.

Levels against the house. A patio has to finish below the damp proof course and fall away from the wall. Outside a bungalow with a low threshold, that can mean digging the garden down, adding a step or fitting a drainage channel at the door. Getting it wrong puts water into the house.

What comes out first. An old concrete slab, crazy paving, a raised bed or tree roots all have to be broken up and taken away. On clay the spoil is heavy and it is paid for by the load.

The base. Clay moves with the seasons, so a patio laid straight onto it on dabs of mortar rocks within a year or two. A proper sub base and a full bed under each slab cost more and last.

Access. A barrow down the side path is one job. Carrying every slab through the house is another. The work at height rules still apply to any raised terrace or retaining edge.

Ask anyone else what sub base they specify, whether the slabs go on a full bed or dabs, and where the water will go.

If it has become a hazard

A patio slab that has lifted or a step that has dropped

A slab lifted at one corner or a step that has dropped is a trip, and on a slippery patio outside a bungalow's back door it catches people who do not expect it. Put a pot on it or tape it off. Then ring.

The first visit to a Broadstone garden lifts and re-lays the worst of it, and we look at whether the base under the rest has gone or whether clay movement is pushing it about. Our booked days are Monday to Friday, 8am to 6pm. Ring rather than send the form, and if no one answers we will phone you back as soon as we are able.

Call now: 07435 839745

Worth knowing

What actually pushes a garden wall over

A retaining wall on the Broadstone ridge nearly always fails for the same reason, and it is not the weight of the soil. It is the water. Rain soaks into the bank behind the wall, cannot get out through the front, and the pressure builds until the wall leans, cracks along a course or bulges in the middle. Frost then works into the crack and finishes the job.

The fix is unglamorous and it is what a proper build includes as standard: a layer of clean stone up the back of the wall, a perforated land drain at the bottom running out to daylight or a gully, and weep holes through the face. None of it is visible when the job is done, which is precisely why it is the first thing left out of a cheap quote.

So on a sloping garden in Broadstone, the question to ask anybody quoting is what is going behind the wall, not what is going on the terrace. A well drained retaining structure with modest paving on top will outlive an expensive porcelain terrace sitting on a wall that has nowhere to send its water.

Who you are dealing with

Patios in Dunyeats, Corfe Hills and the Merley side

For patios we cover Broadstone, Dunyeats, Corfe Hills and the Merley side, 7.3 miles from our Boscombe base, with Bournemouth, Christchurch and Poole Council as the planning authority. The business is Bournemouth Roofing & Building Ltd (registered in England and Wales, company number 15471719). Before you book a visit in Broadstone, you can read our customers' Google reviews, word for word, on our reviews page.

Thomas Hannen runs it and comes to see the garden before he prices a single slab. You can find a verified customer's 10 out of 10 for us on Checkatrade. There is no charge for the visit, and the itemised written quote is free as well. A sloping front garden has the same problem, and a driveway in Broadstone cut into the bank needs its own retaining and drainage.

Planning at a glance

Do you need planning permission in Broadstone?

Most repairs in Broadstone need no application at all. What decides whether a change to the outside of your house does is who the council is, whether a conservation area or a listing applies, and whether the place sits in a protected landscape.

The planning position in Broadstone, from council and national records.
Question In Broadstone
Who decides BCP Council is the planning authority for Broadstone. BCP Council's heritage pages set out what it controls.
Conservation area Yes: Ridgeway and Broadstone Park Conservation Area and Tudor Road and Golf Links Road Conservation Area. They cover parts of Broadstone, so check whether your street is inside one.
Listed buildings Yes, there are listed buildings in and around Broadstone. If yours is one, work can need listed building consent.
Protected landscape No National Park or National Landscape covers Broadstone.

Questions

Questions about patios in Broadstone

My garden slopes badly. One terrace or two?

One terrace or two depends on how much fall there is over the length you want to use. One long terrace on a steep plot means a tall retaining wall and a lot of cut. Two shallower levels with a few steps between them usually costs less to build and gets used more.

Why has my retaining wall started to lean?

Usually it is water trapped behind it, not the weight of the soil. Without a stone drainage layer and a land drain the pressure has nowhere to go and the wall moves. Rebuilding it without fixing that just delays the same result.

Do steps need a footing?

Every flight, yes. Steps bedded straight onto made ground drop at one end within a few winters, and an uneven rise is exactly where people trip. It is a small part of the cost and the first thing worth insisting on.

What happens to all the soil that comes out of the bank?

It goes out to a grab lorry or a skip and leaves with us. On a hillside plot where it has to be barrowed up to the road that takes longer, so it is priced by the load and by the access rather than being folded into a rate.

Can porcelain be used on the steps as well as the terrace?

Yes, and it is usually the right choice. Matching bullnose step units are made for it, and a textured finish holds its grip when a tread is wet, which matters far more on a step than it does in the middle of a patio.

Free quote

Get the slope measured before you plan a terrace

Thomas comes out, takes levels across the fall and prices the cut, the retaining, the drainage and the paving in writing. The visit and the quote are free.