Flat Roofing in Corfe Mullen

Flat roof repairs, re-covering in EPDM, GRP fibreglass and felt, new decks, falls and outlets on garages, sun lounges and extensions across Corfe Mullen.

The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.

Most of the flat roofs in Corfe Mullen went on within a few years of each other, so they are wearing out in the same order. Working out where yours has got to in that sequence is what tells you whether this is a detail to repair or a covering to replace, and it is the first thing we do on site.

The pattern

Roofs of the same age fail in the same order

A felt flat roof on an extension, with the parapet coping being bedded on top
It fails at the edgeUpstands, copings and the lead. Almost nothing fails in the middle.

We have been on a lot of these. The estates here went up between the late sixties and the early eighties, and the garages, the sun lounges and the first wave of back extensions carry roofs of much the same age and much the same build. That works in your favour, because it means we can usually tell you what is under a covering before we cut into it, and what is likely to be wrong with it before we get the ladder off the van.

We still get the ladder off the van. Nothing replaces standing on a roof, pressing the covering to see whether it gives or cracks, opening a small area near the outlet where trouble starts, and photographing the boards. What the local knowledge adds is context. A roof most of the way through its life needs different advice from an identical roof only halfway. The survey costs nothing and the price that follows it is itemised line by line.

In order

What goes first, what goes next, and what we do about each

A stripped roof with the membrane and battens going back over the deck
What is under itThe deck decides the price, and a soft board cannot be covered over.

First to go are the trims. An edge trim is a length of metal or plastic with a drip formed into it, holding the perimeter of the covering down and throwing water clear of the fascia. Fixings work loose, the joint between two lengths opens up, and water starts running back underneath instead of falling off the end. Replacing them is half a day and it saves the roof.

Next is the junction with the house. Wherever a flat roof meets a wall, the covering has to turn up as an upstand and something has to cap it. On the newer estates that is a cover flashing cut into a chase; on anything older it is lead worked over an apron. Mortar shrinks out of a chase, lead splits along a fold, and a parapet loses the bedding under its coping or never had a cavity tray behind it to start with. All of that is edge work and none of it means a new roof.

Then the outlet. It is the lowest point on the roof and everything ends up there, so it silts, and once it silts the roof holds water. Standing water is the accelerator: it works into a lap, lifts the seam and gets in underneath. We clear the outlet, the hopper, the gutter and the downpipe as a matter of course, and where a roof has always ponded we take the boarding up and re-cut the fall with firrings or tapered insulation so it drains where it was meant to.

The covering itself usually goes last, and it announces itself first. The mineral finish wears bald, blisters and bubbles lift, and the surface cracks wherever a thumb presses. One split is a repair: back to sound material, a new piece welded or bonded across it, the edge dressed flat. A dozen splits is a re-cover. What goes down then is EPDM as one cold bonded rubber sheet, GRP brushed on wet over new plywood and cured as a single fibreglass skin, three layer built up felt under a torched mineral cap sheet where the roof gets walked, or welded single ply across a wide span. Rooflights and lanterns come off and go back on kerbs we build up so the skylight sits above any standing water, and Velux units, loft hatches, soil pipes and vent pipes each take a collar.

And underneath everything, the deck. Chipboard was standard on this era of extension and it does not survive damp, so once it goes soft at a corner it comes out and OSB goes down instead. The joists get looked at while the boards are up. If most of the covering is coming off anyway then the insulation standard is engaged, and the sensible build is warm: PIR above the deck with the vapour control layer under it, keeping the dew point out of the timber, rather than a cold roof depending on a ventilation gap nobody is ever going to inspect again. BS 6229 sets out the construction and regulation 23 of the Building Regulations is what brings insulation into it when a covering is renewed.

How it runs

From your call to a written price

A finished grey flat roof with three rooflights set into it
Falls, then coveringThe water needs somewhere to go before a roll comes off the van.

Same team from first visit to last, one person to ring, and no sub-contracting your work out to somebody you have never met. The quote is itemised, not a figure on the back of a card: access, stripping the old covering, any new deck or firrings, the insulation, the membrane and each upstand, outlet and edge trim, and disposal on separate lines, so you can compare it properly against anyone else's.

Nothing is left open or unusable overnight. The site is swept at the end of each day rather than the end of the job, and what comes out leaves with us. If something turns up once we start that nobody could have seen, you get a photograph and a price before we carry on.

Re-covering a flat roof the way it was built is maintenance, and Planning Portal guidance sets out where that stops, which is at a change of roof line or appearance. There is no conservation area over Corfe Mullen and a single listed entry, so for almost every address here there is nothing to apply for and Dorset Council only comes into it through building control.

Cost

What decides the price of a flat roof

No rate per square metre, because the square metres are the easy part and what is under the covering is what decides the job.

Getting to it. A detached garage at the end of a drive, a sun lounge across the back of a bungalow and a two storey rear extension are three different jobs before anything is unrolled. A garage or a single storey extension will often come off a tower, anything above a two storey wall wants a scaffold, and the platform has to stand while the deck is open rather than for an afternoon. The work at height rules are why it is a priced line rather than something folded into a rate.

The deck under the covering. A sound deck can be re-covered. Chipboard that has been wet for years, or ply that gives underfoot, has to come off and be replaced, and you cannot tell which you have from the ground or from a photograph. We lift a corner before quoting, because the deck is the single biggest swing in the price.

The falls, and where the water is meant to go. Most flat roofs that fail were never laid to a fall, or the fall runs at an outlet that has since been blocked or built over. Correcting it with firrings is more work than laying a membrane and it is the difference between a roof that lasts and one that ponds. Upstands, edge trims and each outlet are priced one at a time, because that is where the hours and the leaks both are.

Comparing quotes? Ask which system is being quoted and how many layers, whether the deck is being renewed or covered over, whether the falls are being corrected with firrings, how the upstands, outlets and edge trims are detailed, and whether the scaffold and the skip are in the price. Two quotes for the same job are usually two different jobs.

If it is coming through

Water through a flat roof

Ring rather than use the form. A flat roof that has split, blistered or lifted at an upstand puts water straight onto a ceiling, and once the deck is wet the damage carries on after the rain stops. The first visit is about getting it covered and dry, and we price the permanent job once we can see how much of the deck has gone. Get a bucket under it, and pierce a bulging ceiling in one spot over the bucket rather than let it come down on its own. We are a few miles away, so an emergency cover is normally same day. The phone is answered 24 hours for emergencies; scheduled work runs Monday to Friday, 8am to 6pm.

Call now: 07435 839745

Same age, same faults

When one roof in the street goes, the others are a winter behind

Around three fifths of the housing here dates from between the war and the early eighties, and the busiest stretch was the seventies. On a tiled roof that hardly matters. On flat roofs it matters a great deal, because the additions went up in batches, by the same builders, with the same felt, the same chipboard and the same trims. They are reaching the end of it together.

There are two practical consequences. One is that a neighbour's leak is fair warning about yours, and edge work done early is a fraction of what a soaked deck turns into. The other is that most of what we actually find on these roofs is still repairable: sound boards, tired trims, a silted outlet, a flashing that has dropped out of its chase. Before you accept a quote for a whole new roof on a Corfe Mullen extension, ask what condition the deck is in, and ask to be shown it.

Who you are dealing with

A local firm you can check

We cover Corfe Mullen, Broadstone, Merley, Upton and Lytchett Matravers across BH21 and BH16, out from Bournemouth. You are dealing with Bournemouth Roofing & Building, the trading name of Bournemouth Roofing & Building Ltd, registered in England and Wales, company number 15471719, which you can look up in a minute. Thomas Hannen's business, and he is the one who comes out to price the job, not a salesman. A verified customer's 10 out of 10 on Checkatrade. The visit and the written quote are both free.

Questions

Corfe Mullen flat roof questions

The neighbours have all had theirs done. Does mine need doing?

Not necessarily, and it is worth finding out rather than assuming. Roofs of the same age can be years apart depending on which way they face and whether the outlet has been kept clear. We will look and tell you where yours is up to.

Can the trims be renewed without touching the covering?

Usually yes, and it is one of the best bits of money you can spend on a roof of this age. The perimeter is lifted, new trim goes on with a proper drip, and the covering is dressed back down over it. Half a day on most garages.

How can I tell whether the deck is wet?

You often cannot from above. The clues are a covering that feels soft underfoot, a ceiling that has marked, and boards that give when you stand between the joists. The certain way is to open a small area, which we do at the free visit and make good before we leave.

Is it worth insulating while the roof is off?

If most of the covering is being renewed then it stops being optional, because building control expects a renewed roof to meet the insulation standard. Doing it as a warm roof at the same time costs far less than going back to it later, and it takes the condensation risk off the timber.

Free quote

Get a written price for your Corfe Mullen flat roof

A free site visit, the deck checked before we quote, and an itemised price you can compare.