Rendering in Sopley, old core and new estate

Sopley is one small village with two kinds of wall in it, and a system that suits one of them will cause real damage on the other.

The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.

Last updated

Rendering in Sopley depends on what the wall is made of. The conservation area covers the village, and its older solid walls have to breathe, so cracked or blown render there comes off and goes back in lime. A newer cavity-walled house takes a modern system, and a silicone thin coat or monocouche is the right re-render. The wrong specification on either causes trouble. Damp inside is a plastering repair.

People in Sopley do not usually know which side of that line they are on, and there is no reason they should. It only matters when somebody proposes putting a plastic rich coat on a wall that has been drying through its own face for two hundred years.

So we start with the Sopley address and the wall, not the product. We check whether the property is in the designated area, tap the elevation to see what is still bonded, and work out what the wall behind is built of. Then it goes into a written itemised quote with the access, the preparation, each coat and the beads listed separately. The visit and the quote are free.

The work

Lime on the old walls, modern systems on the new

A house elevation part way through rendering, old finish on one side and new render on the other (illustrative photo for rendering in Sopley)
Half and halfThe old finish on one side, the new system on the other. Illustrative photo.

Working out what the wall is. Before anything in Sopley is quoted we tap the elevation and look at what the render is sitting on. A solid wall behaves nothing like a modern cavity wall, and that is the one mistake here that cannot be corrected afterwards.

Lime render on solid walls. A period wall carries moisture out through its face. Lime render lets it, so the wall dries and the coat stays put. It goes on in a scratch coat and a floating coat with a lime finish over it, worked and protected while it cures, and it is slower than anything modern for a reason.

Why a modern system is wrong on an old wall. Put a plastic rich topcoat on a solid wall and the moisture is trapped. It shows as damp on the inside face and, outside, a coat that lifts and blows off in the first hard frost. Not a question of quality, simply the wrong material for the background.

Silicone thin coat and monocouche on the newer houses. On a newer cavity-walled house in Sopley a modern system is exactly right. A mesh reinforced basecoat, a primer and a silicone topcoat scraped or floated, or a through-coloured monocouche laid in one build. Neither needs painting afterwards.

Traditional sand and cement, dash and Tyrolean. Still the right build for matching into an existing scratch and float elevation, for outbuildings and for garden walls. Dashed and Tyrolean finishes can be cut out and repaired, with the usual caveat that new aggregate reads lighter than weathered aggregate for a while.

Hacking off and preparing the background. Blown render on a Sopley wall comes off to a firm edge, by hand on an old wall where a breaker would take the face off soft brick or stonework. The background is made good, given a key and stabilised with a primer where it is friable.

Beads, bellcast and stop ends. Angle beads at the corners, stop beads at the reveals and a bellcast at the base so water drips clear. On a lime job the arrises are often formed by hand instead, because a hard metal bead in a soft coat is a crack waiting to happen.

Render over external wall insulation. On the newer Sopley cavity houses, insulation board or a render carrier fixed to the outside face and rendered over is worth pricing while the scaffold is up, for the thermal gain. On a solid wall EWI has to be a breathable build or it makes the drying problem worse.

Cracking, delamination, algae and staining. Cracks are cut out, meshed and made good before frost gets behind them. Green staining on a shaded elevation is a surface matter, and a wash with a treatment and a breathable coating deals with it more cheaply than a new system.

How it runs

Re-rendering an elevation, coat by coat

A rendered bungalow elevation finished and cleaned down, with beads and stop ends in place (illustrative photo for rendering in Sopley)
Beads and stop endsWhere the render stops is where it is judged. Illustrative photo.

Thomas comes out and taps the render across the elevation to find where it has blown, and checks what the wall underneath is made of. On a newer Sopley house that is usually block or brick with sand and cement render or pebbledash; on an older cottage it may be lime over soft brick, which needs lime back.

The Sopley quote itemises access and scaffold, protection, hacking off and preparing the wall, the render system and number of coats, beads, stop ends and bellcast, and making good around sills and pipework. Thomas is your contact from hacking off to the finish coat. Windows, doors and paths are covered, the scaffold stands for the whole system, and each coat is left to take up properly before the next. The site is cleared at the end of each day and old render leaves with us. If the wall behind is cracked or the background is failing once the render is off, we show it to you in a photo, price it, and only carry on once you agree.

Repairing render on a Sopley house in the same material and finish is maintenance. Changing how an elevation looks may need permission if the building is listed or in a conservation area, and that is worth checking with New Forest District Council, the planning authority here; the Park's interactive property map shows other designations. Insulation behind render is building control work, and Approved Document L sets the Part L standard.

Cost

Blown render, the right system and the scaffold

What is on the wall now. Laying new render over sound brick or block is the straightforward case. If the old coat rings hollow when tapped, it has lost its grip and has to be hacked back to the background first, and on a pebbledashed front that can be most of the elevation. You cannot tell from the pavement, so Thomas taps the whole wall before he prices it.

Which system suits the wall. A silicone thin coat, a monocouche that carries its own colour, a traditional sand and cement scratch and top coat, or lime: each takes a different number of coats and days. A lime-built cottage wall needs to dry outwards, and sealing it under a plastic-rich finish pushes the damp indoors, so the wall chooses the system before you choose a colour.

The south west side. The walls in Sopley that face south west take the driven rain. They are where render cracks and blows first, and where the detailing at sills, bellcast and stop ends matters most.

Access. A rendered Sopley front in the middle of a terrace needs scaffolding that spans the houses either side for as long as the job runs. A bungalow gable is tower work. The work at height rules make access a separate line.

Ground movement. On shrink-swell clay, a crack running through the render and the wall behind may be the ground moving, so we look at the wall before re-rendering over it.

Ask other firms which system and how many coats, whether the old render is being hacked off, and whether the beads and the scaffold are included.

If it has started to come away

Render that sounds hollow or has cracked open

If render has cracked or sounds hollow when tapped, water is getting behind it and the frost will push more off. If a piece has already fallen, keep people clear of the wall below. Phone rather than using the form.

The first visit to a Sopley house removes anything loose, sheets the area if rain is due, and checks how far the blown area goes; the elevation is priced after that. Render jobs are programmed Monday to Friday, 8am to 6pm. Anything urgent needs a phone call, and if nobody answers, expect us to ring back as soon as we can manage it.

Call now: 07435 839745

Worth knowing

Two kinds of wall, two different answers

The older core of Sopley and the housing built since the war need opposite things from a renderer, which is unusual enough in one small place to be worth spelling out. The pre-1919 houses have solid walls: no cavity, no damp proof course, and a fabric that stays dry by letting moisture pass out through its face. The post-war houses have cavity walls that keep water out with a barrier.

A modern silicone or monocouche system is designed for the second kind. It is water shedding, it is relatively closed, and on a cavity wall that is exactly what you want. On a solid wall it seals the face, the moisture that used to leave through the render is trapped in the masonry, and it comes out on the inside of the house or pushes the coat off the outside.

So before accepting a quote in Sopley, establish whether the wall is solid or cavity, which a builder can tell you in a minute, and whether the address sits inside the conservation area, because there a change of texture is a planning question rather than a repair.

Who you are dealing with

Who you are hiring for render work in Sopley

We cover Sopley, Ripley and the lanes towards Bransgore, all BH23, 3.7 miles up the road from our Boscombe base. New Forest District Council is the council. You would be hiring Bournemouth Roofing & Building Ltd, registered in England and Wales, company number 15471719. Before you book a visit in Sopley, you can read our customers' Google reviews, word for word, on our reviews page.

Thomas Hannen, who owns it, comes out, taps the render and prices the elevation himself. A verified customer on Checkatrade gave a 10 out of 10. Our visit and the written quote, itemised line by line, are free.

Planning at a glance

Do you need planning permission in Sopley?

Most repairs in Sopley need no application at all. What decides whether a change to the outside of your house does is who the council is, whether a conservation area or a listing applies, and whether the place sits in a protected landscape.

The planning position in Sopley, from council and national records.
Question In Sopley
Who decides New Forest District Council is the planning authority for Sopley. The National Park boundary runs close by, and the Park's property map shows which side an address falls.
Conservation area Yes: Sopley Conservation Area covers the village. Winkton Conservation Area, under BCP Council, lies just outside it.
Listed buildings Yes, there are listed buildings in and around Sopley. If yours is one, work can need listed building consent.
Protected landscape No National Park or National Landscape covers Sopley.

Questions

Questions about rendering in Sopley

Is my cottage on a solid wall or a cavity wall?

Age is the quickest guide, and the thickness at a window reveal is the next. Anything built before about 1920 in this village is likely solid; anything much newer is usually cavity. We check it at the visit before we recommend a system.

Why is lime render more expensive to apply?

Because it is slower at every stage. It goes on in more than one coat, each coat has to be worked and then protected while it cures, and it cannot be rushed with a machine. The labour is the cost, not the material.

Does the conservation area stop me rendering at all?

No, it controls appearance, so like for like repair is maintenance. Changing the texture or the colour of something visible from the road is where you need to ask, and New Forest District Council is the planning authority for Sopley.

Can you match the render on a cottage that has been patched before?

Usually, yes: old walls carry several generations of repair, so we take the mix and the finish from the soundest original area rather than from the last patch, which is often the thing that looks wrong.

Is render the answer to damp in an old cottage?

Rarely on its own, and the wrong render makes it worse. Damp in a solid wall is usually about how the wall dries rather than how much water it takes in, so the first job is to stop sealing it in with cement and impermeable paint.

Free quote

Find out which system your wall should actually have

Thomas checks the address and the wall, taps the elevation and prices the right system in writing. The visit and the quote are free.