Plastering and rendering in West Moors

Ceilings, artex, skimming, re-plastering, dry lining and external render across West Moors and BH22. Free site visit, free written itemised quote.

The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.

Nine calls out of ten in West Moors are about a ceiling. Cracks along the board joints, artex somebody has finally had enough of, or a corner that has started to sag. Most of them can be overboarded and skimmed in a day or two without the whole ceiling coming down, and twenty minutes in your loft tells us which sort you have.

The village is bungalows, and that shapes the work more than anything else. Half the homes here are single storey, which means every ceiling in the house has a cold loft directly above it rather than a bedroom floor, and the rooms are wider because nothing upstairs needs holding up. Wide ceilings show every crack, and a ceiling with a loft over it is also the lid on your insulation, so it is doing two jobs at once.

The other thing to know is that most of West Moors went up inside the same twenty years, so the houses fail together and we see the same three faults all week: artexed board ceilings that have begun to sag between the joists, walls that have been dry lined at some point and now sound hollow in patches, and rooms left rough after a garage conversion or a new window. We survey the room, sound every wall and ceiling in it, look above the ceiling where there is a loft, then put an itemised written price in front of you.

The work

Knocking two rooms into one leaves a scar overhead

Freshly plastered lounge with a formed archway, walls and ceiling skimmed and drying
Skimmed and dryingTwo passes of finish off the trowel, left to dry properly.

Ceilings, which is most of what we do here. Half the homes in West Moors are bungalows, so the ceiling is as wide as the floor with nothing but a cold loft over it. Cracks along the board joints and popped nail heads are movement rather than failure, and scrim and a skim sorts them. A ceiling that has begun to belly between the joists is usually thin old board rather than a leak, and the quicker fix is to overboard across it and skim that, which leaves the loft undisturbed. One that has genuinely dropped away comes down instead. There is a great deal of artex above head height in this village: sound texture gets knocked back, prepared and skimmed over, heavy or loose texture is flatter overboarded, and nothing from before the 2000s gets sanded, because it can contain asbestos and wants sampling first.

Nearly two thirds of the village went up between the war and the early eighties, peaking around the turn of the seventies. In those bungalows the outside walls are usually plaster on blockwork and the partitions are board on stud. Where the background is sound we prepare and prime it and run two passes of finish coat off the trowel. Where a wall sounds hollow it has parted from the block, so that piece comes off and a backing coat goes on first: bonding on a dense or painted face, browning where the background keys, hardwall where you want it harder.

Opening a bungalow up. Knocking two rooms into one leaves a scar across the ceiling and a pair of raw returns, and that is a proper making good job rather than a patch: mesh over the joint between two different backgrounds, beads on the new corners, then the whole ceiling skimmed so the join does not show up the first time low winter sun comes through the window. In a chalet bungalow the sloping ceilings and dormer cheeks are the fiddly part, and every one of those angles wants a bead run true or the finished room reads crooked from the doorway.

Plenty of rendered and pebbledashed elevations here, mostly sand and cement of the same age as the houses. A full elevation goes back as a scratch coat and a basecoat with mesh through it, a primer and then a silicone thin coat, monocouche or K render topcoat, off a bell cast bead at the base. Low eaves are the one real bargain in a bungalow: much of this comes off a tower rather than a scaffold.

How it runs

From your call to a written price

The quote is itemised: protection, hacking off, board, the backing coat, beads, the finish coat, making good and disposal each on its own line. Furniture goes to the middle of the room and gets covered, and the old plaster leaves with us rather than sitting in bags on your drive. On permission there is not much to trouble you here. West Moors has no conservation area over it and a single listed entry in the parish, so listed building consent is unlikely to arise and the finish on the outside is very largely your own choice. The one thing that brings building control in is re-rendering a whole elevation rather than patching it, because Approved Document L treats that as renovating a thermal element.

Cost

What decides the price

Plasterboarded media wall skimmed ready for decoration, with a recess for a television and an inset fire
A media wall, skimmedBoarded, taped and skimmed, ready for the decorator.

No rate per square metre. Every wall and ceiling is sounded with a knuckle first, because the split between what is skimmed and what comes off back to the block moves the price further than the size of the room does. A bungalow with a drive and garage, a chalet bungalow with a loft room up a stair that full sheets of board will not go up, and an occupied house where the only bathroom is off the room being plastered are three different jobs. Above a low gable, scaffold is its own line, because work at height rules decide the platform rather than the budget.

If it has come down

A ceiling on the move, or plaster blown off a wall

Chimney breast freshly plastered above a fireplace, dried out and ready for decorating
A chimney breast, skimmedCut back, floated out and skimmed, ready for the decorator.

Ring rather than use the form. A ceiling pulling away from the joists, or plaster coming off a wall in sheets, goes to the front of the queue, because the next piece usually follows within days. Do not push a bulging ceiling back up. West Moors is about fifteen minutes up the road for us, so in most weeks we can look the same day.

Call now: 07435 839745

Worth knowing

In a bungalow, look above the ceiling before you replaster it

Finished bungalow in white render with a grey tiled roof and a resin driveway
Through-coloured renderThe colour goes through the coat rather than sitting on it.

In a bungalow the loft sits straight on top of every ceiling in the house, and that is worth knowing before you pay anyone to replaster one. Two very different problems look identical from the sofa. A ceiling that sags gently between the joists is almost always old thin board that has given up, and it is a plastering job.

Grey or brown patches that run in straight lines following the joists are not a leak and not a plastering job at all: they are cold spots where the insulation is thin or has been pushed away from the eaves, and moisture in the room settles on them. Skim over that and the pattern comes back through your new paint within a year.

So on a bungalow we go up through the hatch and look before we price. Board thickness, how far apart the joists are, whether the insulation reaches the eaves or has been trodden flat around the tank, and whether the eaves can still breathe. If the ceiling is sound it gets overboarded and skimmed, which keeps the loft insulation where it is and saves you emptying it.

If it has to come down, that is the moment to top the insulation up and clear the eaves, because the access is already paid for and it will never be this cheap again. And if what you have is a cold ceiling rather than a failed one, we will tell you that instead of selling you a skim.

Who you are dealing with

A local firm you can check

We cover West Moors and the BH22 villages, out to Ferndown, Three Legged Cross, St Leonards and Verwood, and Dorset Council is the planning and building control authority for this address. Bournemouth Roofing & Building Ltd, registered in England and Wales, company number 15471719, which you can look up in a minute. Thomas Hannen's business, and he is the one who comes out to price the job, not a salesman. A verified customer's 10 out of 10 on Checkatrade. The site visit and the written itemised quote are both free.

Questions

West Moors questions we get asked

Why is a bungalow ceiling job bigger than it looks?

Because the ceiling is the whole footprint of the house on one level. Just over half of West Moors is bungalows, 50.9% of the stock, so a full ceiling re-skim here covers far more area than the same job in a two storey house with the same number of rooms. It is also all sitting directly under cold loft. That is why ceilings and walls are measured separately on the quote rather than lumped together.

Our neighbours are having the same ceiling trouble. Why?

You were all built at once. 64.6% of West Moors went up between 1945 and 1982 and the peak was the late 1960s and early 1970s, so a whole run of houses shares the same board, the same joist centres and the same textured coating applied in the same decade. When one starts opening at the joints the rest are usually a season or two behind it. That is a cohort thing, not a fault in your house.

Our ceilings have a swirl pattern from the seventies. Options?

Three of them. Set over the top where the coating is well stuck and the pattern is shallow, scrape and set where it stands proud enough to grin through, or overboard and set where it is loose or you would rather not disturb it at all. Coatings from that period in West Moors can contain asbestos, so nothing from that era gets sanded or ground. Testing it first settles which of the three applies.

What can I check myself before calling you out?

Press the ceiling with a flat hand next to the crack. If it gives under light pressure the board or the plaster has lost its fixing and it needs taking off, not filling. Sight along the joint lines from the doorway with a low light raking across them. Then look at the loft hatch surround, because on a West Moors bungalow that hatch is often where warm air escapes and the staining starts.

How long does a whole bungalow take to re-skim?

Ceilings through a three bedroom bungalow generally take a small team most of a week, walls a further few days, and then the surface wants drying time before anything is put on it. Emptying the rooms in advance is what actually shortens it. Staying in the property and working around furniture stretches the same job by days, because every room has to be sheeted, cleared and put back in turn.

Free quote

Get a price for plastering in West Moors

Tell us the address and what the ceiling or wall is doing. We come out, sound it and put an itemised price in writing. No charge for either.