Patios in Bransgore
Plots here are big enough that the patio does not have to sit against the back wall, and putting it where the evening sun is changes how it has to be built.
The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.
Last updated
On a large Bransgore plot the patio can go wherever the sun is. Away from the house you lose the wall, the level and the gully that normally do half the thinking, so the edge restraint and the drainage have to be designed rather than assumed.
The jobs in Bransgore come in two shapes. A tired square of concrete flags behind the house that has sunk, gone green and holds a puddle by the door. Or a big lawn and a family who want a proper sitting area out in it, with steps down from the house and somewhere to put a table for eight.
Both start the same way. We walk the Bransgore plot, take a survey of the levels, look at the ground where you want to sit and work out what the water will do, then price the dig, the base, the edging, the drainage and the paving on separate lines in a written itemised quote. The site visit and the quote are free.
The work
Where the patio goes, and what that costs

Deciding where it should actually sit. Two in five houses in Bransgore are detached and the plots are generous, so the patio does not have to be against the back wall. We walk the garden with you, work out where the sun is at six and whether the ground there is firm or soft. A survey of the levels comes first and the paving last.
Against the house, or out in the garden. Against the wall you are tied to the damp proof course; we chalk the DPC on the brickwork and finish two courses below it, with the threshold detailed so nothing washes back to the door. Out in the garden that constraint goes and another arrives: no wall to fall away from and no gully, so the falls and the runoff are designed rather than assumed.
Topsoil, roots and what leaves the site. A lawn is not a base. Turf and topsoil are excavated to formation, and out in Bransgore that is often soft ground with roots through it. Old concrete and any made ground go the same way. Access is usually good enough for a machine, so the spoil leaves in a grab lorry or a skip rather than by barrow.
The base. Geotextile membrane, MOT Type 1 hardcore compacted in layers rather than tipped in one lift, a sand screed to level it, then a full bed of mortar under each slab with a slurry primer on the back. Dabs are quicker and they are why a slab ends up rocking, hollow and cracked. A proper mortar bed does not.
The paving. Porcelain is calibrated to a constant thickness and stays clean under trees. Indian sandstone is hand cut and suits an older brick elevation, limestone and granite wear hard, and travertine holds water. We bring samples and wet them, because dry paving in a yard is not the colour you will live with.
Edges with nothing to lean on. A patio in the middle of a lawn has no wall to restrain it, so the perimeter is held with a haunched kerb or an edging bedded in concrete, capped with a coping where it stands proud, and a gravel border run round for the mower. Steps and a low retaining wall follow the same rule.
Falls, and where the water is allowed to go. The surface falls at about one in eighty into an ACO channel, an existing gully or a soakaway set clear of any foundation. Where the runoff has nowhere to travel we build permeable, which is a different sub base rather than a different slab.
Jointing and the patio you already have. Joints take a brush in resin compound, a grout slurry or hand pointing in mortar. If your paving has only lifted or sunk in one bay we quote the lift and relay. If it is slippery with algae, or showing efflorescence and staining after a wet winter, that is cleaning and jointing rather than a rebuild.
How it runs
Building a patio that falls away from the house

Thomas comes out and looks at the garden, the back door and the damp proof course before anything else. On a Bransgore bungalow the patio doors often sit only a little above the ground, and a patio laid too high sends rain against the wall and under the threshold.
He sets the level from that. The written quote gives excavation and muck away, the sub-base, the falls and where the water goes, edgings and steps, the slabs, and the jointing as separate lines. Thomas stays in touch with you while it is dug out and laid.
Most plots in Bransgore are wide enough for a small digger to reach the back garden down the side of the house. If not, it is barrows through a side gate. Lawns and borders on the route are boarded. Spoil goes off site as we dig, and the garden is left tidy at night. Old rubble, a buried slab or a drain found in the ground is shown to you in a photo with a price, and waits for your answer.
Paving a back garden at ground level is normally permitted development, and the government guidance on when permission is required explains where a raised platform changes that. Bransgore has no conservation area. A retaining or garden wall has its own height rules. The level against the house is set by Approved Document C, and the authority is New Forest District Council.
Cost
Where the money goes on a garden patio
The clay under the lawn matters. Bransgore ground is clay. It dries and cracks in a hot summer and takes up water again in winter. A patio on a thin base moves with it, and slabs rock and crack. A deeper dig and a well compacted sub-base cost more, but the slabs stay put. The spoil is heavy, so muck away is a bigger line than on sandy ground.
Falls and the damp course. The patio has to fall away from the house and finish below the damp proof course. On a bungalow with low patio doors that can mean digging lower than you expect, a step down, or a drainage channel across the doorway to a gully.
What has to come out. An old concrete slab, a raised bed or a root run from a tree near the house is dug out and taken away by the load before anything goes down.
The slabs and the bed. Porcelain needs a primer and a full wet bed of mortar. Natural sandstone is thicker and varies. Concrete flags are simpler. The bed is where a cheap job fails: slabs on five dabs of mortar rock within a year.
Ask any other quote for the depth of excavation and the sub-base, whether the slabs are on a full bed or dabs, and where the water will go.
If it has become a hazard
Slabs that have rocked, lifted or turned green
If a slab has lifted or rocks underfoot, put a planter on it so nobody catches a foot. A step that has dropped by the back door is the one to deal with first. If the patio is green and slippery in winter, a stiff brush and water help until it can be cleaned properly.
Call us; do not wait on the form. Normal working hours are Monday to Friday, 8am to 6pm; if the phone is not answered, leave your number and we get back to you when we can put the tools down. We then lift and relay the worst slabs so the path is safe, and look at whether the base under the rest has moved with the Bransgore clay.
Worth knowing
A patio away from the house is a different build
Bransgore is a village of large plots. Two in five dwellings are detached, gardens run long, and there is usually somewhere better to sit than the strip of ground immediately behind the kitchen window. That freedom is worth using, and it changes the job.
Against the house a patio is half designed for you. The wall sets the level, the damp proof course sets the ceiling, the gully is already there. Move fifteen metres down the garden and all of that goes. The ground is softer because it has never been built on, the fall has to be invented, and there is no drain within reach.
None of that is difficult, but it has to be priced honestly. A patio out in a lawn needs more sub base than one against a house, a restrained edge on all four sides and a decision about drainage. If you are comparing quotes for a plot in Bransgore, ask what the perimeter is held with and where the runoff goes. Those answers tell you more than the name on the slab.
Who you are dealing with
Who sets the levels in your garden
Thomas Hannen's business does the work, and he comes to your garden himself to take the levels and price the patio. He is 5.6 miles away at the base in Boscombe. The work covers all of Bransgore, from Thorney Hill Road and Ringwood Road to Neacroft and Waterditch, in the New Forest District Council area.
Before you agree to anything, you can look up Bournemouth Roofing & Building Ltd, registered in England and Wales, company number 15471719. A verified Checkatrade customer marked the firm 10 out of 10. The visit to measure the garden is free, and you get the written, itemised quote for nothing. Long plots here usually come with long drives, and a driveway in Bransgore can be priced on the same site visit if you ask. Before you book a visit in Bransgore, you can read our customers' Google reviews, word for word, on our reviews page.
Planning at a glance
Do you need planning permission in Bransgore?
Most repairs in Bransgore need no application at all. What decides whether a change to the outside of your house does is who the council is, whether a conservation area or a listing applies, and whether the place sits in a protected landscape.
| Question | In Bransgore |
|---|---|
| Who decides | New Forest District Council is the planning authority for Bransgore. The National Park boundary runs close by, and the Park's property map shows which side an address falls. |
| Conservation area | None covers Bransgore, so a like-for-like repair is ordinary maintenance. |
| Listed buildings | Yes, there are listed buildings in and around Bransgore. If yours is one, work can need listed building consent. |
| Protected landscape | No National Park or National Landscape covers Bransgore. |
Questions
Questions about patios in Bransgore
Does a patio away from the house still need drainage?
Yes, a patio away from the house needs drainage even more. Against a wall the water has a gully to run to. Out in a lawn there is nothing, so it either falls to a soakaway set clear of any foundation or the patio is built permeable and takes the rain through the joints.
What holds the edge of a patio in the middle of a lawn?
A haunched kerb or an edging unit bedded in concrete all the way round. Without it the outer slabs creep, the joints open and the mower catches the corners. A gravel border keeps the grass off the paving.
Is the ground out in the garden weaker than next to the house?
Usually: it has never been built on, so there is topsoil, roots and soft ground under the turf. It comes out to formation and is replaced with compacted hardcore, which is why the dig on an open lawn is deeper than people expect.
Will a patio under trees stay green?
Anything under a canopy collects leaf litter and algae. Porcelain sheds it and washes clean, natural stone holds it and wants doing once a year. The fall and the jointing decide whether water sits there or leaves.
When could you start, and how many days would you be on site?
We book a start date at the quote so it is never left open. As for how long, most patios in Bransgore run to a week or ten days, and a large area with a soakaway, steps and an edge on four sides takes longer while the concrete cures.
Nearby, and next door
Patios near Bransgore
Nearby places we also cover for patios, with straight-line distances from Bransgore, and the other trades we offer in Bransgore itself.
Patios nearby
Our other trades in Bransgore
Patios guides
Driveway planning permission and where water goes Frost damage to brickwork: why it shows later Resin bound, block paving or tarmac comparedEverything we do in Highcliffe Patios, all areas Every area we cover
Free quote
Decide where it should go before you price the paving
Thomas walks the plot, takes the levels, works out the edge and the drainage and prices it in writing. The visit and the quote are free.
