Loft insulation in Bransgore

Cross laid to full depth, eaves kept open with vent trays, and the exposed perimeter finished properly, across Bransgore and the BH23 lanes.

The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.

Most lofts here are a day, and the day has a shape to it. Clear out, first layer between the joists, second layer across them, then the perimeter and the fittings, and everything that came out leaves on the van before we do.

Why people ring

One cold room, a draughty landing, and nobody sure why

Mineral wool insulation laid between and over the ceiling joists in a loft
Two layers, crossedThe second layer runs across the joists so the timber stops being a cold bridge.

The usual version is a single room that never behaves. It sits under the roof, it is slow to warm and quick to lose it, and the landing outside it has a cold current running along the floor that nobody can account for. Occasionally it is simpler than that and somebody has just looked through the hatch for the first time since they moved in.

What we do about it starts with a look rather than a figure. Depth measured in more than one place, a reach out to the wall plate to see whether the eaves are still open, a note of what crosses the ceiling and what is stored on it, and photographs so you can see the roof without going up a ladder. After that a written itemised quote with the clear out, the material and depth, the ventilation, the hatch and the disposal priced line by line. The site visit is free and so is the quote.

A day in the roof

What actually happens between the van arriving and the sweep up

Rigid insulation board fitted between the rafters in a loft
Board where depth is shortRigid board earns its place where the headroom will not take quilt.

First hour. Floors and stairs get sheeted from the door to the hatch, and crawl boards go up before anybody else does, because the ceiling below is plasterboard or lath and will not carry a knee. Anything you store up there comes down, the ladder is set properly and the loft is looked over once more in daylight so there are no surprises priced halfway through.

Late morning. The clear out. Old material has settled, gone patchy, been compressed flat under boxes and stopped short of the wall on at least one side. What is dry and sound stays and gets teased apart and levelled. What is damp, dusty or contaminated with droppings is bagged where it lies and carried down rather than dropped loose through the hatch.

Middle of the day. The first layer goes in between the joists, friction fitted so nothing is open at the timber. Mineral wool roll if there is a clear run, rockwool batts if the bays are all different, glass wool, sheep wool, loose fill poured into corners a roll will never sit flat in, PIR rigid board where headroom has run out. Then the second layer, cross laid across the joists at right angles so the timber is buried and stops carrying heat down into the plaster. About 270mm finished is the depth Approved Document L expects of a renovated ceiling under Part L, and the second layer is where most of the change in the U value comes from.

Afternoon. The edges, which is the slow part and the part that matters most. Material is carried out over the wall plate and stopped there, with a vent tray at each rafter keeping an air gap open above it so cross ventilation still runs from one eaves to the other. Pack that corner solid and the roof stops drying itself: water forms on the underside of the felt, the dew point moves into the layer, interstitial condensation collects unseen and black mould spreads along the rafters. BS 5250 is the code for managing moisture in a roof, and where the eaves are boxed in and cannot be reopened, a ridge vent or tile vents do the job instead. A breathable membrane alters the detailing rather than the requirement.

Before we leave. Fire rated covers over every recessed light and downlighter. Cable and wiring lifted and clipped above the new layer so nothing runs hot underneath it. Lagging on the cold water tank and its pipework, now that the space around them is properly cold. A rigid board fixed to the back of the hatch and a draught seal round the lining, which is the bit you feel on the landing that evening. Loft legs and a raised floor if you want storage, so the boarding and the platform clear full depth and the loft ladder still lands where it should. And where the roof is already a room in roof, the sloping ceiling and dormer cheeks are a separate warm roof job at rafter level, taped and sealed, which we would price as its own thing rather than fold into a day's work.

How it runs

From your call to a written price

A loft insulated at rafter level with the gable filled and a rooflight fitted
At rafter levelA room in the roof is a different job from a cold loft floor.

Same team from first visit to last, one person to ring, and no sub-contracting your work out to somebody you have never met. The quote is itemised, not a figure on the back of a card: the survey, clearing and bagging whatever is up there now, the material and its depth, keeping the eaves clear, the hatch and any pipework, and disposal on separate lines, so you can compare it properly against anyone else's.

Nothing is left open or unusable overnight. The site is swept at the end of each day rather than the end of the job, and what comes out leaves with us. If something turns up once we start that nobody could have seen, you get a photograph and a price before we carry on.

Insulation laid inside a loft is not development and needs no permission, which Planning Portal guidance on insulation sets out, so permitted development does not arise. Building control appears only where the roof itself is renovated, and regulation 23 then brings that whole element up to current standard. Bransgore has no conservation area of its own, there are listed cottages and farm buildings scattered around the parish, and New Forest District Council is the authority for anything touching one.

Cost

What decides the price of a loft

Plasterboard taped and jointed on a lined loft wall
Lined, then tapedWhere the loft becomes a room, the boarding and the joints come next.

No rate per square metre, because the floor area is the easy part and the awkward edges are where the time goes.

Getting to it. A bungalow with the hatch in the hall, a detached house set back down a lane, and a cottage with a loft you can only crawl through are three different jobs. A hatch on a landing you can stand a ladder under is one job. A hatch over a stairwell, a crawl space you can only move through on your knees, or a loft full of boarding that has to come up and go back, is time before any material is laid.

What is up there now, and what it is sitting on. Old material that has to come out, be bagged and taken away is a cost before anything new goes down, and so is a loft full of boxes that has to be emptied and put back. Joists at 400 centres with a flat run across them is a different afternoon from a trussed roof full of bracing.

Ventilation, and the edges nobody reaches. Insulation stops at the wall plate and the eaves have to stay clear, or you trade a warm bedroom for a wet roof. Getting depth right into the corners and around the hatch, boxing over downlighters and lagging anything that now sits in the cold, is most of the labour. Approved Document L sets what the work is expected to reach.

Comparing quotes? Ask what depth is actually being laid and in how many layers, whether the old material is coming out or being covered over, whether the eaves are being kept clear, what happens to anything you store up there, and whether the hatch and the pipework are included. Two quotes for the same job are usually two different jobs.

If the loft is wet

Water running off the felt, or mould on the underside

Ring rather than use the form. Droplets on the underside of the felt, black mould spreading across the roof timbers, or insulation that is visibly damp are all telling you the same thing: warm wet air is getting into a space that cannot breathe. That does not wait, because it is the timbers that pay for it. We look before anything is added, because putting more insulation into a loft that cannot ventilate makes it worse. Bransgore is close to us, so a wet loft here gets seen quickly rather than queued. The phone is answered 24 hours for emergencies; scheduled work runs Monday to Friday, 8am to 6pm.

Call now: 07435 839745

Open ground

The weather here comes off the south west, and it works on the edges

The exposed side of most houses along here faces south west, into the prevailing wind and the driven rain that comes with it. Roofs do not usually fail in the middle of a slope. They fail at the edges and the openings, where the wind can get under something, and that is as true inside the loft as it is outside.

Inside, wind coming in over the wall plate washes across the surface of loose material and takes performance out of the perimeter, which is precisely the strip that is hardest to reach and easiest to leave rough. So on an exposed roof the finish at the edge is done differently: the layer is cut in rather than pushed, closed off neatly against the wall plate, and held down where the air movement would lift it, with the air gap above still open. It is the opposite of the two things a rushed job does, which are to stuff the eaves solid or leave the last stretch loose and thin. Ask whoever else is quoting how they intend to finish the perimeter. On this side of the village it is the answer that matters.

Who you are dealing with

A local firm you can check

We cover Bransgore, Burley, Sopley, Thorney Hill, Hinton and the BH23 lanes around them, with New Forest District Council for planning and building control. You are dealing with Bournemouth Roofing & Building, the trading name of Bournemouth Roofing & Building Ltd, registered in England and Wales, company number 15471719, which you can look up in a minute. Thomas Hannen's business, and he is the one who comes out to price the job, not a salesman. A verified customer's 10 out of 10 on Checkatrade. The visit and the written quote are both free.

Questions

Questions people in Bransgore ask us

Can it really be done in a day?

Most can. What adds time is old material that has to come out and be bagged, a roof that drops into a crawl over an extension, boarding that has to come up and go back, or a loft full of things that need moving twice. All of those are visible at the survey, so the day we quote is the day you get rather than an estimate that grows.

Will we be in the way?

Not really. You need to be there to let us in, and after that the work is in the roof. The route in is sheeted, the hatch area is kept tidy, the floors are swept at the end of each day rather than at the end of the job, and the waste goes with us.

What if you find something once you are up there?

You get a photograph and a price before anything else happens. That is the rule whether it is a slipped tile letting water in, a fan discharging into the roof, or a cable in a state nobody should be laying wool over. Nothing gets covered up and nothing gets added to the bill without you seeing it first.

Does the wind up here mean we need a heavier material?

Not heavier so much as better finished. On an exposed roof the material is cut in tight at the perimeter and held rather than laid loose, because air moving over the surface is what takes the value out of it. That is detailing, not a different product, and it costs time rather than money.

Free quote

Get a price for your Bransgore loft

Tell us the address and which room is the cold one. We will get in the loft, measure what is really there, and put an itemised price in writing. No charge, no obligation.