Loft insulation in Bashley

Full depth over the joists, the eaves left open, and your storage raised back up on legs.

The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.

In a bungalow every room you heat sits under the loft, so the ceiling is the single biggest place the heat goes. Getting it up to full depth, cross laid over the joists, changes how the whole house feels rather than one cold bedroom.

Most calls here start the same way. The heating runs and the rooms still feel cold. Or somebody has been up for the Christmas boxes and found the wool squashed flat under the boards, with bare joists showing along the edges. Or the loft has gone damp and nobody can say when it started.

We come out and look properly before anyone talks about material. What is up there, how deep it really is once you push a rule into it, whether it reaches the wall plate, whether the eaves are still open, and what state the timbers are in. You get photographs and a written itemised quote with the survey, the depth, the ventilation, the boarding and the hatch on separate lines. The site visit and the quote are free.

The work

Rolls, boards and the corners nobody reaches

Mineral wool insulation laid between and over the ceiling joists in a loft
Two layers, crossedThe second layer runs across the joists so the timber stops being a cold bridge.

Getting the depth right. Most lofts around here have one layer laid between the joists and nothing over them, which leaves every joist bridging the cold through the ceiling. The second layer is cross laid at right angles over the top, so the timber is covered and the two layers together come to about 270mm, the depth a renovated loft is expected to reach under Approved Document L. Mineral wool roll does most of it, rockwool or glass wool depending on the product, batts where bracing chops the space up, loose fill where a roll will not go, sheep wool if you would rather have a natural product. Depth is only the means: what it buys is a lower U value across the ceiling, which is the biggest single heat loss in a bungalow, and that is what shows up on the heating bill and the EPC.

Trussed roofs, which is most of them here. A lot of Bashley went up in the 1990s, and a modern trussed roof is a lattice of thin timbers with bracing running through it. You cannot walk about in one, so the material goes in from the hatch outwards and the far corners take the time. The older cut roofs, where you can stand between the rafters, are the easy ones. Either way the access is one hatch, and working out of it is still work at height.

What comes out first. On the edge of the forest, lofts pick things up. Old material that is compressed, settled, patchy or contaminated with droppings is bagged and taken away before anything new goes down, and if birds or squirrels have had a way in we tell you where it is rather than laying wool over the top of it.

The eaves and the air gap. Insulation finishes at the wall plate. Vent trays keep the gap open above it so cross ventilation can carry moist air out under the ridge, and where a roof has no breathable membrane and only old felt underlay, that airflow and the ridge vents are the only things keeping condensation off the underside. Push the wool into the eaves and you have a wet roof by February.

The services. Recessed lights and downlighters get fire rated covers rather than wool over them, cables and wiring are lifted onto the insulation instead of buried in it, and the cold water tank and its pipework get lagged, because once the loft is insulated properly it is a genuinely cold space. In a bungalow that pipework often runs a long way, so it is worth doing all of it.

Chalet bungalows and rooms in the roof. Plenty of houses here have rooms built into the roof, which means sloping ceilings, dormer cheeks and little triangular voids behind the knee walls. That is rafter level work: rigid board such as PIR or Celotex cut tight between the rafters with a clear air gap above it, a layer under the rafters, and a taped vapour control layer. The voids behind the knee walls get insulated and the small doors into them draught sealed.

How it runs

From your call to a written price

Rigid insulation board fitted between the rafters in a loft
Board where depth is shortRigid board earns its place where the headroom will not take quilt.

Same team from first visit to last, one person to ring, and no sub-contracting your work out to somebody you have never met. The quote is itemised, not a figure on the back of a card: the survey, clearing and bagging whatever is up there now, the material and its depth, keeping the eaves clear, the hatch and any pipework, and disposal on separate lines, so you can compare it properly against anyone else's.

Nothing is left open or unusable overnight. The site is swept at the end of each day rather than the end of the job, and what comes out leaves with us. If something turns up once we start that nobody could have seen, you get a photograph and a price before we carry on.

Insulating inside a loft is not development and there is nothing to apply for, which Planning Portal guidance on insulation sets out. The New Forest National Park Authority is the planning authority here, so anything that changes the outside of the roof, a rooflight or a run of tile vents, is a different conversation, and the National Park Authority's interactive property map will tell you what applies at your address, because permitted development rights are narrower inside the Park than outside it. Building control still applies: regulation 23 means renovating more than half of a thermal element brings the whole of it up to the Part L standard. Insulation in a home is treated differently for VAT from ordinary building work under HMRC VAT Notice 708/6.

Cost

What decides the price of a loft

A loft insulated at rafter level with the gable filled and a rooflight fitted
At rafter levelA room in the roof is a different job from a cold loft floor.

No rate per square metre, because the floor area is the easy part and the awkward edges are where the time goes.

Getting to it. A bungalow with a landing hatch you can stand a ladder under, a 1990s detached with a trussed roof full of bracing, and a chalet bungalow with rooms already in the roof are three different jobs before a roll is opened. A hatch on a landing you can stand a ladder under is one job. A hatch over a stairwell, a crawl space you can only move through on your knees, or a loft full of boarding that has to come up and go back, is time before any material is laid.

What is up there now, and what it is sitting on. Old material that has to come out, be bagged and taken away is a cost before anything new goes down, and so is a loft full of boxes that has to be emptied and put back. Joists at 400 centres with a flat run across them is a different afternoon from a trussed roof full of bracing.

Ventilation, and the edges nobody reaches. Insulation stops at the wall plate and the eaves have to stay clear, or you trade a warm bedroom for a wet roof. Getting depth right into the corners and around the hatch, boxing over downlighters and lagging anything that now sits in the cold, is most of the labour. Approved Document L sets what the work is expected to reach.

Comparing quotes? Ask what depth is actually being laid and in how many layers, whether the old material is coming out or being covered over, whether the eaves are being kept clear, what happens to anything you store up there, and whether the hatch and the pipework are included. Two quotes for the same job are usually two different jobs.

If the loft is wet

Water running off the felt, or mould on the underside

Plasterboard taped and jointed on a lined loft wall
Lined, then tapedWhere the loft becomes a room, the boarding and the joints come next.

Ring rather than use the form. Droplets on the underside of the felt, black mould spreading across the roof timbers, or insulation that is visibly damp are all telling you the same thing: warm wet air is getting into a space that cannot breathe. That does not wait, because it is the timbers that pay for it. We look before anything is added, because putting more insulation into a loft that cannot ventilate makes it worse. Bashley is about ten miles from us, so we come out with the van loaded rather than making two trips, and a damp loft gets looked at before anything is ordered. The phone is answered 24 hours for emergencies; scheduled work runs Monday to Friday, 8am to 6pm.

Call now: 07435 839745

Worth knowing

In a bungalow the loft is also the cupboard

Bungalows are much the commonest house here, and they have two things in common. The ceiling area is roughly twice what the same floor area would be in a two storey house, so the loft is where the money is. And there is nowhere else to put anything, so the loft is the store cupboard as well.

Those two pull against each other, and the usual result is boarding screwed flat onto the joists with the insulation crushed underneath it. Compressed wool does very little, so you end up with a loft that looks finished and a house that still feels cold. The fix is a raised floor: loft legs standing off the joists, full depth carried on underneath, and the boards back down on top with the air gap kept clear at the edges.

It is worth deciding at the survey how much of the loft you actually want as storage, because a boarded platform over part of it and full depth everywhere else is cheaper and warmer than boarding the lot. The hatch and the loft ladder get sorted at the same time, since a bungalow hatch opens straight into the room you live in and an unsealed one draughts all day.

Who you are dealing with

A local firm you can check

We cover Bashley, Wootton, Tiptoe and the BH25 addresses towards New Milton, with the New Forest National Park Authority for planning and New Forest District Council for building control. You are dealing with Bournemouth Roofing & Building, the trading name of Bournemouth Roofing & Building Ltd, registered in England and Wales, company number 15471719, which you can look up in a minute. Thomas Hannen's business, and he is the one who comes out to price the job, not a salesman. A verified customer's 10 out of 10 on Checkatrade. The visit and the written quote are both free.

Questions

Bashley questions we get asked

How deep does it need to be?

About 270mm of mineral wool, and in two layers rather than one. The first goes between the joists and the second is cross laid over the top, which is what stops the timber carrying the cold through the ceiling.

Can I still board the loft out afterwards?

Yes, on loft legs. They raise the deck above the insulation so the depth stays and you keep the storage. Boards screwed straight down onto the joists squash the wool and undo most of the work.

How long does a bungalow loft take?

Usually a day. A trussed roof worked from the hatch outwards, old material to clear and bag, or boarding to lift and put back will stretch it. We give you the day at the quote.

Do I need permission in the National Park?

Not for the insulation itself. It is inside the building, so it is not development. Anything that changes what the roof looks like from outside, a rooflight or tile vents, is where the National Park Authority comes into it.

The loft smells and there are droppings up there. What happens?

It comes out before anything goes in. Contaminated material is bagged at the hatch and leaves with us, and we find where they were getting in rather than laying new wool over the problem.

Free quote

Find out what is really in your loft

We come out, measure what is up there and put the depth, the ventilation and the boarding in writing. The visit and the quote are free.