Flat roofing in Sixpenny Handley
Flat roof repairs, re-covering and warm roof build ups in Sixpenny Handley and the SP5 villages. Free site visit, free written itemised quote.
The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.
Last updated
When you phone about a flat roof in Sixpenny Handley, the first thing we want to know is where the water is supposed to go. Usually the answer explains the leak, and it costs a repair, not a new roof.
The signs in Sixpenny Handley are usually plain enough. A windy night has torn a corner up and left it flapping. A ceiling has marked and the mark has not dried out since. Or the water simply is not clearing off the roof any more. The roofs in Sixpenny Handley are the usual village mix: a garage, a rear extension, a utility off the kitchen, a porch, a bay top, or the flat piece between two pitched roofs where something was added later. Each of those complaints is worth looking at properly, because on a flat roof what you can see and what is actually wrong are often two different things. We get up there safely, follow the falls to the outlet, check every abutment, and photograph what we find so the quote makes sense when you read it. If a torn corner is letting rain into the room below, ring 07435 839745.
In practice
What each job involves, and how long it takes

A repair, and what that means. Clearing a silted outlet is often an hour. Patching a cracked fold, a burst blister, an opened lap or a loose edge trim is a morning. Cutting out a perished upstand and forming it again is most of a day.
Between them, those repairs cover most of what a flat roof ever needs, and none of them is a re-cover. We follow the falls back from the stain rather than opening the roof up where the ceiling has marked.
A re-cover, and what that means. The old surface comes off, the deck is inspected and the falls are corrected, and only then does the new covering go down. EPDM rubber, one bonded sheet with no seam across the field, for a plain garage. GRP fibreglass, laid wet and cured to a single skin with the trims part of it, for anything that gets walked on. Torch on felt, three layers under a mineral cap sheet, for a roof full of detail. Single ply, hot air welded, for a large span. A small roof can be a day, a garage or an extension two to three working days.
A new deck, and what that means. Plywood, OSB and chipboard are the usual decks, and it is the chipboard that fails. Firm decking gets covered over. Soft decking is taken out, the joists inspected and new boards laid. This is the point at which the falls get set with firrings or with insulation cut on a taper, so water leaves the roof instead of sitting on it. It is also the sensible moment to move the insulation above the deck: rigid PIR with a vapour control layer beneath it, timber held above the dew point, interstitial condensation designed out. BS 6229:2025 on flat roofs explains why, and Approved Document L applies wherever a room sits below.
And the detailing, which is priced one item at a time. Upstand and chased cover flashing. Lead apron where lead is already there. Cavity tray where the wall has a cavity. Parapet and coping. A kerb built for a rooflight, a lantern, a Velux, a hatch, a soil pipe or a vent pipe. Drip and edge trim. Gutter, hopper and downpipe below. Every one of those is somewhere a leak can start, and every one is a separate line on the quote.
How it runs
Re-covering a flat roof up on the Chase, step by step

A flat roof in Sixpenny Handley, on the Chase, is usually a garage, a kitchen extension or the link between an old house and a newer bit, and Thomas Hannen treats each one differently. He gets up on it, walks it for soft spots and checks the upstands where the covering turns up a wall. He looks at the outlet and the edge trims, and if he needs to see the deck he lifts a small corner.
His written quote lists the tower or scaffold, stripping the old felt or asphalt, any new deck or firrings, insulation, the membrane, each upstand, outlet and trim, and the skip, so nothing is hidden in one total. Start to finish, it is one written price. Wind across the open fields around Sixpenny Handley will lift an unfixed sheet, so each day's section is sealed before we leave and the roof is never open overnight. Old felt goes in our skip and the ground is swept every evening. Should the deck prove rottener than it looked, Thomas sends a photo with the extra cost and waits for your go-ahead.
A re-cover in the same form is maintenance, and Planning Portal guidance marks the limit. A new deck over a room brings in Dorset Council building control, by building notice or an application with full plans. No conservation area covers Sixpenny Handley. If the building is listed, a change of material needs listed building consent before any work starts.
Cost
Deck, falls and access: the real cost of a flat roof

No flat roof is priced by the square metre, because the covering is the easy part. What sits under it, and how you get to it, is what moves the price.
Reaching it. In Sixpenny Handley, a garage with a yard beside it takes a tower in an hour. An extension at the back, with the only way in through the house, means every roll and every bag of old felt goes through your hall. The platform stays up the whole time the deck is open, and the work at height rules decide what it has to be, so it has its own line.
The state of the deck. Chipboard on a Sixpenny Handley roof that has soaked up years of small leaks sags between the joists and has to come out. Sound ply can take a new covering. Nobody can tell from the ground, which is why Thomas lifts a corner before he writes a figure.
Where the water goes. A roof laid dead flat ponds, and standing water finds the weakest seam. Putting a fall back in with firrings, running to an outlet that works, adds time and saves the roof. Each upstand and edge trim is its own item, because that is where old flat roofs leak.
The system. Torch-on felt in layers, a single ply membrane and a liquid coating are different jobs at different prices.
Any other quote should answer whether the deck is being replaced or covered over, whether firrings are going in to correct the fall, and whether the scaffold and skip are included.
If it is coming through
A split or lifted flat roof letting water in
Get a bucket under the drip and, if the ceiling is bulging, keep everyone out of that room. Once a flat roof has split, blistered or peeled back from an upstand, rain goes straight into the ceiling below, and the deck carries on rotting after the weather clears.
Please do not climb up and walk on it, as a soaked deck can give way. On the first visit we get a temporary cover on and start drying it out, and the permanent repair is priced when we know how far the wet has spread through the boards. Booked jobs run Monday to Friday, 8am to 6pm. With water coming in, call rather than using the form. If the phone goes unanswered, we will call you back as soon as we are able.
Worth knowing
Up on the Chase, a flat roof can be looked down on
Sixpenny Handley and its neighbours sit in the Cranborne Chase National Landscape, where the way things look in open country carries more weight than it does in a town. On most flat roofs that changes nothing, because a roof at the back of a house is out of sight from anywhere public and a like for like re-cover is simply maintenance.
But this is high, open ground with footpaths and lanes above the houses, so a flat roof here is more likely than most to be seen from above rather than not seen at all.
Where that is true, the finish is worth a thought. A bright white or a glossy surface reads for a long way across the landscape around Sixpenny Handley, where a dark grey mineral cap sheet or a matt finish disappears. The same applies to a big rooflight or a lantern, which throws light upward at night in a place where people notice it. None of this is a rule and none of it stops the work. It is simply the difference between a roof nobody looks at twice and one that stands out, and we would rather raise it before you choose than after it is on.
Who you are dealing with
Your flat roofer for Handley and the SP5 villages
Flat roofs in Sixpenny Handley, Pentridge, Woodyates and the rest of SP5 on the Chase are a 17.1 mile drive for us from Boscombe, and Dorset Council covers planning and building control. The company behind the name is Bournemouth Roofing & Building Ltd, number 15471719 on the register for England and Wales. Before you book a visit in Sixpenny Handley, you can read our customers' Google reviews, word for word, on our reviews page.
Its owner, Thomas Hannen, gets up on your flat roof and prices it himself rather than sending somebody. There is a 10 out of 10 on Checkatrade from a verified customer. Nothing is charged for the visit or for the itemised quote you get in writing.
Planning at a glance
Do you need planning permission in Sixpenny Handley?
Most repairs in Sixpenny Handley need no application at all. What decides whether a change to the outside of your house does is who the council is, whether a conservation area or a listing applies, and whether the place sits in a protected landscape.
| Question | In Sixpenny Handley |
|---|---|
| Who decides | Dorset Council is the planning authority for Sixpenny Handley. Dorset Council's heritage pages set out what it controls. |
| Conservation area | None covers Sixpenny Handley, so a like-for-like repair is ordinary maintenance. |
| Listed buildings | Yes, there are listed buildings in and around Sixpenny Handley. If yours is one, work can need listed building consent. |
| Protected landscape | Inside the Cranborne Chase & West Wiltshire Downs National Landscape (formerly AONB), so anything visible from outside gets more attention. |
Questions
Questions about flat roofs in Sixpenny Handley
You are a fair way out. Will you still come and look?
Yes. The site visit and the written quote are free wherever you are on our patch, and distance does not change that. We will give you a realistic day rather than promise a morning, and anything actively letting water in gets seen ahead of a job that can wait.
Can a flat roof last as long as a tiled one?
Not usually, but it lasts a great deal longer when it is laid to a proper fall with the detail done well. Most flat roofs that fail early do so because water sat on them, not because the covering itself wore out. That is why we would rather correct the falls than simply re-surface.
What do I ask a competing quote?
Ask which system it is and how many layers. Ask whether the deck is being renewed or covered over, and whether the falls are being corrected. Ask how the upstands, outlets and edge trims are detailed, and whether the access and the disposal are in the figure.
How long does the whole thing take?
A repair is often a single day's work. A garage or a small extension is two to three working days. Renewing the deck, adding firrings or forming a kerb for a rooflight adds to that, and a bonded system needs a dry deck, so the forecast has a say in when we start.
Nearby, and next door
Flat roofing near Sixpenny Handley
Nearby places we also cover for flat roofing, with straight-line distances from Sixpenny Handley, and the other trades we offer in Sixpenny Handley itself.
Flat roofing nearby
Our other trades in Sixpenny Handley
Flat roofing guides
GRP, EPDM or felt: which flat roof covering? Snow on a flat roof or a conservatory Warm roof or cold roof: which do you need?Everything we do in Verwood Flat roofing, all areas Every area we cover
Free quote
Get a price for your Sixpenny Handley flat roof
Tell us the address and what you have noticed. We will come out, check where the water is meant to go, and put an itemised price in writing. No charge, and no obligation.