Flat roofing in Post Green

Garage, link and extension roofs around Post Green and Lytchett Minster, looked at from the roof and priced in writing.

The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.

Last updated

Most of the flat roofs around Post Green are garages, link roofs and single storey back extensions, and renewing the covering on one is maintenance. The Lytchett Minster conservation area only starts to matter when the roof changes how it looks.

The housing in Post Green is mostly post war, with a lot of bungalows, and the flat roofs came with the garages and the extensions rather than with the houses. They are all reaching a similar age. The signs are a ceiling stain under a back room, felt gone grey and split along a lap, or a garage roof that has started to sag in the middle.

We come out, get on it, lift a corner where we safely can, and photograph the deck and the outlet so you are looking at the same evidence we are. If water is coming through the ceiling under one of these roofs now, ring 07435 839745.

What we do

Garage roofs, link extensions and outbuilding roofs

A felt flat roof on an extension, with the parapet coping being bedded on top (illustrative photo for flat roofing in Post Green)
It fails at the edgeUpstands, copings and the lead. Almost nothing fails in the middle. Illustrative photo.

The garage comes first. Most houses in Post Green have one. A felt roof of this age fails at a lap that has split, a blister lifted off the deck, a seam gone between two sheets, or a trim whose fixings have pulled.

Each of those is a cut out, a prime and a welded patch under a fresh cap sheet, and it is a morning's work. What we check before agreeing to it is the board underneath, because a garage roof that has begun to dip has a wet deck, and the dip then holds the water that caused it.

The link. The strip of flat roof joining a Post Green bungalow to its garage is the one that leaks most and gets looked at least. It has an upstand on both sides, a fall of almost nothing, and an outlet that is usually behind a downpipe nobody has cleared. GRP fibreglass is laid wet onto the deck and is the better answer where there is that much to form round. On a plain run, EPDM rubber gives you a single sheet with no joints across the field.

The extension. Larger, usually over a room, and the one where the build up decides whether you are happy in five years. A built up three layer torch on felt system is still a sound roof and single ply suits the wider spans, but the question that matters is warm or cold. PIR insulation above the deck with the vapour control layer under it keeps the dew point out of the timber and stops the condensation and interstitial damp that get reported as a leak. A ventilated cold roof is fine over a store. BS 6229 sets the standard.

Decks and falls, on all of them. Plywood, OSB or chipboard, and chipboard swells the first time water reaches it. Where a roof was laid level, firrings go over the joists or tapered insulation does the same job, so water gets to the rainwater outlet instead of standing. Ponding does not come through a sound covering, but it keeps grit and moss on the surface and it is where the first split shows. A bubble underfoot means the deck has gone.

And the detail work. A lead cover flashing dressed into a chase at the abutment, the drip and apron at the front edge, the kerb round a rooflight, a parapet, a coping and a cavity tray formed rather than sealed, and a collar round every skylight, lantern, Velux, hatch, soil pipe and vent pipe. The gutter, hopper and downpipe are cleared and run through, because a good share of reported roof leaks are exactly that. A garage is a day, an extension with a new deck two or three working days.

How it runs

Re-covering a garage, link or extension roof

A stripped pitched roof with breathable membrane and battens going back on (illustrative photo for flat roofing in Post Green)
Stripped back firstWhatever goes on top, what is underneath decides the price. Illustrative photo.

The flat roofs around Post Green are mostly over garages, over the link joining a bungalow to its garage, and on rear extensions and dormers added to chalet bungalows. Thomas comes out, gets up on the roof, pushes a knife into the covering or lifts an edge to see the deck, and prices it himself. Stripping and re-covering sit on that one quote.

His written quote lists access, stripping the old felt, any new deck or firrings, the insulation, the membrane (EPDM, GRP or torch-on felt, whichever suits the roof), each upstand, outlet and edge trim, and disposal. Most Post Green roofs come off a tower on the drive. The roof is never left open overnight, and the old felt leaves with us. If more of the deck is rotten than the test showed, you get photographs and a figure for the extra before we cut it out.

Planning sits with Dorset Council. Some of the older village lies in the Lytchett Minster conservation area, so ask them if your address is one of those. Putting back the same kind of covering is maintenance, not development; the Planning Portal covers where permitted development runs out. Where a building is listed, get listed building consent settled before ordering materials. Once most of the covering is being replaced, Part L treats the roof as a renovated thermal element, so the insulation levels in Approved Document L apply and building control hears about it through a building notice.

Cost

What makes one flat roof dearer than the next

A finished grey flat roof with three rooflights set into it (one of our own jobs, shown for flat roofing in Post Green)
Falls, then coveringThe water needs somewhere to go before a roll comes off the van. Photo from one of our own jobs.

The deck comes first. A Post Green garage or link roof from the seventies was usually decked in chipboard, and chipboard that has taken water swells and crumbles. Sound ply or boards can be re-covered; soft chipboard has to come off and be replaced. That is the biggest variable, and why the deck is checked first.

Warm roof or not. Over an unheated garage the insulation question hardly arises. Over a kitchen extension or a dormer bedroom, renewing the covering means insulation boards on top of the deck to meet Part L, which raises the roof edge, the upstands and every trim.

Falls and the outlet. A lot of link roofs in Post Green were laid dead flat, or drain into a gutter on the bungalow that is now blocked. Firrings to put a fall in, and a new outlet, cost more than the membrane itself. Each upstand against a wall needs a lead or membrane flashing chased in.

Access. A garage beside the drive is a tower job. A dormer on a chalet bungalow means scaffold round the main roof. The work at height rules set that, and it is priced as its own line.

Before you choose, ask any other quote which membrane and how many layers, whether the deck is being replaced or overlaid, and whether the falls are being corrected with firrings.

If it is coming through

Water coming through a garage or extension roof

Ring rather than filling in the form. A split, a blister that has burst, or a lap lifted at an upstand puts water straight through, and on an extension that means a kitchen ceiling. Move anything electrical out of the way and put buckets down.

The first visit gets a temporary patch or a weighted sheet over it so it stays dry, and then we check how much of the deck is wet before pricing. Post Green is about nine and a half miles out along the Poole road from our base. Booked jobs run Monday to Friday, 8am to 6pm. If water is coming in, a call is the way to reach us, and a missed one is returned as soon as we can.

Call now: 07435 839745

Worth knowing

Inside the conservation area, like for like keeps it simple

Part of this area falls inside the Lytchett Minster conservation area, and it catches people out because they expect it to be about listed buildings. It is not. It is about the character of the place, and it bites on what a roof looks like rather than what it is made of underneath.

Putting the same covering back is maintenance and needs nobody's approval. Changing the appearance of a roof that can be seen from a road or footpath is where a question arises, and that includes a new rooflight or a lantern.

The practical route is to settle that before you settle the specification. Most of these Post Green flat roofs are garages and back extensions that nobody can see, and if yours is one of them we will say so on the visit and you can choose whatever suits the roof. Where it is visible, we will put the like for like option on the quote next to the one you had in mind, so you are comparing a possible application against a covering that raises no question at all.

Who you are dealing with

Who you deal with for your flat roof

Post Green is about nine and a half miles from Boscombe, where our base is. We cover it along with Lytchett Minster, Upton, Lytchett Matravers and the BH16 side of Poole, where the council for planning and building control is Dorset.

The company is Bournemouth Roofing & Building Ltd, number 15471719, registered in England and Wales. Its owner, Thomas Hannen, climbs up to check the deck and prices your roof himself. On Checkatrade a verified customer marked us 10 out of 10. The site visit costs nothing and neither does the written, itemised quote. Before you book a visit in Post Green, you can read our customers' Google reviews, word for word, on our reviews page.

Planning at a glance

Do you need planning permission in Post Green?

Most repairs in Post Green need no application at all. What decides whether a change to the outside of your house does is who the council is, whether a conservation area or a listing applies, and whether the place sits in a protected landscape.

The planning position in Post Green, from council and national records.
Question In Post Green
Who decides Dorset Council is the planning authority for Post Green. Dorset Council's heritage pages set out what it controls.
Conservation area Yes: Lytchett Minster Conservation Area. Check whether your street is inside the boundary before changing anything visible.
Listed buildings Yes, there are listed buildings in and around Post Green. If yours is one, work can need listed building consent.
Protected landscape No National Park or National Landscape covers Post Green.

Questions

Questions about flat roofs in Post Green

My garage roof has started to dip in the middle. Is that serious?

Yes, a dip in a garage roof usually means the deck is wet rather than the covering worn out, and a dip holds water which makes it worse. Chipboard that has swelled does not dry back. We would lift a corner and tell you on the day whether it is a deck job or a covering job.

Is a repair worth doing, or should it all come off?

If the covering still bends and the failure is at a lap, a seam or an upstand, a repair is honest value and we would rather do it. Once the material cracks when it is lifted, or the deck moves underfoot, a patch is sitting on something that is going.

Do I need permission in the conservation area?

Not for a like for like re-cover. It is a change of appearance, or a new rooflight on a roof that can be seen from a public road, that raises the question, and Dorset Council is who you ask. On a listed building, ask before anything at all is ordered.

How long does the work take?

A single garage is a day. An extension needing a new deck, firrings to correct the falls and a rooflight formed round is two or three working days. We will not open a deck we cannot make watertight again before we leave.

Nearby, and next door

Flat roofing near Post Green

Free quote

Get a price for your Post Green flat roof

Tell us the address and what you have noticed. We will get up and look, check the deck and the outlet, and put an itemised price in writing.