Mortar is due for replacing when it has weathered back behind the brick, comes away as sand under a car key, or sounds hollow when you tap along a course. In Winfrith Newburgh the job is hand raking and a lime mix, and the harder question is what goes back, because the whole village is a conservation area and the finish of the joint is the part everybody sees. A wall that has cracked or bulged needs rebuilding.
Winfrith Newburgh walls go at the joint, behind hard cement and at the stack. Joints on a cottage frontage gone friable, dropping sand onto the path every dry spell. A grey band of hard cement standing proud of soft red brick that is crumbling away behind it. And a stack shedding mortar and cracked flaunching into the gutter, which on a thatched roof nobody should leave.
None of those is a wall problem. All three are mortar, put right with a chisel, a matched mix and enough time. We look at every elevation of a Winfrith Newburgh house rather than the one you noticed, scrape two or three joints to find how deep the decay goes, tap for anything parted from the brick behind the face, and photograph it. You get it back in writing, itemised elevation by elevation, with the faces we would leave for a few more winters marked as such. The site visit and the written quote are free.
The work
What we find in the joints around the village

Hand raking, and why no disc goes near it. Almost everything old in Winfrith Newburgh is solid wall with no cavity, built in lime mortar and meant to shed water back out through the joint rather than hold it out at the face.
On a Winfrith Newburgh wall we rake those joints with a plugging chisel and a hacking iron, back to sound material and roughly twice the width of the joint. The arris of a handmade brick is not straight, so an angle grinder or disc cutter widens the joint permanently and takes the edge off the brick. That damage does not grow back.
The mix, matched and not just chosen. Colour in a mortar comes from the sand, not the binder, so we take a sample of sound original from a sheltered joint, break it down and mix against it. On Winfrith Newburgh's pre-1919 fabric that means a natural hydraulic lime or lime putty gauged softer than the brick, so the mortar stays the sacrificial part of the wall. A trial panel goes up on a discreet elevation and dries before anybody approves it, because wet mortar reads darker than it will finish. Joints are damped down, filled and brushed back once the mix has taken up.
Cement coming back out. A good many walls in Winfrith Newburgh were pointed in sand and cement, and that is the fault to put right first. A hard joint stops the wall drying through the mortar, so moisture leaves through the brick face instead and a frost lifts the face off. The tell is pointing standing proud and sound while the brick between it is eaten away. Getting it out is slow hand work and the only thing that fixes the cause.
Spalled faces and flint bedding. Where a face has blown we cut the brick out whole and turn or replace it from reclaimed stock, rather than filling the hollow with mortar, which never matches and drops out. Where a Winfrith Newburgh wall is flint banded with brick, the joint is set back at the face of the flints so the stones read as stones.
Stacks, and the thatch under them. A Winfrith Newburgh stack takes weather on four sides with nothing warming it from inside, so its joints go friable years ahead of the house, and the flaunching around the pots cracks after them. That is work at height off a platform. Where the roof below is thatched, the access and the sheeting are agreed with you and with the thatcher before the quote.
How it runs
Lime repointing on walls facing the prevailing weather

Thomas comes out to Winfrith Newburgh and checks the joints: how deep they have washed out, whether the mortar is lime or later cement, and whether the brick or stone faces have spalled. His quote gives the scaffold or tower, raking out, the mix, how much of each wall, bricks to replace and clearing up as separate lines.
On Winfrith Newburgh walls joints are raked by hand to a proper depth, not cut with a disc. The new lime mortar is matched for colour and strength and kept damp under hessian while it cures, which matters in wind and sun. We plan the work for the drier months where we can, because lime does not like frost. Scaffold or a tower goes on boards where the ground is soft. Waste leaves with us each day. Any brick that crumbles once its joint is open is shown to you with a replacement cost before it comes out.
Repointing like for like is repair, not development. On a listed building, a change of mix, colour or joint profile needs listed building consent from Dorset Council, because the Act covers works affecting character; even like-for-like work is worth confirming with the conservation officer first. Ask the council about a conservation area too.
Cost
What moves the price of repointing

We never price by the square metre, because the area tells you little until somebody has looked at the joints. Access. A front wall on the village street, a long farm range you can reach from a yard, and a low flint and brick wall by a lane each need a different set up. The work at height rules mean the scaffold is priced where you can see it.
How deep and how hard. Washed out lime comes back quickly. Hard cement pointing on soft brick has to be cut out carefully, and that is slow.
Exposure. The south west faces take the driven rain, and the code of practice for assessing wall exposure to wind driven rain is why the mix and the joint finish matter most on those elevations.
Matching. Too strong a mix holds water in soft brick, and the face comes off in a hard frost. Lime is right on most old walls in Winfrith Newburgh, and it is matched to the sand and colour already there.
Spalled brick and flint. Each brick replaced and each flint reset is counted.
Season. Lime work waits for frost free weather, so an early call gets a better slot.
Ask any other quote whether the joints are raked by hand or by disc, what the mix is and whether it was matched, and whether the scaffold is in.
If water is getting in
Driven rain coming through open joints

Call instead of using the form. Washed out joints let driven rain straight through a solid wall to the inside, and on a chimney it gets behind the flashings too. Move anything that could be damaged and keep the room aired.
On the first visit we look at where it is coming in, sheet the worst or point it temporarily, and price the full elevation once it has dried enough to judge. If the roof above is thatched, tell us when you ring. Booked repointing runs Monday to Friday, 8am to 6pm. If water is getting in, phone, and if nobody answers we ring back as soon as possible.
Worth knowing
The joint profile is the part a conservation area notices
A conservation area does not stop you repairing anything. It controls how the building looks when you have finished, and on a repoint the look is set by the colour of the mortar, which comes out of the sand, and by the profile of the joint. Most quotes talk about colour and say nothing about profile, and profile is what changes an elevation.
The historic finish on this fabric is flush, or a shade recessed so each brick and each flint reads as its own shape with a shadow line round it. What tends to go back instead is a weather struck joint cut off at an angle, or a ribbon of mortar smeared proud of the face. Both turn a soft, irregular old wall into a hard grid seen from thirty yards down the road, and a proud joint sheds water onto the brick below rather than off it.
So get the sand, the mix and the joint profile written into the quote and not left to preference on the day. We put all three in ours, and where an address is listed we agree the specification before any scaffold is booked.
Who you are dealing with
Who repoints your walls in Winfrith Newburgh
Winfrith Newburgh is 19.8 miles from our base in Boscombe. We repoint in the village, Wool, West Lulworth, Owermoigne and Crossways, broadly DT2 and BH20, with Dorset Council as the planning authority. The company is Bournemouth Roofing & Building Ltd, registered in England and Wales, company number 15471719. Before you book a visit in Winfrith Newburgh, you can read our customers' Google reviews, word for word, on our reviews page.
It is owned by Thomas Hannen, who looks at the joints in person and writes the price. On Checkatrade, a verified customer gave us 10 out of 10. Both the visit and the itemised written quote are free of charge.
Planning at a glance
Do you need planning permission in Winfrith Newburgh?
Most repairs in Winfrith Newburgh need no application at all. What decides whether a change to the outside of your house does is who the council is, whether a conservation area or a listing applies, and whether the place sits in a protected landscape.
| Question | In Winfrith Newburgh |
|---|---|
| Who decides | Dorset Council is the planning authority for Winfrith Newburgh. Dorset Council's heritage pages set out what it controls. |
| Conservation area | Yes: Winfrith Newburgh Conservation Area. Check whether your street is inside the boundary before changing anything visible. |
| Listed buildings | Yes, there are listed buildings in and around Winfrith Newburgh. If yours is one, work can need listed building consent. |
| Protected landscape | Inside the Dorset National Landscape (formerly AONB), so anything visible from outside gets more attention. |
Questions
Questions about repointing in Winfrith Newburgh
Which joint finish should go back on a village cottage?
Whatever the wall already carries, and on the older fabric here that is nearly always flush or slightly recessed, not struck at an angle. We match it off a sound stretch of the same wall and show you the profile on the trial panel first. A previous repair that left a proud ribbon of mortar comes back so the whole face reads the same.
Can a chimney over thatch be repointed safely?
Yes, but it wants planning, not improvising. The stack is repointed and the flaunching renewed off a scaffold, with the thatch sheeted and the route up agreed first. No cutting disc comes out on a job like that, so the joints are raked by hand, which is what the soft brick wants anyway.
How far back does the old mortar have to come?
Roughly twice the width of the joint, and back to sound mortar rather than to a set measurement, so the depth varies across a building. Too shallow gives a skim of new mortar with nothing to hold on to, too deep loosens the brick. That judgement is why it is done by hand.
Our pointing was redone about ten years ago and it has failed again. Why?
Usually because the mix was too strong. A cement mortar in a solid wall traps the moisture that used to leave through the joint, so it leaves through the brick face instead and takes the surface with it. Sometimes the joints were never raked out, only filled over the top.
Do we need permission just to change the mortar colour?
Inside a conservation area a change of appearance on a visible elevation is the sort of thing Dorset Council takes an interest in, and mortar colour is appearance. On a listed building the pointing is part of the listed fabric and consent comes first. Putting back the same sand, mix and profile is maintenance and needs nothing, one more reason to match.
Nearby, and next door
Repointing near Winfrith Newburgh
Nearby places we also cover for repointing, with straight-line distances from Winfrith Newburgh, and the other trades we offer in Winfrith Newburgh itself.
Repointing nearby
Our other trades in Winfrith Newburgh
Repointing guides
Lime or cement mortar: which do you need? Reading a repointing quote: rake out Listed building consent for repointing and re-renderingEverything we do in Wareham Repointing, all areas Every area we cover
Free quote
Get the mix and the profile in writing
Thomas comes out, scrapes a few joints, photographs every elevation and prices it itemised, with the sand and the joint finish written in. Free.