Repointing and mortar matching in West Parley

Bungalow elevations you can reach off a tower, wet ground at the base of the wall, and a mortar mix chosen for both.

The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.

On a West Parley bungalow the pointing that fails first is almost never up at the eaves. It is the bottom few courses, where splash off a path, a raised bed or a patio laid up against the house keeps the joints wet for weeks at a time and never lets them dry out properly.

That is worth knowing before you get anybody up a ladder. The calls we take here follow a pattern: a green, soft strip of mortar along the base of a wall, a joint you can push a screwdriver into behind the flower bed, a chimney shedding grit into the gutter, or a run of open joints on the one gable that faces the open ground.

We survey the whole outside rather than the wall you have spotted, scrape a few joints to find the real depth of the decay, look at where the water is coming from as well as what it has done, and photograph all of it. Back comes a written itemised quote broken down by elevation, and if part of it can safely wait a few more winters we say so rather than quietly including it.

The work

Low walls, long elevations and the joints that go first

Repointing a brick wall by hand, mortar being struck into a raked-out joint
Struck by handOne joint at a time, filled and struck so the face sheds water.

Bungalow brickwork, and why it is a different job. More than a third of the homes in West Parley are bungalows, and a bungalow presents a long, low run of wall with almost all of it inside reach of a tower or trestles. That takes the biggest single cost out of a quote, since a scaffold is only needed for the stack. It also puts the whole elevation at eye level, so a poor colour match or a sloppy joint profile is on show in a way it never is on a two storey house. We agree the finish first and strike it to whatever is already there, usually bucket handle or weather struck on this stock.

The base of the wall. The commonest job we do here is the bottom four or five courses, where ground levels have crept up over fifty years of patios, block paving and borders. Wet joints go friable, then hollow, then wash out, and the salts carried up with the damp crystallise in the mortar and break it apart. We rake out to about twice the joint width, damp the joints down, fill, and brush the face back once the mix has taken up. Where the ground is bridging the damp proof course we say so, because pointing without dropping that level is a repair with a short life.

Sixties and seventies cavity work. Nearly six in ten homes here went up between 1945 and 1982, peaking in the late sixties and early seventies: fired brick, cavity built, in a cement and sand mortar. Those joints do not wash out the way lime does. They erode at the arris until water stands in them, then frost lifts the mortar and takes brick faces with it, which is the spalling you see under sills and at the corners of a bay. Blown faces are cut out and replaced rather than filled, matched on a sample off the wall and a trial panel you look at first.

Stacks, and the little bit of solid wall that is left. A bungalow chimney is short, squat and exposed on all four sides, with nothing warming it from inside. Its joints go long before the house does, and a stack repoint with the flaunching renewed is a proper access job even on a single storey building. A small number of properties around the older lanes are pre-1919 solid wall rather than cavity, and those want an NHL lime or lime putty mix instead, because a solid wall has to stay breathable. We work out which you have on the visit.

Garden and boundary walls. Front walls, dividing walls between drives and the low walls around a raised patio take weather on both faces with nothing to shelter them. Open coping joints let rain into the core, which then freezes. Repointing the coping and the exposed face, and cutting out the frost damaged bricks, is short work that saves a rebuild.

How it runs

From your call to a written price

Raked-out joints on a red brick pier being filled with fresh mortar
Raked back firstDepth before filling. A disc widens the joint and takes the arris off.

Same team from first visit to last, one person to ring, and no sub-contracting. The quote is itemised: access, raking out, the mortar mix, the area of each elevation, brick replacement and disposal on separate lines.

Nothing is left open overnight, the site is swept daily, and what comes out leaves with us. If something turns up that nobody could have seen, you get a photograph and a price before we carry on.

Repointing like for like is repair, so there is nothing to apply for and no building control involvement, and West Parley has no conservation area of its own. There are four listed entries in the parish, and on a listed building the mortar counts as fabric, so repointing needs listed building consent from Dorset Council before a joint is opened. We check the address rather than take a chance on it.

Cost

What decides the price of a repointing job

Brick corner with a moulded plinth course, mortar matched to the original work
Matched, not guessedColour, sand and joint profile picked up from what is already there.

No rate per square metre. The area tells you almost nothing until somebody has looked at the joints.

Getting to it. A detached bungalow you can work off a tower, a chalet bungalow with a dormer gable and a boundary wall between two drives are three quite different set ups before a joint is touched. The work at height rules are why access is its own priced line.

The joints decide it, not the wall. Raking out by hand is slow, and on soft brick the only safe way: a disc widens the joint and takes the arris off. Depth, and whether faces have already spalled, sets the hours far more than area does.

Matching is the part that shows. Too strong a mix is the classic mistake: cement holds water against a soft brick and the face blows off in the first hard frost. Lime cures slower, and suits most pre-1919 walls here.

Comparing quotes? Ask how deep the joints are raked and by what, what the mix is, how many spalled bricks come out, and whether the scaffold is in the price. Two quotes for the same job are usually two different jobs.

If water is getting in

Open joints, and water coming through the wall

Stone gable with the joints repointed in a lime mortar
Stone wants limeOn rubble stone the mortar is most of the surface, and it has to breathe.

Ring rather than use the form. Washed out joints let driven rain straight through to the inside face, and on a chimney it finds the flashings too. We come and look, sheet or temporarily point the worst, then price the elevation once it has dried enough to show what is sound. If the wet strip is along the bottom of the wall rather than at the top, tell us when you ring, because that changes what we bring. The phone is answered 24 hours for emergencies; scheduled work runs Monday to Friday, 8am to 6pm.

Call now: 07435 839745

Worth knowing

Wet ground, and why the plinth wants a softer mix

West Parley sits on low ground on the north side of the Stour, and although the housing is not in the river flood zones, surface water risk across the area is rated high. Check your own address on the government flood risk service. In practical terms that means water sits on the surface after heavy rain rather than draining away quickly, and where it sits is against the bottom of your walls.

What that changes is the mix at low level, not just the timing. The temptation on a wall that keeps going soft at the base is to point it in the hardest mortar available. That traps moisture in the brick and pushes the damage upward: the water and the dissolved salts leave through the faces above and blow them off. On a wall with wet ground against it we point the plinth in a slightly softer mix than the brick, do not seal it, and tell you where the water is coming from first. Often the useful money goes on lowering a bed, cutting a gravel margin or fixing a gully rather than on mortar at all, and we would rather say that on a free visit than take the job twice.

Who you are dealing with

A local firm you can check

We work across West Parley, Parley Cross, Dudsbury, Longham and Ferndown, broadly BH22, under Dorset Council. You are dealing with Bournemouth Roofing & Building, the trading name of Bournemouth Roofing & Building Ltd, registered in England and Wales, company number 15471719. Thomas Hannen prices every job himself. A verified customer's 10 out of 10 on Checkatrade. The visit and the written itemised quote are free.

Questions

West Parley questions we get asked

Do we need a scaffold to repoint a bungalow?

For the walls, usually not. Most of a single storey elevation is reachable from a tower or trestles, which is why bungalow repointing prices better than the same area on a two storey house. The chimney is the exception: a proper platform goes up, and it is a separate line on the quote.

The mortar at the bottom of our wall is soft and green. Is that rising damp?

More often it is splash and standing water rather than anything rising. Rain hits a hard path or patio, bounces back onto the bottom courses and keeps them wet, and mortar that never dries goes soft and grows algae. Repointing helps, but only after the ground and the drainage are dealt with.

Should we repoint before or after having the patio done?

After, if the patio will change the ground level, because we want to see where the finished level sits against the wall. If the paving is staying, the order does not matter. Either way, tell whoever lays it to keep the finished surface well below the damp proof course and falling away from the house.

How long will the work take?

One elevation of a bungalow is usually a few days. A whole property with the chimney included takes longer, and lime work longer again, because it has to be worked in the right weather and protected while it cures. The quote gives working days, and weather is what moves them.

Will you make a mess of the borders?

Raking out drops spoil and dust, so beds, paths and anything planted along the wall get sheeted first, and the joints are damped down as we work. Everything is swept at the end of each day and the spoil leaves with us rather than sitting in a pile until Friday.

Free quote

Have the bottom of your walls looked at

Thomas prices every job himself. He tests the joints, works out where the water is coming from and sends a written itemised quote, free of charge.