Patios in Poole
New patios laid behind Poole homes in porcelain, sandstone, limestone, granite or block paving, dug out properly, built on a compacted base and laid to fall away from the house.
The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.
Last updated
Bournemouth Roofing & Building lays new patios in Poole, from a small terrace outside the back door to a whole garden of porcelain, natural stone or block paving. Every patio is dug out, built on compacted MOT Type 1, bedded on a full mortar bed and laid to fall away from the house. The site visit and the itemised written quote are free.
You might be thinking about a new patio because the old concrete behind the house has cracked and sits too close to the damp course, because the lawn would work better as somewhere to sit, or because the slabs you have rock underfoot, hold puddles and have gone green and mossy.
Thomas comes out, checks the levels against the house and works out how the slabs get in, the spoil gets out and the rain drains away. The written quote then puts the dig, the sub base, the drainage, the paving and the jointing on separate lines.
The work
Choosing the surface for a Poole patio

Porcelain, Indian sandstone, limestone, granite and block paving all make a good patio in Poole once they are laid on the right base. The choice comes down to how you use the garden, how much sun it gets, how much looking after you want and the budget.
Porcelain. Vitrified all the way through, so it takes in almost no water, shrugs off frost and wipes clean. It is the lowest maintenance paving there is, and the best choice in shade because algae have nothing to root into. Porcelain must go down on a full wet mortar bed with a slurry primer brushed on the back of every slab, or it lets go.
Indian sandstone. Warm colours and a natural look. Riven sandstone has a split, uneven face with plenty of grip. Sawn and calibrated slabs are cut to one thickness, sit flatter and lay faster. Sandstone is porous, so in a shaded corner it greens over and holds staining, and it needs sealing or rinsing more often.
Limestone. Even, quieter colours for a modern garden. Softer than granite, and it can take rust marks from metal furniture.
Granite. The hardest wearing natural stone for a patio. Buy it flamed or bush hammered, which roughens the face so it keeps its grip when wet. In a courtyard that never sees the sun, avoid honed or polished stone.
Block paving and clay pavers. Small units on a screeded sand bed inside edge restraints haunched in concrete, vibrated down and jointed with kiln dried sand. A single block lifts out for a repair.
Block paving or slabs? Concrete block can come in lower on a big, plain area, because the blocks cost less than good stone or porcelain and the whole area is compacted in one go. On a small or awkward patio the cutting and the edge restraint on every side close that gap. We can price both.
Gravel borders and permeable builds. A gravel strip along the house, or permeable block over an open graded base, lets rain soak away where it falls, which suits a front garden.
How it runs
How a new patio is laid, step by step

A new patio is mostly groundwork. Laying the slabs is the last stage, and the days before it go on digging, compacting and setting the falls, which decide whether the patio stays flat. This is the order it happens in a Poole garden.
- Set out. Pegs and string lines mark the edges and the finished level. That level sits at least two brick courses, about 150mm, below the damp proof course, the gap Approved Document C works to.
- Dig out. Turf, topsoil, old concrete, roots and any made ground come out down to a firm formation. The spoil is barrowed to a skip or grab lorry.
- Sub base. A geotextile membrane over soft ground, then MOT Type 1 laid in layers and compacted with a plate compactor.
- Falls and drainage. The surface falls away from the house, roughly 1 in 60 to 1 in 80, to a lawn, a border, a channel drain to a gully or a soakaway, planned against Approved Document H. A soakaway only works if the ground takes the water, so we test it first. A new connection to the public sewer needs Wessex Water's consent, so it becomes its own line and its own application.
- Laying. Every slab goes on a full mortar bed, never on dabs, with slurry primer on porcelain.
- Edges, steps and thresholds. Edgings haunched in concrete, a bullnose or coping on each step, a retaining edge where the garden drops, and a threshold channel where a back door sits low.
- Jointing. A brush in jointing compound or pointed mortar, matched to the material, with every joint filled full.
- Walk round. You check the finished patio with Thomas, ideally after a hose down so the falls show.
How long it takes. A back garden patio of ordinary size takes a few working days from the dig to the jointing, longer with steps, walls or a through-house carry. Your quote says how many working days to expect.
Why patios fail
How long a patio lasts, and the mistakes that shorten it
A well built patio in porcelain or natural stone lasts for decades. When a patio fails early, the cause is nearly always under the slabs, and the mistakes are easy to spot once you know them.
- Too thin a base. A skim of sand or hardcore over soft soil settles, and the slabs sink with it.
- Slabs on dabs. Five blobs of mortar leave hollows under each slab. It rocks, cracks and holds water underneath.
- No fall. A dead flat patio holds puddles, grows algae and stays slippery all winter.
- Laid too high. Paving brought up to the damp course, or over an airbrick, lets rain splash above it and puts damp into the wall.
- Open joints. Joints left half filled wash out, grow weeds and let the slabs move.
How we work
Your garden while the work is on, and the permissions to check
Thomas Hannen is your one contact from the site visit to the last joint, and the price you agree is the written itemised quote. Anything the dig turns up, such as old concrete, a buried drain or thick roots, is photographed and priced before any more digging.
Where a Poole terrace has no side access, everything comes through the house, over boarded and sheeted floors on a barrow route agreed with you. The work area is swept every day and the waste leaves with us.
Around a third of homes near Poole town centre are flats, and a shared courtyard needs the freeholder or managing agent to agree before work starts.
A back garden patio at ground level is usually permitted development. A raised platform more than 0.3 metres high is not, under the permitted development rules for houses. In a front garden, more than 5 square metres of impermeable paving needs planning permission unless the water runs to a lawn or border, as the Planning Portal explains, and the government guidance shows the options. In a conservation area such as Ashley Cross or Town Centre Heritage, check the council's list before a front patio or a new wall, and the listed building records if your house is listed.
Cost
What decides the price of a new patio
The price of a new patio in Poole depends more on the groundwork and the access than on the slabs you pick. Two patios the same size can be priced very differently, and the written quote shows why.
Size, shape and pattern. Area sets the materials and labour, and curves, mixed sizes and cuts around drains add time.
The surface. Porcelain, granite and good sandstone cost more to buy than concrete block, and porcelain is slower to cut.
What comes out. Turf, topsoil, old concrete and roots all have to be dug out and taken away, and the muck away is priced by the load.
Access. A drive to the back gate is quick. A terrace with no side access, or a flat, means every slab and every bag of spoil carried through, which is its own line on the quote.
Levels, steps and walls. A sloping garden needs steps or a retaining wall, and ground made up needs more sub base.
Drainage. A channel drain to a gully, a tested soakaway or a permeable build is extra work, and worth it.
Ask anyone else quoting how deep they dig, what sub base they use and how thick, whether the slabs go on a full bed or on dabs, what fall they set and where the water goes, and whether edgings, steps, jointing and muck away are included. See also how we price a job and our patios page.
If it has become a hazard
A rocking slab, a dropped step or a green, slippery patio
A slab lifted at one corner, a step that has dropped or paving gone green and slippery is a fall waiting to happen. Keep people off that part of the patio until it is fixed, and ring.
On the first visit Thomas checks the base under the problem slabs. Loose slabs are lifted and re-bedded on full mortar, cracked ones cut out and replaced and washed out joints refilled. If the whole base has failed, you are told straight. Scheduled work Mon to Fri, 8am to 6pm. Something urgent? Ring, and if we miss you we call back.
Looking after a patio. Rinse it down twice a year, clear any algae and re-joint any gap that opens. Keep a pressure washer well back from natural stone, which it strips and roughens so it greens faster.
Worth knowing
Low ground near the Quay and Holes Bay
Poole town centre and the Old Town carry a real tidal flood risk today. The Poole Harbour flood strategy counted 573 properties in central Poole at high flood risk, and BCP Council is now building the Poole Bridge to Hunger Hill flood defence along the eastern side of Holes Bay.
That changes how a patio near the Quay or in the Old Town should be built. Never raise the garden level against the house. Keep the paving two courses below the damp course, fall it firmly away from the building, keep airbricks clear and fit a threshold drain at a low back door.
Check your address on the government flood risk service before the quote, because it helps decide between a sealed patio with a channel drain and a permeable build.
Who you are dealing with
Patio work in BH15, and who is behind it
From Boscombe it is 6.7 miles to Poole town. We lay patios across the Old Town, the Quay, Longfleet, Parkstone and Hamworthy, all under Bournemouth, Christchurch and Poole Council. Thomas Hannen, whose business it is, measures and prices every patio himself.
Bournemouth Roofing & Building Ltd is our registered name, company number 15471719, in England and Wales. A verified Checkatrade customer marked us 10 out of 10. The site visit and the written, itemised quote are both free. Read our customers' Google reviews, word for word, on our reviews page, and see driveways in Poole if the front needs doing too.
Planning at a glance
Do you need planning permission in Poole?
Most repairs in Poole need no application at all. What decides whether a change to the outside of your house does is who the council is, whether a conservation area or a listing applies, and whether the place sits in a protected landscape.
| Question | In Poole |
|---|---|
| Who decides | BCP Council is the planning authority for Poole. BCP Council's heritage pages set out what it controls. |
| Conservation area | Yes: Town Centre Heritage Conservation Area, Poole Park Conservation Area and Heckford Park Conservation Area, among others. They cover parts of Poole, so check whether your street is inside one. |
| Listed buildings | Yes, there are listed buildings in and around Poole. If yours is one, work can need listed building consent. |
| Protected landscape | No National Park or National Landscape covers Poole. |
Questions
Questions about patios in Poole
How long does it take to lay a new patio?
A few working days for most back garden patios. Steps, walls, a lot of cutting or a through-house carry add time, and the quote says how many days.
Do I need planning permission for a patio in Poole?
Not usually for a back garden patio at ground level. You do for a raised platform over 0.3 metres, and for more than 5 square metres of impermeable paving in a front garden that does not drain to a border. In a conservation area or at a listed house, check with BCP Council.
Which patio surface needs the least looking after?
Porcelain, which takes in almost no water and rinses clean. Granite comes next. Sandstone and limestone are porous and need more cleaning in shade.
How long will a new patio last?
Decades, if the base is right. Patios fail from the ground up: a thin sub base, slabs on dabs, no fall or joints left open. Get those right and the paving itself is rarely what wears out.
Is block paving cheaper than slabs?
Often on a big, plain area, where the blocks cost less and go down quickly. On a small or awkward patio the cutting and edge restraints close the gap.
Can you lay a new patio over existing concrete?
Sometimes. If the concrete is sound, falls the right way and leaves room below the damp course, porcelain or stone can be bedded over it with a primer. If it is cracked, sits too high or holds water, it comes out.
Nearby, and next door
Patios near Poole
Nearby places we also cover for patios, with straight-line distances from Poole, and the other trades we offer in Poole itself.
Patios nearby
Our other trades in Poole
Patios guides
Driveway planning permission and where water goes Frost damage to brickwork: why it shows later Resin bound, block paving or tarmac comparedBuilders in Poole: all our building work Everything we do in Poole Patios, all areas Every area we cover
Free quote
Get your new patio priced properly
Thomas comes out, checks the levels and the access, and prices the dig, the base, the drainage and the paving in writing. The visit and the quote are free.
