Loft insulation in Poole

Clearing, topping up and laying to full depth in Poole roof spaces, from Parkstone semis to converted town houses with one shared void above them.

The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.

Last updated

Loft insulation

The straight answer

Mineral wool insulation laid between and over the ceiling joists in a loft (illustrative photo for loft insulation in Poole)
Two layers, crossedThe second layer runs across the joists so the timber stops being a cold bridge. Illustrative photo.

In Poole the loft is the cheapest surface to put right and the one most often half done. The answer is usually a top-up to 270mm, the second layer of mineral wool cross laid over the joists, with the eaves left open, the hatch sealed, storage raised and the tank and pipes lagged. Walls, floors and flats come under insulation in Poole.

Poole lofts tend to go wrong at the top floor, under storage boards and with condensation. A top floor that is cold from November and unbearable in a heatwave. A loft boarded end to end for storage, with the insulation underneath pressed to a mat nobody has seen for twenty years. And condensation, which shows up as water beading on the underside of the felt, damp patches through the wool and black mould creeping along the rafters.

We go up into the Poole loft and look before we quote. That means measuring what is genuinely there rather than guessing from the hatch, finding which way the joists run and at what centres, checking the wall plate and the eaves, and working out whether the roof space over your ceiling is yours alone. The site visit is free, the written quote is itemised, and if the ceiling is already sound we will tell you where the heat is really going.

The work

What Poole roof spaces need, one at a time

Rigid insulation board fitted between the rafters in a loft (one of our own jobs, shown for loft insulation in Poole)
Board where depth is shortRigid board earns its place where the headroom will not take quilt. Photo from one of our own jobs.

Clearing comes before laying. Almost no Poole loft is at the depth the owner thinks. Insulation settles under its own weight, compresses hard wherever boards or knees have been on it, goes missing in patches where cables and aerials were run, and stops short of the wall on every side.

In older Poole houses it can be contaminated with droppings, or wet from a slipped tile that was fixed years ago. Damp and contaminated material is bagged in the loft, brought down closed and taken away. Dry sound material stays, gets straightened, and is built over, not binned.

Two layers, and why the second one crosses. The finished depth is about 270mm, but the depth is not the clever part. The first layer of mineral wool roll goes between the joists at a friction fit, tight to the sides so there is no gap at the edge. The second is cross laid over the joists at right angles, so the timber itself disappears under the insulation. Leave the joists proud and every one is a thermal bridge, and a ceiling striped with them loses heat in lines however deep the wool between them is. Glass wool roll suits most Poole lofts, rockwool batts suit an older cut roof where the bays are all different widths, and loose fill earns its keep in the tight triangles at a hip. Approved Document L sets the U value the finished ceiling is expected to reach under Part L, and that is what shows up on an EPC and on the heating bill.

Ventilation comes before depth. This is the part cheap work skips. Insulating a Poole ceiling properly makes everything above it colder, which moves the dew point up into the roof structure. Warm vapour from bathrooms, kitchens and drying washing then meets a cold felt and turns to water. So the insulation runs out over the wall plate and stops there. Vent trays hold it back off the felt to keep an unbroken air gap, cross ventilation moves air from one eaves to the other, and where the eaves are boxed in tight a ridge vent or vent tiles take over. Approved Document F is the standard behind all of it. Push a roll into the eaves and you have traded a warm bedroom for a wet roof and rotten rafter feet.

Everything else that lives up there. Recessed downlighters get rated covers, never wool pushed round them. Cables are lifted clear and clipped to the joists, because buried wiring runs hot. A cold water tank and its pipework are now on the cold side, so the pipework gets lagged and the tank a jacket. The hatch is insulated on its back and draught sealed, since an unsealed trap is a hole in a ceiling you have just paid for.

Storage, and roofs with no loft in them. Boarding laid straight onto joists crushes the wool flat, so where the loft has to stay usable we build a raised floor on loft legs above the full depth and board only the platform you walk on. Plenty of houses in Poole have a room in roof, a dormer or a sloping ceiling over the stairs, and there the work moves to rafter level: rigid PIR board cut tight between the rafters, a clear gap kept above it under the underlay, a second layer beneath the rafters and the joints taped, so the warm roof build up stays continuous and interstitial condensation has nowhere to form.

How it runs

Topping up or replacing loft insulation, start to finish

A loft insulated at rafter level with the gable filled and a rooflight fitted (one of our own jobs, shown for loft insulation in Poole)
At rafter levelA room in the roof is a different job from a cold loft floor. Photo from one of our own jobs.

Thomas goes up into the loft himself. He checks the depth and state of what is there, the ventilation at the eaves, the hatch, and any pipes or tanks. The quote is itemised: the survey, clearing and bagging old material, the new material and its depth, keeping the eaves clear, the hatch and pipework, and disposal.

In a Poole semi or bungalow the hatch is usually on the landing, so we sheet the landing and stairs and carry everything through. In a converted house or a block, the hatch may be over a shared stair, so access is agreed with the freeholder or managing agent first. Mineral wool goes down in two layers, the first between the joists and the second across them. If there is wet timber or daylight through the roof, you are shown a photo and given a price, and it is your call.

Laying insulation in a roof space is not development, so no planning application is needed and no permitted development right is used; the Planning Portal page on insulation confirms it. Building control can come in, because regulation 23 brings a whole element up to standard once more than half of it is renovated. The only planning point is ventilation: new vents on a roof slope seen from a street inside a conservation area are a question for BCP Council. On a listed house, consent is needed for internal work too, so we check the listing records first. It is also worth reading HMRC guidance on VAT for energy saving materials.

Cost

Where the time goes in a loft, and so the money

Plasterboard taped and jointed on a lined loft wall (illustrative photo for loft insulation in Poole)
Lined, then tapedWhere the loft becomes a room, the boarding and the joints come next. Illustrative photo.

A loft is not priced by the square metre. The open middle is quick. The edges take the time. Getting in. A hatch on a landing you can stand a ladder under is simple.

A hatch over a stairwell, a crawl space you can only get through on your knees, or a loft full of boarding that has to come up and go back takes time before any material goes down. A Hamworthy bungalow with a long, shallow roof is slow work at the eaves.

What is up there. Old material may need to come out, be bagged and taken away. A loft full of boxes has to be cleared and put back. Joists at 400 centres with a clear run are quicker than a trussed roof full of bracing.

The edges. Insulation stops at the wall plate, and the eaves must stay clear so the roof can breathe. Getting the full depth into the corners, round the hatch, over downlighters and lagging pipework that will now sit in the cold, and keeping the ventilation path open, is most of the labour. Approved Document L sets the target.

Ask other quotes what depth will be laid and in how many layers, whether old material is being taken out, whether the eaves are kept clear, and whether the hatch and pipes are included.

If the loft is wet

Drips on the felt or mould on the rafters

Beads of water on the underside of the felt, black mould on the roof timbers or insulation that feels damp all point one way: warm, moist air is getting into a loft that cannot ventilate. Over time the timbers pay for it. Phone us about it.

On that first visit we check the eaves, the vents, the hatch and any bathroom fan venting into the loft, and find the cause before anything is added, because more insulation in a loft that cannot breathe makes it worse. Scheduled work runs Monday to Friday, 8am to 6pm. When it is urgent, please phone; if you get no answer, we will be back in touch as soon as we can.

Call now: 07435 839745

Worth knowing

In a converted house the loft is usually one space, not yours

One home in three in Poole is a flat, and a great many of them are older houses divided up rather than purpose built blocks. That matters more in a loft than anywhere else in the building, because when a house is split into flats the roof space above it very often is not.

It stays as one continuous void running over every flat on the top floor, reached through a single trap on a shared landing. Insulating the strip of ceiling above your own rooms and stopping at an invisible line does almost nothing, because the cold air is still sitting over the lot of it.

A shared void belongs to whoever holds it under the lease, normally the freeholder rather than the top floor leaseholder, so the instruction has to come from the right person and we will quote in a form an agent can put to everybody. And a continuous void is a fire separation question too: where a party wall was meant to carry on up through the roof and does not, that is worth knowing before anyone lays rolls across it. We photograph what is up there, mark on the quote where the void runs and where it stops, and price the whole ceiling rather than a slice of it.

Who you are dealing with

The loft insulation installer for BH15

Our base in Boscombe is 6.7 miles from Poole. We insulate lofts in Creekmoor, Oakdale, Hamworthy and Parkstone, and on to Broadstone and Upton, and BCP Council is the building control authority. Thomas Hannen owns the business, goes up into the loft himself, and prices the work.

Bournemouth Roofing & Building Ltd is registered in England and Wales, company number 15471719, and a verified Checkatrade customer rated us 10 out of 10. The visit and the written quote, with every item listed, are both free of charge. Before you book a visit in Poole, you can read our customers' Google reviews, word for word, on our reviews page.

Planning at a glance

Do you need planning permission in Poole?

Most repairs in Poole need no application at all. What decides whether a change to the outside of your house does is who the council is, whether a conservation area or a listing applies, and whether the place sits in a protected landscape.

The planning position in Poole, from council and national records.
Question In Poole
Who decides BCP Council is the planning authority for Poole. BCP Council's heritage pages set out what it controls.
Conservation area Yes: Town Centre Heritage Conservation Area, Poole Park Conservation Area and Heckford Park Conservation Area, among others. They cover parts of Poole, so check whether your street is inside one.
Listed buildings Yes, there are listed buildings in and around Poole. If yours is one, work can need listed building consent.
Protected landscape No National Park or National Landscape covers Poole.

Questions

Questions about loft insulation in Poole

How long does a loft take, and how much mess?

Half a day to a day for most houses, and the work stays above the ceiling. We put crawl boards down, bag the old material in the loft instead of carrying it loose through the house, and sweep at the end of the day. Clearing is what takes the time, not laying.

Our flat is on the top floor. Can we just get the loft done?

Only if the void above you is yours to instruct. In most converted houses it is retained under the lease and the freeholder or managing agent has to issue the order. We will still come and look, put what the roof space needs in writing, and give you something you can send them rather than a conversation you have to repeat.

There is water on the underside of the felt every morning. What now?

That is ventilation, not depth, and adding insulation on its own will make it worse. We clear the eaves, fit vent trays where the roll has been pushed in tight, look at whether the hatch and the downlighters are letting warm air up, and only then talk about how much material goes down.

Do we have to lose the loft as storage?

No, boards fixed straight to the joists are the problem, because insulation squashed flat stops working and you have bought depth you are not getting. We raise the boarded area on loft legs so the full depth runs underneath, board the part you use, and leave the rest deep. The hatch and loft ladder get sorted at the same time.

Is 270mm really necessary, or is that a sales figure?

It is what the numbers need, not what we would like to sell. A single old layer sitting flush with the top of the joist is roughly a third of it, and leaves the timber uncovered as a cold bridge. The second cross laid layer is what does most of the work, which is why the direction matters as much as the depth.

Free quote

Want to know what is really above your ceiling?

We will go up, measure what is there, photograph the eaves and the hatch, and put an itemised written price in front of you. The visit and the quote are free.