Patios in Everton, set below the damp course

A bungalow floor sits low, so on most gardens here the patio level is decided before the slab is chosen, and a terrace built up to the back door is a damp problem waiting to happen.

The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.

Last updated

On an Everton bungalow the patio is a levels job before it is a paving job. The floor sits low, there are often only two or three courses of brick between the ground and the damp proof course, and a terrace built up to meet the back door is the quickest way to put damp into a wall that was dry.

Patio trouble in Everton means ponding instead of draining, slabs sunk where a conservatory was added later, or a terrace the owner wants level with the back door after being told it cannot be done.

It usually can, but not by raising the ground. We survey the back of your Everton house, find the damp course, take levels across the garden and set the surface from those, then price it in writing with the dig, the sub base, the falls, the drainage, the edgings, the slabs and the jointing on their own lines. The site visit and the itemised quote are free.

What we lay

Patios for a low bungalow, from the levels up

Porcelain patio slabs laid to a fall with a gravel border alongside (one of our own jobs, shown for patios in Everton)
Laid to a fallWater goes away from the house, not along the wall. Photo from one of our own jobs.

The damp course is found first. Nothing is ordered until the damp proof course has been found and marked. On the bungalows in Everton the DPC is often a brick or two above the garden, which decides the depth of the dig, whether you get a step and where the drainage goes.

The dig and the muck away. Old concrete, an apron round a sun room, tree roots from a boundary hedge and a foot of made ground all get excavated out. The spoil goes into a skip or a grab lorry. On a low Everton bungalow the dig is deeper than people expect, because the slab finishes low and the sub base still has to fit under it.

The sub base. MOT type 1 laid and compacted in shallow layers, with a geotextile under it where the subgrade is soft. Hardcore has its place on a small area, but type 1 locks together, which is why it holds a level under furniture and a hot tub.

Porcelain. The most common choice on these Everton gardens. Calibrated to one thickness, almost no absorption, and made in slip rated finishes, which matters on a shaded terrace. It goes on a full mortar bed with a slurry primer on the back of each slab.

Sandstone, limestone and granite. Riven sandstone suits an older bungalow better than a large format porcelain. Limestone and travertine give a flatter surface. Granite setts work for a threshold band or a step tread. None is calibrated, so each slab is bedded to its own thickness.

Full mortar bed, never dabs. A full bed under the whole slab, not five dabs and fresh air, and not a sand screed. Dabbed slabs go hollow, ring under a heel and crack across the middle within a couple of winters. It is the commonest fault in paving of this age.

Falls, thresholds and steps. A fall away from the house across the whole area, never along the wall. Where the threshold is low we drop the patio two courses below the damp course and use a wide shallow step rather than building the level up.

Drainage. An ACO channel at the wall taking runoff to a gully, or a permeable jointed edge and a soakaway at the low end of the garden. On a flat plot the fall is built into the sub base, because you cannot find it in the slabs afterwards.

Edges and retaining. Haunched edging or a kerb to hold the outer course, a retaining edge with a coping where a border sits higher, and a border detail so soil does not wash across the paving.

Jointing and repairs. A resin grout you brush in while the joints are damp, or pointing in mortar on riven stone. We also lift and relay: sunk bays, rocking flags, a cracked slab, staining, efflorescence and a slippery green surface that washing will not keep off.

How it runs

A new patio at the back of the house, start to finish

A finished porcelain patio in the wet, showing how the surface drains and where the joints sit (one of our own jobs, shown for patios in Everton)
Judged in the wetRain shows the falls and the joints that a dry day hides. Photo from one of our own jobs.

Thomas looks at the Everton garden, the back door and where the damp proof course sits, and talks through the size and the kind of slab you want. Every stage has its own line on the quote he writes: excavation, muck away, the sub base, the levels and falls, where surface water drains, edgings, steps, slabs and jointing. Thomas stays your contact while the whole patio is dug and laid.

Behind a bungalow the patio usually starts right at the back door, so the height against the house is the first thing we fix. We get into an Everton garden through a side gate or down the drive, and barrow over boards to protect the lawn. The base is compacted, each slab is bedded on a full bed of mortar, and the joints are filled once it has set. No trench is left open overnight, the garden is tidied each day, and the soil goes with us. If we hit an old footing, roots or a drain, you will be shown it, with a price, before we touch it.

Paving at ground level is normally permitted development. A raised terrace, a retaining wall or a change in ground level is where it stops being automatic, and the Planning Portal lists the other permissions that may apply. New Forest District Council is the authority, and no conservation area covers Everton.

Cost

What goes into the price of a patio you will use

Patios are not priced per square metre. The slabs you choose are the smallest part of the bill. Carrying. If a drive runs to the back gate, barrows go straight in. A semi with a narrow side path, or a park home plot you cannot drive onto, means carrying every slab and bag by hand.

Clearing the ground. Old concrete, a raised flower bed, roots or buried rubble have to be broken up and carted off before anything is laid, and that is priced by the load.

Height against the house. The patio must slope away from the wall and finish at least two courses below the damp proof course. On a bungalow with a low back step, that can mean digging deeper, adding a step or fitting a drainage channel.

Clay underneath. Ground that shrinks and swells needs a thicker, firmer sub base, and rainwater must be carried away rather than left to soak in beside the house.

Your choice of paving. Porcelain, sandstone and concrete slabs cut and lay differently, and a jointing compound costs more than mortar pointing.

Ask other quotes how deep they dig, what sub base goes in, whether each slab sits on a full wet bed or on dabs, and where the water goes.

If it has become a hazard

Patio slabs that have lifted, sunk or turned green

Phone us, and skip the form. A slab lifted at one corner or a step that has dropped is a trip hazard, and a north facing Everton patio turns slippery with algae in winter. Mark the loose slab or stand a planter on it, and keep people off the step.

On a bungalow, a sunken bay by the back door can also hold water against the wall. On the first visit we lift and relay the worst slabs so it is safe, then check whether the base under the rest has failed. We do booked patio work Monday to Friday, 8am to 6pm. If you get no answer, we will ring you as soon as we can.

Call now: 07435 839745

The one local thing

Bungalows, and the two courses under the back door

Bungalows are a big part of the housing in Everton, and that changes the patio job more than any material choice does. A bungalow floor sits close to the ground. On many of the ones built here in the late fifties and sixties there are only two or three courses of brick between the garden and the damp proof course, and less once decades of soil have been added round the walls.

A patio has to finish at least two courses below that damp course. Build the paving up to meet a low threshold and you bridge it: rain lands on the slab, sits against the brick and wicks past the barrier into the wall. It shows as a damp skirting a year or two later, and by then the patio has to come up again.

So in Everton we set the level first and design round it: a shallow step down from the door, a channel across a low threshold, and sometimes taking the surrounding ground down rather than the patio up. That is more digging and more muck away than an overlay, and it is the difference between a terrace that lasts and a damp problem you paid for.

Who you are dealing with

Patios from Tiptoe to the coast road, one firm

We lay patios in Everton, Hordle, Downton and along the lanes towards the coast road, in the SO41 postcode. Our base in Boscombe is 10.8 miles away, and the council here is New Forest District. You would be dealing with Bournemouth Roofing & Building Ltd, registered in England and Wales under company number 15471719. Before you book a visit in Everton, you can read our customers' Google reviews, word for word, on our reviews page.

The business is owned by Thomas Hannen, who measures the garden, checks the levels and gives you the price himself. On Checkatrade we have a 10 out of 10 from a verified customer. The site visit is free, as is the written quote with its itemised lines. A bungalow front door has the same shallow step, and driveways in Everton are set below the damp course in the same way.

Planning at a glance

Do you need planning permission in Everton?

Most repairs in Everton need no application at all. What decides whether a change to the outside of your house does is who the council is, whether a conservation area or a listing applies, and whether the place sits in a protected landscape.

The planning position in Everton, from council and national records.
Question In Everton
Who decides New Forest District Council is the planning authority for Everton. The National Park boundary runs close by, and the Park's property map shows which side an address falls.
Conservation area None covers Everton, so a like-for-like repair is ordinary maintenance.
Listed buildings Yes, there are listed buildings in and around Everton. If yours is one, work can need listed building consent.
Protected landscape No National Park or National Landscape covers Everton.

Questions

Questions about patios in Everton

Can my patio be level with the back door of a bungalow?

An Everton patio cannot sit level against the wall. The paving has to sit two courses below the damp course. What we can do is a wide shallow step down from the threshold, or a recessed channel across the doorway, so it reads as level without bridging it.

My patio ponds in the middle after rain. What is wrong?

Either it was laid flat or the falls run the wrong way. Water needs a steady fall away from the house across the whole area, built into the sub base, not found in the slabs. Ponding also says the bed under it has settled.

Do I need a step down onto the patio?

Usually one or two, and that is a good thing rather than a compromise. A wide shallow tread with an overhang keeps water off the riser and gives the fall somewhere to start without pushing the level up against the brickwork.

Is porcelain slippery when it is wet?

Not if the right finish is specified. External porcelain comes in slip rated surfaces and a shaded terrace gets a textured one. What makes any patio slippery is algae, and that grows on a surface that stays damp.

Will a hot tub sit on a normal patio base?

Only if the base was built for it. Filled and occupied it is a serious point load, so that area wants a deeper compacted sub base or a reinforced slab. Tell us before we dig, not after the paving is down.

Free quote

Get the levels checked before anyone quotes you a patio

Thomas comes out, finds the damp course, takes levels across the garden and prices the dig, the base, the falls, the drainage and the jointing in writing. The visit and the quote are free.