Fascias, soffits and guttering in Winterborne Stickland

Bargeboards, fascias, soffits and gutters repaired and renewed in Winterborne Stickland, starting with the edges the wind gets at first.

The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.

The roofline is the fascia, soffit, bargeboard and gutter around the edge of your roof. Here it is usually the bargeboard on the gable and the fascia on the exposed side that go first, because that is the elevation taking the weather.

Most calls follow a wet week or a gale. A gutter overflowing and a wet stripe with green staining down the wall below it. A bargeboard with the paint peeling and blown off it and the timber soft at the bottom end. Or a length of gutter that has dropped off its brackets overnight. The free visit starts at the ends rather than the middle: the foot of each bargeboard, the stop ends, the corners and the last bracket before each one, because that is where a house out here loses first. Then the timber gets tested, and you get photographs with an itemised written price.

The work

Boards first, then the run

A finished tiled roof with a new white fascia and gutter run along the eaves
New boards, not cappingThe old fascia comes off, so whatever is soft behind it gets found.

Along the eaves. The fascia runs across the ends of the rafters and takes the weight of the channel, with the soffit closing the underside of the overhang. On the older houses these are deep timber sections and there may be no soffit at all. Boards are lifted off rather than hidden behind a cover board, because cladding seals damp against the wood and leaves fresh brackets with nothing to hold. Where a board is dry and firm we will cap over it and say so. New boards are uPVC, or painted timber where the house asks for it.

Up the gable. The bargeboard follows the roof slope to the verge, and out here it works harder than anything else on the building. Its bottom end is where rot starts and where wind gets a grip once the fixings loosen. Rotten ends are cut away and renewed, and the board is fixed back properly rather than nailed and hoped for. The gutter stop end and the last bracket before the corner get the same attention, since they are the first parts to be pushed out of line in a gale.

Behind and underneath. Once the fascia is down, the rafter ends, the wall plate and the tilt fillet raising the lowest course of tiles are all there to look at, and anything soft is cut back and pieced in solid. A felt support tray goes in so the underlay finishes over the front of the board and delivers into the channel rather than behind it. Tiles moved to reach it are refixed to the pattern in BS 5534.

The run and the pipe. Brackets, unions, outlets, hopper heads, downpipes and shoes are renewed as one and hung to a real fall, because a length put up level sags and stands full of water. Half round suits most houses, ogee sits flat to a square edged fascia, and deepflow shifts far more where a long roof drains into a single channel. Sound cast iron on an older property is better lowered, re-bedded at the joints and painted front and back than thrown away, and aluminium is worth a figure on a long exposed elevation. Out here a pipe ends in a gully and then a soakaway, and a silted soakaway returns the water to the base of your wall. Where a soffit is renewed, eaves ventilation goes in with it, through the panel or over the fascia, keeping an air gap above the loft insulation. Smaller faults, a weeping joint, a perished union, an outlet choked with moss and debris, are refixed or re-hung on their own, with wasps dealt with first and nesting birds given until they are done.

How it runs

From your call to a written price

A completed hipped roof with the eaves, fascia and gutter run finished
Every hip, every runA hipped roof is more eaves per house, and more to hang straight.

Same team from first visit to last, one person to ring, and no sub-contracting your work out to somebody you have never met. The quote is itemised, not a figure on the back of a card: access, the length of each run, stripping the old boards and gutter, the fascia, soffit and any bargeboard, the gutter, outlets and downpipes, and disposal on separate lines, so you can compare it properly against anyone else's.

Nothing is left open or unusable overnight. The site is swept at the end of each day rather than the end of the job, and what comes out leaves with us. If something turns up once we start that nobody could have seen, you get a photograph and a price before we carry on.

The village sits inside the Winterborne Stickland Conservation Area and the parish carries a good many listed entries, so it is worth settling appearance before materials are ordered. Like for like renewal is maintenance, with no planning application and nothing for building control. On a listed building, swapping cast iron for white plastic changes the character of the place rather than repairing it, and that needs listed building consent.

Cost

What decides the price of a roofline

A roof part way through re-tiling, with the eaves course and the gutter visible
The bottom courseThe tiles have to drip into the gutter rather than behind it.

No rate per square metre, because a metre of fascia over a bay is not the same metre as one on a straight gable.

Getting to it. A cottage tight to the street, a house standing on its own in open ground and a bungalow with a hedge along the boundary are three different jobs. A bungalow run comes off a tower, a two or three storey gable wants a scaffold, and a run over a conservatory or a bay window means building the platform around it. The work at height rules are why the access is a priced line rather than something absorbed into a rate.

What is behind the boards. Rotten fascia is a symptom. The question is whether the rafter feet and the wall plate behind it are still sound, and nobody knows until the old board comes off. Capping over with plastic hides that instead of fixing it, which is why we take the old boards off rather than clad them.

The run, not the metre. A straight gable is quick. Bay windows, a conservatory in the way, a corner return, a run that has to be worked around a satellite dish or a service cable, and every outlet, hopper and downpipe are priced one at a time. So is putting the fall back: a gutter hung level looks fine and holds water all year.

Comparing quotes? Ask whether the old boards are coming off or being capped over, what happens if the rafter feet or the wall plate turn out to be rotten, whether the gutter, outlets and downpipes are all being renewed or only the fascia, and whether the scaffold is in the price. Two quotes for the same job are usually two different jobs.

If a section has come away

A gutter hanging off, or a fascia gone through

Ring rather than use the form. A length of gutter pulled off its brackets, a downpipe snapped at the bend or a fascia soft enough to put your hand through goes to the front of the queue, because the next heavy rain runs straight down the wall and into the brickwork. The first visit is about getting it supported and discharging somewhere sensible, and we price the run properly once we can see how far the rot goes. We are a fair way out from here, so we will tell you honestly when we can be there rather than promise you a morning. The phone is answered 24 hours for emergencies; scheduled work runs Monday to Friday, 8am to 6pm.

Call now: 07435 839745

Worth knowing

The gable end is where the wind gets in

Standing where it does, the exposed side of a house here faces south west and takes the weather with nothing much in the way of it. Wind does not damage the middle of a roof or the middle of a gutter run. It works at the edges, and the edge is exactly what this trade covers: the bargeboard up the verge, the gutter stop end, the last bracket before the corner and the bottom of a downpipe. A bargeboard that has worked loose at the foot lets air under the verge, and after that every gale has something to pull on.

So after a bad night, walk round and look at the ends of things rather than the middles. A bargeboard standing proud of the roof line, a gutter stop end sitting at an angle, a downpipe clipped to the wall at the top and swinging at the bottom. Any of those is a half hour job while it is only that, and a much bigger one once the wind has had a winter to work on it. If the board is soft where it has come loose, screwing it back on is not the answer and we will tell you so.

Who you are dealing with

A local firm you can check

We cover Winterborne Stickland, the Winterborne villages, Blandford, Milton Abbas and Spetisbury, broadly DT11, under Dorset Council. You are dealing with Bournemouth Roofing & Building, the trading name of Bournemouth Roofing & Building Ltd, registered in England and Wales, company number 15471719, which you can look up in a minute. Thomas Hannen's business, and he is the one who comes out to price the job, not a salesman. A verified customer's 10 out of 10 on Checkatrade. The visit and the written quote are both free.

Questions

Winterborne Stickland questions we get asked

Our bargeboard has come loose at the bottom. Is that urgent?

It is worth dealing with before the next gale. A loose board lets wind under the verge, and from there it has something to pull at. If the timber is still sound it goes back with proper fixings. If it is soft at the end, that section wants replacing rather than screwing back.

We are in the conservation area. Can we have plastic?

On an unlisted house it is usually your own decision, but it is worth a call to the council before ordering, especially on an elevation that faces the street. On a listed building changing the material is a consent question and not something to find out afterwards.

Our gutter is clear and still overflows. Why?

Because the fall has gone, a union is leaking, or water is getting behind the run rather than into it. On an exposed elevation the rain arrives at an angle and comes off the tiles fast, which is why the tray behind the gutter matters as much as the channel.

How long does it take?

A small run is a day. A house with two gables and a long back elevation is two or three, and soft rafter feet add time because the timber has to be pieced in before any new board goes on.

Free quote

Get a price for your Winterborne Stickland roofline

Tell us the address and what you have noticed. We will come out, test the boards and put an itemised price in writing. No charge, and no obligation.