Fascias, soffits and guttering in Rockbourne

Rotten boards off, gutters re-hung to a proper fall, and every downpipe followed to where it actually discharges. Free written itemised quote.

The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.

Getting the gutter right is only half of it. On low ground the other half is where the downpipe ends, because a soakaway that fills up in winter puts your roof water straight back against the wall.

The calls come in three shapes. A cast iron joint weeping and marking the wall below. A softwood fascia gone spongy so the brackets have started to pull. And a run that overflows every time it rains hard, no matter how often somebody clears it.

Rockbourne is an old village with a lot of older property, so we expect painted timber and iron on the frontages and plastic on the newer houses. We survey every run off a ladder or a tower, follow each downpipe to wherever it actually goes, photograph what is wrong, and give you a written itemised price.

The work

Boards, brackets and where the water ends up

A finished tiled roof with a new white fascia and gutter run along the eaves
New boards, not cappingThe old fascia comes off, so whatever is soft behind it gets found.

The components, and which of them has failed. A roofline is the fascia on the ends of the rafters, the soffit beneath it, the bargeboard up the gable, the verge where the tiles finish, and then the rainwater side: gutter, brackets, unions, outlets, hoppers, downpipes and the shoe at the bottom. Almost every call is one of six faults. Blown and peeling paint. A board soft enough to take a screwdriver. A run sagging or dropped between brackets. A gutter pulled away from the wall. A leaking joint. Or an overflow in heavy rain from a run with nothing in it, which is a fall or profile problem and not a blockage.

Off rather than over. The boards come off. That is the only way to see the rafter feet, the wall plate and the bottom course of tiles, and on the older cottages here it is often the wall plate end that has taken the water. Rot starts at the top edge of the fascia where the felt has torn back over the eaves, so a felt support tray goes in as standard with a tilt fillet under the bottom course so the tiles drip into the gutter rather than behind it. Soft rafter ends are spliced. Tiles disturbed at the eaves or verge are refixed as BS 5534 expects. Where a board is genuinely sound and dry, capping the face and lining the soffit is a fair job at a lower price and we will tell you so.

What goes back. uPVC on most modern houses, in white, black or woodgrain, because it never needs painting and takes a bracket screw properly. Timber where a moulded profile matters, primed on all four faces before it goes up. Cast iron rubbed down, re-bedded and repainted rather than removed wherever it is still sound. Aluminium on a long unbroken run so there are no unions to fail. The gutter profile is chosen for the roof above it: half round for an ordinary slope, and square, ogee or deepflow where a wide or steep roof in driving rain sheds more water than half round will carry before it spills over the back edge.

Fall, fixings and air. New brackets at proper centres, the run re-hung to fall towards the outlet, unions resealed and downpipes clipped straight. Hung level, a gutter looks perfect and stands full of water all year, which perishes seals and keeps timber damp from behind. Then the eaves get put right while they are open: soffit vents in the new panels, or an over fascia vent where the soffit is too narrow to take one, with the air gap over the loft insulation left clear. Block it and the moisture that should be leaving the roof turns into condensation on the insulation instead. Approved Document F sets the eaves ventilation figures. Open corners are closed against birds and wasps nesting behind a soffit, and any outlet blocked with moss and debris off the tiles is pointed out while we are up there.

How it runs

From your call to a written price

A completed hipped roof with the eaves, fascia and gutter run finished
Every hip, every runA hipped roof is more eaves per house, and more to hang straight.

Same team from first visit to last, one person to ring, and no sub-contracting your work out to somebody you have never met. The quote is itemised, not a figure on the back of a card: access, the length of each run, stripping the old boards and gutter, the fascia, soffit and any bargeboard, the gutter, outlets and downpipes, and disposal on separate lines, so you can compare it properly against anyone else's.

Nothing is left open or unusable overnight. The site is swept at the end of each day rather than the end of the job, and what comes out leaves with us. If something turns up once we start that nobody could have seen, you get a photograph and a price before we carry on.

Renewing a roofline like for like is repair and maintenance, so there is no planning application and nothing for building control. The planning authority here is New Forest District Council rather than the National Park Authority, the village is a conservation area where appearance at the front is controlled, and there are a great many listed entries, on which Planning Portal guidance on roofs is a useful starting point before anything changes material.

Cost

What decides the price of a roofline

A roof part way through re-tiling, with the eaves course and the gutter visible
The bottom courseThe tiles have to drip into the gutter rather than behind it.

No rate per square metre, because a metre of fascia over a bay is not the same metre as one on a straight gable.

Getting to it. A cottage with low eaves right on the village street, a farmhouse with a long straight gable, and a modern house with a bay window under the front run are three different jobs before a board comes off. A bungalow run comes off a tower, a two or three storey gable wants a scaffold, and a run over a conservatory or a bay window means building the platform around it. The work at height rules are why the access is a priced line rather than something absorbed into a rate.

What is behind the boards. Rotten fascia is a symptom. The question is whether the rafter feet and the wall plate behind it are still sound, and nobody knows until the old board comes off. Capping over with plastic hides that instead of fixing it, which is why we take the old boards off rather than clad them.

The run, not the metre. A straight gable is quick. Bay windows, a conservatory in the way, a corner return, a run that has to be worked around a satellite dish or a service cable, and every outlet, hopper and downpipe are priced one at a time. So is putting the fall back: a gutter hung level looks fine and holds water all year.

Comparing quotes? Ask whether the old boards are coming off or being capped over, what happens if the rafter feet or the wall plate turn out to be rotten, whether the gutter, outlets and downpipes are all being renewed or only the fascia, and whether the scaffold is in the price. Two quotes for the same job are usually two different jobs.

If a section has come away

A gutter hanging off, or a fascia gone through

Ring rather than use the form. A length of gutter pulled off its brackets, a downpipe snapped at the bend or a fascia soft enough to put your hand through goes to the front of the queue, because the next heavy rain runs straight down the wall and into the brickwork. The first visit is about getting it supported and discharging somewhere sensible, and we price the run properly once we can see how far the rot goes. Tell us where the pipe was discharging before it broke, because on wet ground getting that right matters as much as getting the run back up. The phone is answered 24 hours for emergencies; scheduled work runs Monday to Friday, 8am to 6pm.

Call now: 07435 839745

Worth knowing

On wet ground, a soakaway is not an answer

The village runs along a chalk stream, and a fair number of the houses sit close to it on ground that is genuinely wet in winter. That matters at the bottom of a downpipe rather than at the top. When the water table is up, a soakaway does not soak away: it fills, backs up the pipe and puts roof water straight into the ground beside a wall, which is how an otherwise sound cottage ends up with damp at the base of it every February and dry the rest of the year. the government flood risk service will show you where your address sits.

So on a wet plot the question is not only what the gutter is made of but where every downpipe ends. A positive outfall to a piped drain or a proper gully beats a soakaway on ground like this, and Approved Document H is the guidance behind it. Do not pipe roof water straight into the watercourse without asking first, because that is a permission question rather than a plumbing one. When we quote, each downpipe is a separate line and we say what it currently discharges into, so you can decide whether to sort that at the same time. It is far cheaper to move a pipe while there is a tower on the wall than to come back for it.

Who you are dealing with

A local firm you can check

We cover Rockbourne, Whitsbury, Damerham, Breamore and Fordingbridge, broadly SP6, under New Forest District Council. You are dealing with Bournemouth Roofing & Building, the trading name of Bournemouth Roofing & Building Ltd, registered in England and Wales, company number 15471719, which you can look up in a minute. Thomas Hannen's business, and he is the one who comes out to price the job, not a salesman. A verified customer's 10 out of 10 on Checkatrade. The visit and the written quote are both free.

Questions

Rockbourne questions we get asked

Our downpipe goes into a soakaway that floods. Can you change it?

Usually yes. The options are a positive outfall to a piped drain, a gully in the right place, or moving the soakaway well clear of the footings. We will say which the ground and the layout allow, and it is priced as its own line.

Can we run the roof water into the stream?

Not without asking. Discharging to a watercourse is a permission question and not something to sort out with a length of pipe. We will tell you who to ask before anything is connected.

Is our conservation area going to stop us using plastic?

Not at the back, usually. At the front it might, because what the designation controls is how the building looks from the road. Ask before ordering, and note that planning here is New Forest District Council rather than the National Park.

Do the tiles have to come off?

No. Only the bottom course is lifted, and only far enough to slide in the felt support tray, then set back down. The covering itself stays on.

How long will it take?

A day or two on a straightforward house once access is up. Old uneven rafters, carpentry to the rafter feet, and moving a downpipe to a new outfall each add to that.