Flat roofing in Corfe Castle
Lead flats, back additions, garage roofs and extension roofs across Corfe Castle and BH20, with the consent position sorted before we start.
The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.
Last updated
Flat roofs in Corfe Castle are mostly small ones tucked behind stone elevations: a back addition, a scullery roof, a garage. What you can put on them is a planning question as much as a roofing one, so we deal with both before quoting.
The village sits inside the Corfe Castle Conservation Area and Dorset Council is the planning authority for it. That does not stop a leaking roof being fixed. It does mean the covering, and anything that changes how the building looks, is worth settling on paper before the first sheet comes off.
The work itself in Corfe Castle is the same as anywhere: find where the water is genuinely entering, look at the deck rather than the surface, and say plainly whether it is a repair or a re-cover. We photograph what we find, put an itemised written price in front of you, and tell you if the job needs consent before it can start. A leak does not wait on paperwork, so if water is coming in under one of these roofs now, ring 07435 839745.
The work
Lead flats, back additions and garage roofs

The traditional flat comes first. A good many of the older roofs in Corfe Castle are lead, laid in bays over a boarded deck with rolls and drips between them. Lead splits where it has been fixed too tightly to move, and it fatigues along a drip. Where the original is lead and the building is seen, lead is usually what should go back, and we will price it that way rather than talk you into a membrane.
The modern ones. Elsewhere in Corfe Castle it is felt: a three layer built up system with a mineral cap sheet, or a single torch on layer laid over the last covering. Those fail as splits along the creases, blisters where damp was sealed in, and a lifted seam at an upstand. On a plain rectangle we strip to the deck and lay EPDM rubber in one sheet, no lap and no seam in the field of the roof.
What is under it. Plywood, OSB or chipboard decking on joists, with firrings on top creating the fall. Chipboard that has been wet gives underfoot and comes off. A roof with no fall holds standing water, and that ponding is what kills a covering long before the weather does. Where we cannot re-firr we build the fall in tapered insulation. BS 6229 is the code the falls come from.
Insulation, and what it does to old timber. Over a heated room the insulation comes up with the covering under Part L. We take it above the deck: a vapour control layer first, PIR over that, membrane above, so the joists and the boards stay on the warm side of everything. The alternative is a cold roof, insulation packed between the joists, which leaves the deck below the dew point. Warm damp air from the room reaches it, interstitial condensation forms inside the construction, and in a thick walled old building the timber has nowhere to dry to. Building control are notified and inspect it open.
Junctions and openings. None of this is optional. A chase cut into the stone or brick, a lead cover flashing dressed into it, a cavity tray above where the wall is cavity built. A coping on the parapet with an apron under it. A kerb beneath every rooflight, lantern, Velux style flat roof window, hatch and soil or vent pipe, so the covering turns up an upstand instead of stopping at a frame. A drip trim along the free edges. And a rainwater outlet sized for the roof, running to a hopper, a downpipe or the gutter. A garage is a day, a back addition two or three working days, and we say how long first.
How it runs
How a lead or membrane flat roof job goes in the village

Thomas looks at the flat roof from above and at the ceiling below it, then prices the job himself. Behind a Corfe Castle cottage it is often lead: a flat over a back addition, a dormer, or a bay. On a newer house it is more likely felt on a garage or an extension.
His quote gives each item a line: getting up there, stripping the old covering, new boarding or firrings where needed, insulation, the lead or membrane, each upstand, outlet and edge trim, and the skip. Thomas stays your point of contact throughout.
With no way round the back of a Corfe Castle house, materials come through the house or up from the street, so the route is agreed first, floors are sheeted, and the old boarding leaves the same way. By evening the roof is either finished or under a secure temporary cover, and the ground is tidied. A rotten joist or a deck worse than expected is photographed and priced for you before anything extra happens.
Like for like is maintenance. Changing lead for a membrane where people can see it, or putting in a rooflight or a lantern, can need planning permission, and a listed building needs listed building consent for any of it. The parish has a great many listed entries, and the village is in the Corfe Castle Conservation Area, so ask Dorset Council about your address. Building control comes in wherever the roof is over a heated room.
Cost
Deck, falls and upstands: where a flat roof price comes from

We don't price flat roofs by area. The size is the easy measurement and tells you least. Lead or a membrane. A lead flat on an old cottage is laid in bays, with wood rolls and drips between them, and on a building of that age lead usually goes back. EPDM rubber and GRP fibreglass go down faster on a modern extension or garage. We agree which suits your building, and what will show from the lane, before quoting.
The boards underneath. A dry, firm deck can take a new covering. Chipboard or ply that has soaked for years must be replaced, and on an old back addition the joists can be too slight for the span. We look from inside or lift an edge first.
Falls and upstands. A dead flat roof holds puddles, and firrings give it a fall again. Where the roof meets a stone wall, the flashing is tucked into a raked-out joint, not glued to the face. Every outlet, upstand and edge trim is counted, and several outlets add up.
Getting to it. A single storey addition in Corfe Castle can usually be worked from a tower. On a street frontage each sheet and every bag of old boarding is carried through, and the work at height rules make the platform its own item.
Ask any other firm which system they are pricing and in how many layers, whether the deck is replaced or overlaid, and whether scaffold and skip are included.
If it is coming through
A split in the lead, or a flat roof letting water through
Call us rather than using the form. When a lead bay splits, felt blisters or an upstand peels away from the wall, rain runs straight through to the room below, and the deck boards keep soaking it up long after the shower has passed.
The first visit puts a temporary cover on and gets the water running off, and the proper repair is priced once we know how much boarding is spoilt. In the meantime catch the drips in a bucket; if the ceiling sags, a single small hole over the bucket lets it drain instead of collapsing. Flat roof work is booked Monday to Friday, 8am to 6pm. Miss us, and we call you back as soon as we are able.
Worth knowing
Inside the conservation area, the covering is a decision, not a detail
The whole of the village core sits within the Corfe Castle Conservation Area, and there are well over a hundred listed entries in and around it. That combination is unusual even for Purbeck, and it changes the order you do things in. The rule of thumb is simple enough: like for like is maintenance, a change of appearance is not.
So a lead flat re-laid as a lead flat is repair. The same roof re-covered in a light grey membrane, where it can be seen from the street or from the castle mound, is a change the council will take a view on. Rooflights and lanterns are the other thing that gets noticed, because they add something that was not there before. And if the building itself is listed, the listing follows it all the way to the back, so even a hidden roof needs consent. None of this is a reason to leave water coming in. We make a leak safe first and sort the permanent covering once the paperwork is straight.
Who you are dealing with
Who comes out to look at your flat roof
From Boscombe to Corfe Castle is roughly eleven and a half miles. We price flat roofs in the village and on the lanes out to Church Knowle, Kingston and Harmans Cross, all of it BH20 and all under Dorset Council.
You deal with Thomas Hannen, whose business this is; he looks at the roof and writes the price himself. The firm is Bournemouth Roofing & Building Ltd, registered in England and Wales as company 15471719. A verified customer on Checkatrade gave the work 10 out of 10. Neither the visit nor the written quote costs you anything. Before you book a visit in Corfe Castle, you can read our customers' Google reviews, word for word, on our reviews page.
Planning at a glance
Do you need planning permission in Corfe Castle?
Most repairs in Corfe Castle need no application at all. What decides whether a change to the outside of your house does is who the council is, whether a conservation area or a listing applies, and whether the place sits in a protected landscape.
| Question | In Corfe Castle |
|---|---|
| Who decides | Dorset Council is the planning authority for Corfe Castle. Dorset Council's heritage pages set out what it controls. |
| Conservation area | Yes: Corfe Castle Conservation Area. Check whether your street is inside the boundary before changing anything visible. |
| Listed buildings | Yes, there are listed buildings in and around Corfe Castle. If yours is one, work can need listed building consent. |
| Protected landscape | Inside the Dorset National Landscape (formerly AONB), so anything visible from outside gets more attention. |
Questions
Questions about flat roofs in Corfe Castle
Do I need consent just to fix a leak?
No, you do not need consent to fix a leak in Corfe Castle. Making a roof watertight in the materials it already has is maintenance, and you can get on with it. Consent comes into it when the material or the appearance changes, or when the building is listed, in which case it applies to the whole thing.
Can I have a rooflight put into a flat roof here?
Often yes, but ask first, not after. A rooflight adds something visible, and inside a conservation area that is exactly what is controlled. On a hidden rear roof it is usually straightforward. We will fit the kerb and the upstand properly either way.
Is lead worth relaying, or should I switch to rubber?
If the building is old and seen, lead is usually the right answer and often the only acceptable one. On a hidden garage roof, EPDM is a better use of your money and will not tempt anybody to climb up for it. We will price both and set out the difference.
How quickly can you get out here?
A leak comes first, and when you ring we will tell you plainly when we can be there. For a planned re-cover we book it, because the run out to Purbeck is worth doing in one go rather than in half days.
Nearby, and next door
Flat roofing near Corfe Castle
Nearby places we also cover for flat roofing, with straight-line distances from Corfe Castle, and the other trades we offer in Corfe Castle itself.
Flat roofing nearby
Our other trades in Corfe Castle
Flat roofing guides
GRP, EPDM or felt: which flat roof covering? Snow on a flat roof or a conservatory Warm roof or cold roof: which do you need?Everything we do in Swanage Flat roofing, all areas Every area we cover
Free quote
Get a price for your Corfe Castle flat roof
Tell us the address and what you have noticed. We will come out, look at the deck as well as the covering, and put an itemised price in writing. No charge, and no obligation.