Fascias, soffits and guttering in Ferndown

Soft boards off, rafter feet checked, and new fascias, soffits and gutters hung to a proper fall. Free site visit and a written itemised price.

The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.

If a gutter overflows in heavy rain when there is nothing in it, the run is either hung level or too small for the roof above it. Re-hanging to a fall, on new brackets and in the right profile, is a different job from clearing it out.

The calls come in three shapes. Somebody has repainted the fascias twice and the paint is blowing again within a year. A downpipe has come off its clips and there is a wet stripe down the wall. Or the soffit has gone soft at one end and the birds have found it.

Ferndown is mostly single storey and mostly post-war, which makes for long low runs on standard eaves details and a lot of gutter per household. That is good news for access and bad news for anyone who has been putting it off, because there is more of it than there looks from the drive. We survey every elevation, photograph the boards we are unsure about, and price the runs, downpipes and access separately.

The work

From the fascia board down to the shoe at the bottom

A finished tiled roof with a new white fascia and gutter run along the eaves
New boards, not cappingThe old fascia comes off, so whatever is soft behind it gets found.

Diagnosing it properly. Everything we get called to shows itself in one of six ways: paint peeling and blown on the face of a fascia, a board soft enough to take a screwdriver, a run that has dropped or sagged between brackets, a gutter pulled away from the wall, a leaking joint at a union, or an overflow in heavy rain when there is nothing in the run at all. The last one is the one people misread. If the gutter is clear and it still goes over, the problem is fall or profile, and no amount of clearing will fix it.

Off and open. Fascia, soffit, bargeboard and gutter come off together. That is the only point at which anyone can see the rafter feet, the wall plate and the bottom course of tiles, and it is where a job stops being about boards and starts being about carpentry. Soft rafter ends get spliced. A felt support tray goes in where the underfelt has torn back over the eaves, because that is the route water takes to get behind a fascia. A tilt fillet sets the bottom course so it drips into the gutter rather than over the back of it. Tiles lifted at the eaves or verge are refixed as BS 5534 expects. If the timber turns out sound and dry, capping the face and lining the soffit is a fair, cheaper job and we will tell you so.

What goes back, and in what. uPVC is the usual choice and it takes a bracket screw far better than tired softwood. Timber suits an older or moulded profile and gets primed on all four faces. Cast iron, where it survives, is worth rubbing down and repainting rather than removing. Aluminium is the one to price where a run is long and unbroken, because it can be formed in one length with no unions to fail. Gutter profile is a real decision, not a colour choice: half round is fine on a modest roof, and square, ogee or deepflow hold more water per metre where a big or steep slope sheds faster than half round can take it in driving rain.

Fall, downpipes and air. The run is re-hung on new brackets at proper centres, falling to the outlet. Hung level it stands full all year, which perishes the union seals and keeps a board wet from behind. Downpipes are clipped straight and finished with a shoe so the water discharges into a gully instead of at the wall, hopper heads are checked, and staining down brickwork or render usually tells us where a pipe has been missing its target for years. Then the eaves ventilation: new soffits go up with soffit vents, or an over fascia vent where the soffit is too narrow, with the air gap over the loft insulation kept clear, because closing it is how you turn a dry roof into a condensation problem. Approved Document F sets the figures. Open corners get closed so birds and wasps cannot nest behind a soffit, and we flag any outlet blocked with moss and debris off the tiles.

How it runs

From your call to a written price

A completed hipped roof with the eaves, fascia and gutter run finished
Every hip, every runA hipped roof is more eaves per house, and more to hang straight.

Same team from first visit to last, one person to ring, and no sub-contracting your work out to somebody you have never met. The quote is itemised, not a figure on the back of a card: access, the length of each run, stripping the old boards and gutter, the fascia, soffit and any bargeboard, the gutter, outlets and downpipes, and disposal on separate lines, so you can compare it properly against anyone else's.

Nothing is left open or unusable overnight. The site is swept at the end of each day rather than the end of the job, and what comes out leaves with us. If something turns up once we start that nobody could have seen, you get a photograph and a price before we carry on.

Renewing a roofline in the same materials is repair and maintenance, so no planning application and nothing for building control. Ferndown has no conservation area and nothing listed in it, which is unusual on this patch and genuinely useful: the material, the profile and the colour are entirely your decision, and Planning Portal guidance on roofs sets out where permitted development would stop if you were altering the roof itself.

Cost

What decides the price of a roofline

A roof part way through re-tiling, with the eaves course and the gutter visible
The bottom courseThe tiles have to drip into the gutter rather than behind it.

No rate per square metre, because a metre of fascia over a bay is not the same metre as one on a straight gable.

Getting to it. A bungalow with clear lawn all round, a chalet with a dormer cheek in the run, and a block of flats with the eaves over a parking court are three different jobs before a board comes off. A bungalow run comes off a tower, a two or three storey gable wants a scaffold, and a run over a conservatory or a bay window means building the platform around it. The work at height rules are why the access is a priced line rather than something absorbed into a rate.

What is behind the boards. Rotten fascia is a symptom. The question is whether the rafter feet and the wall plate behind it are still sound, and nobody knows until the old board comes off. Capping over with plastic hides that instead of fixing it, which is why we take the old boards off rather than clad them.

The run, not the metre. A straight gable is quick. Bay windows, a conservatory in the way, a corner return, a run that has to be worked around a satellite dish or a service cable, and every outlet, hopper and downpipe are priced one at a time. So is putting the fall back: a gutter hung level looks fine and holds water all year.

Comparing quotes? Ask whether the old boards are coming off or being capped over, what happens if the rafter feet or the wall plate turn out to be rotten, whether the gutter, outlets and downpipes are all being renewed or only the fascia, and whether the scaffold is in the price. Two quotes for the same job are usually two different jobs.

If a section has come away

A gutter hanging off, or a fascia gone through

Ring rather than use the form. A length of gutter pulled off its brackets, a downpipe snapped at the bend or a fascia soft enough to put your hand through goes to the front of the queue, because the next heavy rain runs straight down the wall and into the brickwork. The first visit is about getting it supported and discharging somewhere sensible, and we price the run properly once we can see how far the rot goes. We are just up the road, so on a run that has come away from the wall that is usually same day or next. The phone is answered 24 hours for emergencies; scheduled work runs Monday to Friday, 8am to 6pm.

Call now: 07435 839745

Worth knowing

A bungalow has twice the roofline and half the access cost

Ferndown is bungalow country, and a bungalow changes the arithmetic of this job in two directions at once. A bungalow has roughly twice the roof of a two storey house with the same floor area, which means far more eaves, more gutter, more brackets and usually more downpipes. So there is more of it to renew than people expect when they ring.

The other direction is in your favour. Everything is low. A single storey run over open lawn is tower work rather than scaffold work, so the access line on the quote is a fraction of what the same length would cost on a two or three storey gable. That is worth knowing when you are deciding whether to do the front now and the back next year, because doing the whole building in one visit while the tower is already up is almost always cheaper than two trips. The other bungalow point is ventilation. A bungalow loft is broad and shallow at the edges, insulation gets pushed right into the eaves, and the gap closes up. With the soffits off, putting that right is quick and cheap, and it is the difference between a dry roof space and damp insulation every winter.

Who you are dealing with

A local firm you can check

We cover Ferndown, West Parley, Longham, Stapehill and Wimborne, broadly BH22, under Dorset Council. You are dealing with Bournemouth Roofing & Building, the trading name of Bournemouth Roofing & Building Ltd, registered in England and Wales, company number 15471719, which you can look up in a minute. Thomas Hannen's business, and he is the one who comes out to price the job, not a salesman. A verified customer's 10 out of 10 on Checkatrade. The visit and the written quote are both free.

Questions

Ferndown questions we get asked

My gutter overflows but it is clean. Why?

Because clearing was never the problem. Either it is hung level or backfalling, so water sits and then spills at the low point, or the profile is too small for the roof above and a downpour simply arrives faster than it can leave.

Do you have to take the tiles off?

No. Only the bottom course gets lifted, and only enough to slide the felt support tray under it. The tiles go straight back down and nothing is left open overnight.

Can we just have the front done?

You can, and sometimes it is the sensible order. But if the access is going up anyway, doing the whole building in one visit usually costs less than two visits, and we will show you both on the quote.

We live in a flat. Can we arrange this ourselves?

Usually not. In a block the roof, the fascias and the rainwater goods belong to the freeholder and are looked after out of the service charge. We will survey and quote for a managing agent or a residents' company, and we will say plainly if you are not the person who can instruct it.

Is uPVC the only option?

No. Timber, cast iron and aluminium all have their place, and nothing here is designated, so the choice is genuinely yours. We will price two options side by side if that helps you decide.

Free quote

Get a price for your Ferndown roofline

Free site visit and a written itemised quote, with the boards, the gutter, the downpipes and the access priced line by line.