Rendering in West Lulworth

Half a mile from open sea, where the exposure of each elevation decides the coats, the beads and the base detail.

The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.

Less than a mile from open sea, a wall here takes more wind driven rain in a winter than the same wall would ten miles inland. That is a specification question rather than a weather complaint: it changes the thickness of the coats, the detailing at every opening, and sometimes whether to render at all.

The failures follow the weather. A crack that has opened at a window head on the seaward gable. Render gone hollow along the bottom of a wall. Dash flaking away on one elevation while the other three look fine. And staining or green growth on whichever wall the sun never reaches.

We tap the whole elevation, not the corner you rang about, and we look at which way the wall faces before we say anything about systems. Some of the old stone cottages here should not be rendered at all and we will say so. Everything else goes in writing, item by item. The site visit and the written itemised quote are both free.

The work

Render built for a wall that gets hit

A house elevation part way through rendering, old finish on one side and new render on the other
Half and halfThe old finish on one side, the new system on the other.

Silicone thin coat. Primer, a polymer basecoat with glass fibre mesh bedded through it, then a through-coloured silicone topcoat scraped to an even texture. It is water shedding, it flexes slightly and it stays cleaner than most finishes. On an exposed elevation the basecoat goes on at full thickness with the mesh properly buried, because a thin base is where these systems fail.

Monocouche. A single through-coloured coat put on thick and scraped back the next day. Hard wearing, and it wants a sound background and a settled spell of weather. Onshore wind and rain during the first few days is not a settled spell, so on the seaward side we plan it carefully or use something else.

Sand and cement, pebbledash and Tyrolean. Scratch coat, float coat, then a smooth face, a dry dash thrown on green, or a Tyrolean flicked on. The dash finishes here have lasted well because they are thick and rough, which sheds water. Matching a patch means matching aggregate size and colour, so a sample panel goes up first.

Lime render on the old walls. Solid rubble stone and old brick walls have no cavity and get rid of rain by drying out through their own face. They need lime, two or three coats, hair gauged in the base. Sealing one with a cement or acrylic coat traps the moisture and moves the damp indoors, which on this coast happens quickly.

Tapping and hacking off. Blown render has parted from its background. We tap the whole elevation and mark the hollow areas, and on a weather wall those areas are usually wider than they look, because water has been travelling behind the coat rather than sitting where it got in.

Cracks, delamination, algae and staining. Fine crazing is shrinkage. An open crack on an exposed elevation is an entry point and wants cutting out and reinforcing rather than filling. Green and black staining on a shaded wall comes off with a soft wash, not a pressure lance.

Render over external wall insulation. Board fixed as a render carrier, then mesh, basecoat and topcoat over it, with Approved Document L setting what a renovated wall is expected to reach. On an exposed elevation the edges and the base detail decide whether it lasts, so that is where our quote gets specific rather than where it goes vague.

How it runs

From your call to a written price

A rendered bungalow elevation finished and cleaned down, with beads and stop ends in place
Beads and stop endsWhere the render stops is where it is judged.

Same team from first visit to last, one person to ring, and no sub-contracting your work out to somebody you have never met. The quote is itemised, not a figure on the back of a card: access and scaffold, protection, preparation of the existing wall, the system and number of coats, beads and stop ends, and making good on separate lines, so you can compare it properly against anyone else's.

Nothing is left open or unusable overnight. The site is swept at the end of each day rather than the end of the job, and what comes out leaves with us. If something turns up once we start that nobody could have seen, you get a photograph and a price before we carry on.

Renewing an existing render like for like is maintenance and needs no application. The village is a conservation area and there are 43 listed entries in and around it, so covering a stone elevation that has never been rendered, or a marked change of colour on a frontage, is a planning question, and a listed building needs listed building consent first. Dorset Council is the authority and we look the address up before quoting.

Cost

What decides the price of a rendering job

No rate per square metre, because the square metres are the easy part; what is already on the wall decides the price.

Getting to it. A stone cottage on the village street, a bungalow above the cove and a two storey house facing the weather are three different platforms, and on this coast the wind decides how long one can safely stand. A bungalow gable comes off a tower, a three storey elevation wants a scaffold, and the platform has to stand for the whole system rather than a day. The work at height rules are why it is a priced line rather than something folded into a rate.

What is already on the wall. Rendering over sound brick is one job. Hacking off blown sand and cement, or a pebbledash that has parted from the background, is another, and it is the part nobody can see from the road. We tap the whole elevation before quoting, because the hollow areas set the hours.

The system, and what the wall behind it needs. Silicone thin coat over insulation, monocouche through-coloured, or traditional sand and cement all price differently and behave differently. On a solid wall that has to breathe, a plastic-rich modern system traps moisture and moves the problem inside, so the right system is a wall decision rather than a colour decision.

Comparing quotes? Ask which system is being quoted and how many coats, whether the old render is being hacked off or overlaid, whether beads, bellcast and stop ends are included, whether the scaffold is in the price, and what happens to the existing sills and pipework. Two quotes for the same job are usually two different jobs.

If it has started to come away

Render that has blown or cracked open

Ring rather than use the form. A section that sounds hollow when you tap it, or a crack you can get a coin into, is letting water behind the render and the frost does the rest. We make the loose area safe, sheet it if the weather is against us, and price the elevation once we can see how far the blown area actually goes. Get it sheeted before the next blow rather than after it, because on an exposed elevation a small area of loose render can strip a great deal further in one bad night. The phone is answered 24 hours for emergencies; scheduled work runs Monday to Friday, 8am to 6pm.

Call now: 07435 839745

Worth knowing

Exposure decides the build up, not the brochure

How much wind driven rain a wall gets is measurable, and it is the reason two identical houses can need different render specifications. The method for assessing exposure of walls to wind driven rain is a British Standard, and the short version is that exposure comes from how much rain falls, how hard the wind blows it and how sheltered the wall is by ground and buildings around it. Half a mile from open water with the prevailing weather coming straight in off the sea, a south west facing gable here is in a different category from a sheltered wall inland, and it needs to be treated like one.

What changes in practice is the build up rather than the brand. A thicker basecoat with the mesh properly buried instead of skimmed over. Beads and stop ends at every opening rather than render run tight to a frame. A bellcast at the base so water leaves the wall instead of tracking behind it. Cills with a proper drip so rain is thrown clear rather than run back under. And on the most exposed elevation, a finish with some texture to it, because a rough face sheds water better than a polished one. It costs more on that one wall than on the other three. That is the correct answer, and any quote that prices all four elevations identically has not looked at which way the house faces.

Who you are dealing with

A local firm you can check

We cover West Lulworth, East Lulworth, Winfrith, Wool and the villages along the Purbeck coast, broadly BH20, with Dorset Council for planning and building control. You are dealing with Bournemouth Roofing & Building, the trading name of Bournemouth Roofing & Building Ltd, registered in England and Wales, company number 15471719, which you can look up in a minute. Thomas Hannen's business, and he is the one who comes out to price the job, not a salesman. A verified customer's 10 out of 10 on Checkatrade. The visit and the written quote are both free.

Questions

West Lulworth questions we get asked

Should a stone cottage on the coast be rendered?

Often it should be left alone. Rubble stone walls here were built to weather and many carry lime pointing that only needs maintaining. Where a wall is genuinely letting water through, a lime render is the right answer, not a modern coat. Covering good stone with cement is the change that causes damp rather than curing it.

Why does only one side of our house keep failing?

Because only one side is getting the weather. The prevailing wind drives rain onto one or two elevations and barely touches the others, so the same render put on at the same time fails at different rates around a single house. It is normal, and it is why we price elevations separately rather than as one area.

Is a smooth finish or a textured one better here?

Textured, on the exposed walls. A rough face breaks up running water and sheds it, where a very smooth finish lets it sheet down and find any weakness at a joint or an opening. Smooth looks sharper and is best kept for sheltered elevations. We will show you both on sample panels on your own wall.

Can you render in the winter on an exposed site?

Preparation and hacking off, yes. Coating, only with a good forecast. A green coat that gets driving rain or frost in its first few days is a wall we would be returning to, so we sheet the scaffold and wait rather than push on. The quote sets out the sequence so you can see where the waiting is.

Free quote

Price the weather elevation properly

Thomas taps each elevation, works out which walls take the weather and itemises the build up for them. The visit and the written quote are free.