Flat roofing in Spetisbury

Garage roofs, porches, bay tops and extension roofs across Spetisbury and DT11. We check the deck and the fall before quoting, and put the price in writing.

The site visit is free and so is the written itemised quote. Thomas Hannen prices every job himself.

Last updated

A flat roof in Spetisbury that has failed once will usually fail again in the same spot, because the fault is in the fall or the detailing rather than the covering. We find that first, then price the job that actually fixes it.

Most flat roof work in Spetisbury is small and straightforward. A garage roof that has split. A porch or a bay top that drips. A back extension where the covering has gone hard and the upstand has lifted away from the wall.

We come out to Spetisbury, get on the roof, and follow the water back to where it is genuinely entering rather than sealing over the place the stain shows. Where there is a sensible spot to open a corner, we open one, because the state of the deck is what decides whether this is a day or three. Then you get photographs and a written price with the elements on separate lines. If the porch, bay top or back extension is dripping indoors as it rains, ring 07435 839745.

The work

The everyday flat roof jobs around the village

A felt flat roof on an extension, with the parapet coping being bedded on top (illustrative photo for flat roofing in Spetisbury)
It fails at the edgeUpstands, copings and the lead. Almost nothing fails in the middle. Illustrative photo.

What is up there now. Felt, nearly always. Either a three layer built up system finished with a mineral cap sheet, or a single torch on layer laid straight over the covering before it.

It fails with splits along the creases where the sheet has been folded, blisters where damp was sealed in underneath, and a lifted or failed seam where the covering turns up an upstand. The last one is the worst, because water then travels under the whole roof.

What we put back. EPDM rubber on a plain rectangle, bonded down in one sheet so there is no lap or seam anywhere in the open part of the roof. GRP fibreglass where a roof has kerbs, corners and upstands to laminate round, or where somebody will walk on it. Single ply, hot air welded, on a longer run.

The deck and the fall. Under the covering is plywood, OSB or chipboard decking on joists, with firrings on top making the fall towards the outlet. Chipboard that has been wet swells, gives underfoot and has to come off, and it is the single biggest swing in the price. A roof laid dead flat holds standing water, and ponding in the same corner every winter will finish a new covering as surely as it finished the old one. BS 6229 sets out the falls, and where re-firring will not work we form them in tapered insulation.

Heated rooms need the insulation moving. Renewing a covering over a kitchen or a bedroom brings the insulation into scope under Part L. On a flat roof the right place for it is above the deck, on a vapour control layer, in PIR, with the membrane over the top. That is a warm roof, and everything structural stays dry. The old cold roof, insulated between the joists, puts the boards below the dew point, so interstitial condensation forms inside the build up and rots them from above while the covering still looks sound. Building control are notified and inspect it open.

Edges, junctions and openings. These take the time, and they are the parts a cheap quote leaves out. A chase raked into the wall at the abutment, lead dressed into it as a cover flashing, a cavity tray above it. A coping on the parapet with an apron below. A kerb under every rooflight, lantern, Velux style flat roof window, hatch and soil or vent pipe, so the covering turns up an upstand. A drip trim on the free edges. And a rainwater outlet running to a hopper, a downpipe or the gutter. A garage is a day, an extension two or three working days, and we say how long first.

How it runs

Re-covering a garage, porch or extension roof, start to finish

A stripped pitched roof with breathable membrane and battens going back on (illustrative photo for flat roofing in Spetisbury)
Stripped back firstWhatever goes on top, what is underneath decides the price. Illustrative photo.

Thomas comes out from Boscombe, 14.2 miles away, and looks at the flat roof from on top and from underneath. On a garage he can usually see the deck boards from inside, and on an extension he checks the ceiling below for staining.

He writes the price himself. The quote separates the tower or scaffold, stripping the old felt, any deck boards that need replacing, firrings to put a fall back, insulation where the roof is over a heated room, the new membrane, each upstand and outlet, the drip and edge trims, and the skip. You deal with one company for the whole job.

Plenty of the late sixties and early seventies houses in Spetisbury have a flat roofed garage, porch or back extension from the same time. A garage on a drive is easy to reach. An extension behind a terrace means carrying everything down a side passage, or through the house under dust sheets. A roof is never left stripped overnight: whatever is opened in the morning is covered before we leave. If the deck turns out worse than it looked, Thomas sends you a photo with the extra cost, and nothing more is replaced until you agree.

Re-covering in the same place and shape needs no planning permission, and no conservation area covers Spetisbury. Where most of a roof over a heated room is renewed, building control applies and the insulation has to meet current standards. Dorset Council deals with that, and with listed building consent on the listed buildings in the parish.

Cost

Where the time goes on a flat roof of this age

A finished grey flat roof with three rooflights set into it (one of our own jobs, shown for flat roofing in Spetisbury)
Falls, then coveringThe water needs somewhere to go before a roll comes off the van. Photo from one of our own jobs.

A Spetisbury flat roof has no rate per square metre. Laying the membrane is the quick part. What sits under it decides the price.

The deck. Spetisbury garages and extensions from the sixties and seventies were often decked in chipboard, and chipboard that has taken water for years sags between the joists and crumbles at the edges. Sound boards stay. Soft boards come out. Thomas lifts an edge or looks from inside before he quotes, because nobody can tell from the ground.

A heated room underneath, or not. Over a garage the roof can go straight back. Over a kitchen or a bedroom it needs insulation board to meet Approved Document L, which raises the roof, and that can mean lifting the upstands and trims and working round a window head or a door.

The fall. Many Spetisbury roofs of this age were laid nearly dead flat and hold puddles for days. Firrings to build a proper fall add timber and time, and they stop the new covering ponding in the same spot as the old one.

Getting to it. A garage off a drive takes a tower. An extension at the back of a terrace needs every board and roll carried through, and the work at height rules still decide the platform.

Ask anyone else quoting which membrane they are laying, EPDM, GRP or torch-on felt, whether the deck is being replaced or covered over, and whether the falls and insulation are in their price.

If it is coming through

A split or blistered flat roof letting water in

Stand a bucket under the drip and keep people out from under any ceiling that has started to bulge. In a garage, lift anything you want dry off the floor. Spetisbury flat roofs of this age usually fail at an upstand against the house wall, or where an outlet has choked and the water has sat and found a seam.

On the first visit we clear the outlet, patch or sheet the split, and check how wet the deck has got, so the room stays dry until the full repair is priced. Booked jobs run Monday to Friday, 8am to 6pm. With water coming through, ring us; the form is slower. If we cannot answer straight away, we phone you back as soon as we can.

Call now: 07435 839745

Worth knowing

Here the covering really is your choice, so choose it on merit

Plenty of Dorset villages come with a conservation area over the housing and a long list of controls on what a roof can be. Spetisbury does not. For most addresses in the village there is nothing to apply for and nobody to satisfy on appearance, which means the covering on your garage or your extension is genuinely your decision.

In Spetisbury that freedom is worth spending in the right place, and it is almost never on the covering itself. A premium membrane laid over a soft deck and a fall that goes nowhere will fail on the same timetable as a cheap one. So if there is money to put anywhere, put it into replacing tired decking, into firrings that give the roof a real fall, and into a properly sized outlet with somewhere for the water to go. Then pick the covering that suits the shape of the roof. We quote it that way round, with the deck and the falls as their own lines, so you can see exactly what you are buying and what you are choosing to leave.

Who you are dealing with

Your flat roofer for the Stour villages

We cover Spetisbury, Charlton Marshall, Sturminster Marshall and north to Blandford Forum. Boscombe, where our base is, lies 14.2 miles away, and building control for all of these villages sits with Dorset Council.

You would be dealing with Bournemouth Roofing & Building Ltd, incorporated under company number 15471719 and registered in England and Wales. The business belongs to Thomas Hannen, and he is the one who gets up on the flat roof and puts the price together. On Checkatrade, a customer whose job was verified rated us 10 out of 10. Nothing is charged for the site visit or for the itemised written quote. Before you book a visit in Spetisbury, you can read our customers' Google reviews, word for word, on our reviews page.

Planning at a glance

Do you need planning permission in Spetisbury?

Most repairs in Spetisbury need no application at all. What decides whether a change to the outside of your house does is who the council is, whether a conservation area or a listing applies, and whether the place sits in a protected landscape.

The planning position in Spetisbury, from council and national records.
Question In Spetisbury
Who decides Dorset Council is the planning authority for Spetisbury. Dorset Council's heritage pages set out what it controls.
Conservation area None covers Spetisbury, so a like-for-like repair is ordinary maintenance.
Listed buildings Yes, there are listed buildings in and around Spetisbury. If yours is one, work can need listed building consent.
Protected landscape No National Park or National Landscape covers Spetisbury.

Questions

Questions about flat roofs in Spetisbury

Is it worth repairing, or should I just have it re-covered?

If the covering is sound apart from one split or a lifted lap, a repair is honest work and we will do it. If it is brittle across the whole roof, or the deck has gone soft, you would be paying twice. Opening a corner settles the argument.

How long does a flat roof take?

A single garage in EPDM is a day. An extension with a new deck, new firrings and a warm roof build up is two or three working days once we are set up. We will not open a deck we cannot close and make watertight the same day.

Do I need to be at home?

For the first visit it helps, because seeing the ceiling below tells us where the water is landing. After that, no. Everything happens outside and nothing is left open or unusable overnight.

Will a new flat roof stop the damp on my extension ceiling?

If the damp is coming through the roof, yes. If it is condensation, a new covering on its own will not touch it, and the answer is a warm roof build up with the insulation above the deck. We will tell you which one you have got before you spend anything.

Free quote

Get a price for your Spetisbury flat roof

Tell us the address and what you have noticed. We will come out, open a corner where we can, and put an itemised price in writing. No charge, and no obligation.